Polaris Intelligence
Polaris
Intelligence
About
Ctrl K
Sign in
© Polaris Intelligence 2026
PrivacyTermsAdmin
Launch Vehicles
Vehicle family profile

New Glenn

Family-level launch record combining canonical variants, historical missions, public cadence forecasts, and available payload performance specs.

Blue OriginActive
Admin
Variants
1
Canonical variants linked to this family.
Historical missions
3
Missions in the public mission table with actual launch dates.
Peak listed capacity
45,000 kg
Maximum payload capacity across listed variants and orbits.

Launch Cadence

Historical missions are grouped by actual launch year. Forecast cadence uses family-level launch-rate rows.

YearHistorical missionsForecast launches
202520
202613
202705
202808
2029011
2030014
2031018
2032022
2033024
2034024
2035024
2036024
2037024
2038024
2039024
2040024
2041024

Performance Specs

Payload capacity by variant and target orbit when structured capacity rows are available.

VariantOrbitCapacityAltitudeInclinationSource
New Glenn 7x2
LEO45,000 kgUnknownUnknownBlue Origin New Glenn vehicle page
New Glenn 7x2
GTO13,600 kgUnknownUnknownBlue Origin New Glenn vehicle page

Recent Missions

Latest launched missions using variants in this family.

MissionVariantLaunch
SpaceMobile-007 Mission
New Glenn 7x2
Apr 19, 2026
ESCAPADE
New Glenn 7x2
Nov 13, 2025
Blue Ring Pathfinder Mission
New Glenn 7x2
Jan 16, 2025

Forecasted Missions

Upcoming mission rows with announced launch timing.

MissionVariant

Variants

Canonical variants rolled up into this launch vehicle family.

VariantStagesMissionsStatus
New Glenn 7x2
Not stated3Active

Forecast Location Split

2 launch locations represented.

YearLocationLaunchesConfidenceBasis
2026Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida)350%New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, fa...
2026Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California)045%Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a...
2027Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida)550%New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, fa...
2027Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California)045%Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a...
2028Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida)850%New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, fa...
2028Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California)045%Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a...
2029Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida)1050%New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, fa...
2029Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California)145%Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a...
2030Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida)1250%New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, fa...
2030Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California)245%Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a...
2031Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida)1450%New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, fa...
2031Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California)445%Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a...
2032Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida)1650%New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, fa...
2032Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California)645%Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a...
2033Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida)1650%New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, fa...
2033Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California)845%Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a...
2034Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida)1650%New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, fa...
2034Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California)845%Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a...
2035Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida)1650%New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, fa...
2035Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California)845%Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a...
2036Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida)1650%New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, fa...
2036Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California)845%Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a...
2037Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida)1650%New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, fa...
2037Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California)845%Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a...
Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida)
2026 · 50% confidence
3

New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, factory flow, and cust...

Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California)
2026 · 45% confidence
0

Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a multi-year ramp.

Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida)
2027 · 50% confidence
5

New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, factory flow, and cust...

Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California)
2027 · 45% confidence
0

Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a multi-year ramp.

Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida)
2028 · 50% confidence
8
New Glenn 7x2
TLI
7,000 kg
Unknown
Unknown
Wikipedia New Glenn (citing Blue Origin official specs)
Announced

No forecasted missions

No upcoming announced mission rows are linked to this vehicle family.

Track

New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, factory flow, and cust...

Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California)
2028 · 45% confidence
0

Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a multi-year ramp.

Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida)
2029 · 50% confidence
10

New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, factory flow, and cust...

Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California)
2029 · 45% confidence
1

Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a multi-year ramp.

Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida)
2030 · 50% confidence
12

New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, factory flow, and cust...

Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California)
2030 · 45% confidence
2

Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a multi-year ramp.

Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida)
2031 · 50% confidence
14

New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, factory flow, and cust...

Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California)
2031 · 45% confidence
4

Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a multi-year ramp.

Mentions
883
All verified mentions of this launch vehicle family in source documents.
0.0-5.0
Actions

The internal demand from Project Kuiper guarantees frequent launches for New Glenn.

RelationshipsPlanValue 3.5Dec 15, 2025Blue Origin’s Heavy Hitter: New Glenn Takes the Stage

K2 Space is building satellites sized for rockets including Falcon 9, Starship, and New Glenn.

