Polaris Intelligence
Polaris
Intelligence
About
Ctrl K
Sign in
© Polaris Intelligence 2026
PrivacyTermsAdmin
Launch Vehicles
Vehicle family profile

New Glenn

Family-level launch record combining canonical variants, historical missions, public cadence forecasts, and available payload performance specs.

Blue OriginActive
Admin
Variants
1
Canonical variants linked to this family.
Historical missions
3
Missions in the public mission table with actual launch dates.
Peak listed capacity
45,000 kg
Maximum payload capacity across listed variants and orbits.

Launch Cadence

Historical missions are grouped by actual launch year. Forecast cadence uses family-level launch-rate rows.

YearHistorical missionsForecast launches
202520
202613
202705
202808
2029011
2030014
2031018
2032022
2033024
2034024
2035024
2036024
2037024
2038024
2039024
2040024
2041024

Performance Specs

Payload capacity by variant and target orbit when structured capacity rows are available.

VariantOrbitCapacityAltitudeInclinationSource
New Glenn 7x2
LEO45,000 kgUnknownUnknownBlue Origin New Glenn vehicle page
New Glenn 7x2
GTO13,600 kgUnknownUnknownBlue Origin New Glenn vehicle page

Recent Missions

Latest launched missions using variants in this family.

MissionVariantLaunch
SpaceMobile-007 Mission
New Glenn 7x2
Apr 19, 2026
ESCAPADE
New Glenn 7x2
Nov 13, 2025
Blue Ring Pathfinder Mission
New Glenn 7x2
Jan 16, 2025

Forecasted Missions

Upcoming mission rows with announced launch timing.

MissionVariant

Variants

Canonical variants rolled up into this launch vehicle family.

VariantStagesMissionsStatus
New Glenn 7x2
Not stated3Active

Forecast Location Split

2 launch locations represented.

YearLocationLaunchesConfidenceBasis
2026Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida)350%New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, fa...
2026Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California)045%Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a...
2027Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida)550%New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, fa...
2027Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California)045%Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a...
2028Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida)850%New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, fa...
2028Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California)045%Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a...
2029Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida)1050%New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, fa...
2029Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California)145%Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a...
2030Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida)1250%New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, fa...
2030Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California)245%Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a...
2031Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida)1450%New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, fa...
2031Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California)445%Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a...
2032Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida)1650%New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, fa...
2032Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California)645%Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a...
2033Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida)1650%New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, fa...
2033Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California)845%Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a...
2034Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida)1650%New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, fa...
2034Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California)845%Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a...
2035Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida)1650%New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, fa...
2035Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California)845%Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a...
2036Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida)1650%New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, fa...
2036Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California)845%Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a...
2037Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida)1650%New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, fa...
2037Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California)845%Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a...
Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida)
2026 · 50% confidence
3

New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, factory flow, and cust...

Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California)
2026 · 45% confidence
0

Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a multi-year ramp.

Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida)
2027 · 50% confidence
5

New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, factory flow, and cust...

Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California)
2027 · 45% confidence
0

Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a multi-year ramp.

Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida)
2028 · 50% confidence
8
New Glenn 7x2
TLI
7,000 kg
Unknown
Unknown
Wikipedia New Glenn (citing Blue Origin official specs)
Announced

No forecasted missions

No upcoming announced mission rows are linked to this vehicle family.

Track

New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, factory flow, and cust...

Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California)
2028 · 45% confidence
0

Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a multi-year ramp.

Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida)
2029 · 50% confidence
10

New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, factory flow, and cust...

Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California)
2029 · 45% confidence
1

Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a multi-year ramp.

Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida)
2030 · 50% confidence
12

New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, factory flow, and cust...

Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California)
2030 · 45% confidence
2

Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a multi-year ramp.

Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida)
2031 · 50% confidence
14

New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, factory flow, and cust...

Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California)
2031 · 45% confidence
4

Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a multi-year ramp.

Mentions
883
All verified mentions of this launch vehicle family in source documents.
0.0-5.0
Actions

New Glenn's GS2 is being transported to LC-36 in preparation for its upcoming hotfire.

PlanValue 4.0Dec 4, 2025RT by @GewoonLukas_: Another New Glenn's GS2 is being transported to LC-36 today in preparation for its upcoming hotfire.

Blue Origin has transitioned from a test project to a product with New Glenn.

