Family-level launch record combining canonical variants, historical missions, public cadence forecasts, and available payload performance specs.
Historical missions are grouped by actual launch year. Forecast cadence uses family-level launch-rate rows.
| Year | Historical missions | Forecast launches |
|---|---|---|
| 2025 | 2 | 0 |
| 2026 | 1 | 3 |
| 2027 | 0 | 5 |
| 2028 | 0 | 8 |
| 2029 | 0 | 11 |
| 2030 | 0 | 14 |
| 2031 | 0 | 18 |
| 2032 | 0 | 22 |
| 2033 | 0 | 24 |
| 2034 | 0 | 24 |
| 2035 | 0 | 24 |
| 2036 | 0 | 24 |
| 2037 | 0 | 24 |
| 2038 | 0 | 24 |
| 2039 | 0 | 24 |
| 2040 | 0 | 24 |
| 2041 | 0 | 24 |
Payload capacity by variant and target orbit when structured capacity rows are available.
| Variant | Orbit | Capacity | Altitude | Inclination | Source |
|---|---|---|---|---|---|
New Glenn 7x2 | LEO | 45,000 kg | Unknown | Unknown | Blue Origin New Glenn vehicle page |
New Glenn 7x2 | GTO | 13,600 kg | Unknown | Unknown | Blue Origin New Glenn vehicle page |
Latest launched missions using variants in this family.
| Mission | Variant | Launch |
|---|---|---|
| SpaceMobile-007 Mission | New Glenn 7x2 | Apr 19, 2026 |
| ESCAPADE | New Glenn 7x2 | Nov 13, 2025 |
| Blue Ring Pathfinder Mission | New Glenn 7x2 | Jan 16, 2025 |
Upcoming mission rows with announced launch timing.
| Mission | Variant |
|---|
Canonical variants rolled up into this launch vehicle family.
| Variant | Stages | Missions | Status |
|---|---|---|---|
New Glenn 7x2 | Not stated | 3 | Active |
2 launch locations represented.
| Year | Location | Launches | Confidence | Basis |
|---|---|---|---|---|
| 2026 | Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida) | 3 | 50% | New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, fa... |
| 2026 | Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California) | 0 | 45% | Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a... |
| 2027 | Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida) | 5 | 50% | New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, fa... |
| 2027 | Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California) | 0 | 45% | Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a... |
| 2028 | Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida) | 8 | 50% | New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, fa... |
| 2028 | Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California) | 0 | 45% | Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a... |
| 2029 | Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida) | 10 | 50% | New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, fa... |
| 2029 | Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California) | 1 | 45% | Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a... |
| 2030 | Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida) | 12 | 50% | New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, fa... |
| 2030 | Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California) | 2 | 45% | Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a... |
| 2031 | Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida) | 14 | 50% | New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, fa... |
| 2031 | Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California) | 4 | 45% | Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a... |
| 2032 | Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida) | 16 | 50% | New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, fa... |
| 2032 | Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California) | 6 | 45% | Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a... |
| 2033 | Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida) | 16 | 50% | New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, fa... |
| 2033 | Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California) | 8 | 45% | Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a... |
| 2034 | Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida) | 16 | 50% | New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, fa... |
| 2034 | Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California) | 8 | 45% | Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a... |
| 2035 | Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida) | 16 | 50% | New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, fa... |
| 2035 | Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California) | 8 | 45% | Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a... |
| 2036 | Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida) | 16 | 50% | New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, fa... |
| 2036 | Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California) | 8 | 45% | Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a... |
| 2037 | Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida) | 16 | 50% | New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, fa... |
| 2037 | Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California) | 8 | 45% | Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a... |
New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, factory flow, and cust...
Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a multi-year ramp.
New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, factory flow, and cust...
Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a multi-year ramp.
New Glenn 7x2 |
| TLI |
| 7,000 kg |
| Unknown |
| Unknown |
| Wikipedia New Glenn (citing Blue Origin official specs) |
| Announced |
|---|
No forecasted missionsNo upcoming announced mission rows are linked to this vehicle family. |
New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, factory flow, and cust...
Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a multi-year ramp.
New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, factory flow, and cust...
Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a multi-year ramp.
New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, factory flow, and cust...
Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a multi-year ramp.
New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, factory flow, and cust...
Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a multi-year ramp.
Blue Origin’s New Glenn rocket exploded during a static-fire test on the launch pad in May.
NASA’s Artemis III team plans a launch with Blue Origin’s New Glenn as the primary option for the lunar lander program.
A late-June 2026 ground test anomaly that caused an upper-stage explosion sidelined Blue Origin’s New Glenn rocket and reduced near-term launch availability.
AST SpaceMobile originally partnered with Blue Origin to launch 45 BlueBird satellites on the New Glenn rocket.
Blue Origin’s New Glenn has followed Falcon 9 in booster recovery and reuse.
Blue Origin plans to return its New Glenn heavy-lift rocket to flight by the end of this year after a pad-side anomaly during a hotfire test in late May at Launch Complex 36 in Florida.
Blue Origin has completed the first two phases of a five-phase New Glenn recovery plan and is working on design and repair work tied to a new operations concept.
United Launch Alliance’s Vulcan Centaur and Blue Origin’s New Glenn are among the programs affected by the Inconel 718 shortage.
Amazon has secured up to 27 launches on Blue Origin’s New Glenn for its internet constellation.
Blue Origin is testing New Glenn as a super heavy lift launch vehicle.
Blue Origin is targeting a return to flight of New Glenn before the end of the year.
Blue Origin reengineered launch infrastructure in Cape Canaveral after New Glenn exploded on the launch pad this spring.
In May 2026, a New Glenn heavy-lift rocket anomaly during an integrated static-fire hot-fire test at Cape Canaveral damaged the pad’s primary transporter-erector gantry.
A pad-side anomaly during a hotfire test in late May occurred at Launch Complex 36 in Florida and delayed New Glenn’s return to flight.
Blue Origin continues to build New Glenn vehicles at its manufacturing facilities while pad reconstruction continues.
Under Blue Origin’s revised launch operations concept, a crane raises New Glenn into vertical position, places it on a refurbished launch table, and connects umbilicals from the main tower.
Blue Origin plans to return its New Glenn heavy-lift rocket to flight by the end of 2026.
Blue Origin’s revised launch operations concept uses existing facilities to mate New Glenn horizontally before rolling the vehicle to the pad on a transporter.
Early analysis of the anomaly points to the aft section of New Glenn’s first stage.
Blue Origin’s new launch operations concept is intended to be a common approach for multiple pads supporting New Glenn’s nine-engine first stage and four-engine upper stage.