Page20of45
CapabilityValue 4.0Dec 15, 2025K2 Space raises 250m to scale Mega class high power satellites

New Glenn has a 7-meter payload fairing that offers twice the payload volume of standard 5-meter class commercial launch systems.

CapabilityValue 4.0Dec 15, 2025Blue Origin’s Heavy Hitter: New Glenn Takes the Stage

K2 Space is developing a larger spacecraft line called Giga for super heavy lift vehicles like Starship and New Glenn.

PlanCapabilityValue 3.6Dec 15, 2025K2 Space raises 250m to scale Mega class high power satellites

New Glenn is designed for operational reusability.

CapabilityValue 3.5Dec 15, 2025Blue Origin’s Heavy Hitter: New Glenn Takes the Stage

New Glenn is designed to land downrange on a moving vessel named Jacklyn.

CapabilityPlanValue 4.0Dec 15, 2025Blue Origin’s Heavy Hitter: New Glenn Takes the Stage

Blue Origin is developing the New Glenn rocket to fundamentally alter the economics of heavy-lift launch.

CapabilityValue 3.0Dec 15, 2025Blue Origin’s Heavy Hitter: New Glenn Takes the Stage

New Glenn can launch entire constellations of satellites, massive optical telescopes, or deep-space habitation modules in a single trip.

CapabilityValue 2.5Dec 15, 2025Blue Origin’s Heavy Hitter: New Glenn Takes the Stage

New Glenn allows Blue Origin to refine refurbishment operations and lower costs for third-party customers, including NASA and the US Space Force.

CapabilityRelationshipsFinancialValue 3.6Dec 15, 2025Blue Origin’s Heavy Hitter: New Glenn Takes the Stage

K2 Space designs massive, high-power platforms intended to maximize the throw-weight capabilities of next-generation launch vehicles like SpaceX’s Starship and Blue Origin’s New Glenn.

CapabilityPlanValue 2.8Dec 14, 2025K2 Space Secures $250M Series C at $3B Valuation to Scale ‘Mega Class’ Manufacturing

The New Glenn GS2 is a key component of Blue Origin's orbital launcher architecture.

GeneralValue 2.0Dec 13, 2025Blue Origin completa un hotfire test sul secondo stadio New Glenn GS2

The completion of the 15-second hotfire test of the New Glenn GS2 signifies a concrete transition from development to operational preparation.

PlanCapabilityValue 4.0Dec 13, 2025Blue Origin completa un hotfire test sul secondo stadio New Glenn GS2

The second stage of New Glenn GS2 is designed to operate during the final phases of ascent.

CapabilityValue 3.5Dec 13, 2025Blue Origin completa un hotfire test sul secondo stadio New Glenn GS2

Blue Origin is solidifying its path towards the first flight of the New Glenn program.

PlanGeneralValue 2.0Dec 13, 2025Blue Origin completa un hotfire test sul secondo stadio New Glenn GS2

The existence of multiple serial units indicates that the New Glenn GS2 is part of an evolving production line, not just a single prototype.

GrowthPlanValue 1.6Dec 13, 2025Blue Origin completa un hotfire test sul secondo stadio New Glenn GS2

Dave Limp stated that the successful test confirms the increasing maturity of the New Glenn program.

CapabilityValue 2.0Dec 13, 2025Blue Origin completa un hotfire test sul secondo stadio New Glenn GS2

The completion of the hotfire test marks a significant step in the preparation of the New Glenn launcher for flight.

PlanValue 3.6Dec 13, 2025Blue Origin completa un hotfire test sul secondo stadio New Glenn GS2

K2 Space plans to launch its Giga line of satellites, which require a super-heavy rocket like SpaceX’s Starship or Blue Origin’s New Glenn.

PlanCapabilityValue 3.5Dec 12, 2025K2 Space Raises $250M Series C

The New Glenn team is ramping up GS2 engine production.

GrowthCapabilityValue 3.0Dec 12, 2025RT by @GewoonLukas_: Another GS2 ready to fly. We completed a 15-second hotfire with serial number 4 today. Incredible work by our New Glenn team ramping GS2 production.

Blue Origin is shifting its strategy to move beyond launch services (New Glenn) and suborbital tourism (New Shepard) into the space services sector.

PlanGeneralValue 3.3Dec 11, 2025Blue Origin Developing “Orbital Data Center”