Capability
Page21of45
Value 3.0
Dec 1, 2025
Our best energy and efforts

The New Glenn 9×4 is designed for missions requiring substantial additional capacity and performance.

CapabilityPlanValue 2.0Dec 1, 2025Blue Origin Announces New Glenn “Block 2” Upgrades

Blue Origin plans to develop a 'Block 2' variant of the New Glenn rocket to increase payload performance.

PlanCapabilityValue 4.0Dec 1, 2025Blue Origin Announces New Glenn “Block 2” Upgrades

The New Glenn 9×4 will feature a larger 8.7-meter fairing to accommodate bulkier payloads.

CapabilityValue 4.0Dec 1, 2025Blue Origin Announces New Glenn “Block 2” Upgrades

Blue Origin's New Glenn demonstrates engineering management capabilities that can extend to lunar lander development.

CapabilityValue 1.8Dec 1, 2025Our best energy and efforts

The New Glenn 9×4 targets a payload capacity of over 70 metric tons to low-Earth orbit and over 14 metric tons direct to geosynchronous orbit.

CapabilityValue 4.6Dec 1, 2025Blue Origin Announces New Glenn “Block 2” Upgrades

Investing $2 billion in New Glenn at $200 million per launch can deliver greater payloads and capabilities for lunar missions.

RelationshipsFinancialCapabilityValue 3.5Dec 1, 2025Our best energy and efforts

The propulsion enhancements will benefit customers manifested on New Glenn for various missions, including low-Earth orbit and lunar missions.

CapabilityPlanValue 2.2Dec 1, 2025Blue Origin Announces New Glenn “Block 2” Upgrades

Blue Origin is introducing a new super-heavy class rocket variant named New Glenn 9×4.

PlanCapabilityValue 3.0Dec 1, 2025Blue Origin Announces New Glenn “Block 2” Upgrades

New Glenn is expected to carry a payload to the Moon on its third flight.

PlanValue 4.0Dec 1, 2025Our best energy and efforts

Blue Origin's New Glenn has completed a successful test campaign similar to Saturn V.

CapabilityValue 3.8Dec 1, 2025Our best energy and efforts

New Glenn confirmed its operational portfolio, including first stage recovery, on its second successful flight.

CapabilityValue 4.0Dec 1, 2025Our best energy and efforts

New Glenn 9x4 or Falcon Heavy may be considered for future lunar missions.

PlanValue 2.0Dec 1, 2025Our best energy and efforts

The total thrust of the two BE-3Us powering New Glenn’s upper stage will increase from 320,000 lbf to 400,000 lbf.

CapabilityPlanValue 4.2Dec 1, 2025Blue Origin Announces New Glenn “Block 2” Upgrades

A Blue Ring pathfinder mission launched early in 2023 on the first New Glenn mission.

PlanGeneralValue 3.0Nov 26, 2025Latest News

Rocket Lab built both spacecraft, which launched on November 13 on a Blue Origin New Glenn rocket from Cape Canaveral Space Force Station.

CapabilityGeneralValue 4.0Nov 26, 2025ESCAPADE spacecraft capture first images while en route to Mars

Blue Origin, led by Jeff Bezos, announced an upgrade plan for its New Glenn rocket, naming the new model 'New Glenn 9×4' for its configuration of nine engines in the first stage and four in the upper stage.

PlanCapabilityValue 4.0Nov 26, 202511/26宇宙ニュース・栗田工業、ISS「きぼう」の民間後継機の協議・連携に参画 ほか3件

New Glenn 9×4 features an 8.7-meter fairing and can launch over 70 tons to low Earth orbit (LEO), over 14 tons to geostationary orbit (GEO), and over 20 tons to lunar transfer orbits.

CapabilityValue 4.8Nov 26, 202511/26宇宙ニュース・栗田工業、ISS「きぼう」の民間後継機の協議・連携に参画 ほか3件

Blue Origin plans to launch New Glenn 9×4 alongside the current New Glenn 7×2 to provide more launch options for megaconstellation construction, lunar and deep space exploration, and U.S. government needs related to missile warning and defense initiatives like 'Golden Dome'.

PlanGeneralValue 4.3Nov 26, 202511/26宇宙ニュース・栗田工業、ISS「きぼう」の民間後継機の協議・連携に参画 ほか3件