Polaris Intelligence
Polaris
Intelligence
About
Ctrl K
Sign in
© Polaris Intelligence 2026
PrivacyTermsAdmin
Launch Vehicles
Vehicle family profile

New Glenn

Family-level launch record combining canonical variants, historical missions, public cadence forecasts, and available payload performance specs.

Blue OriginActive
Admin
Variants
1
Canonical variants linked to this family.
Historical missions
3
Missions in the public mission table with actual launch dates.
Peak listed capacity
45,000 kg
Maximum payload capacity across listed variants and orbits.

Launch Cadence

Historical missions are grouped by actual launch year. Forecast cadence uses family-level launch-rate rows.

YearHistorical missionsForecast launches
202520
202613
202705
202808
2029011
2030014
2031018
2032022
2033024
2034024
2035024
2036024
2037024
2038024
2039024
2040024
2041024

Performance Specs

Payload capacity by variant and target orbit when structured capacity rows are available.

VariantOrbitCapacityAltitudeInclinationSource
New Glenn 7x2
LEO45,000 kgUnknownUnknownBlue Origin New Glenn vehicle page
New Glenn 7x2
GTO13,600 kgUnknownUnknownBlue Origin New Glenn vehicle page

Recent Missions

Latest launched missions using variants in this family.

MissionVariantLaunch
SpaceMobile-007 Mission
New Glenn 7x2
Apr 19, 2026
ESCAPADE
New Glenn 7x2
Nov 13, 2025
Blue Ring Pathfinder Mission
New Glenn 7x2
Jan 16, 2025

Forecasted Missions

Upcoming mission rows with announced launch timing.

MissionVariant

Variants

Canonical variants rolled up into this launch vehicle family.

VariantStagesMissionsStatus
New Glenn 7x2
Not stated3Active

Forecast Location Split

2 launch locations represented.

YearLocationLaunchesConfidenceBasis
2026Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida)350%New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, fa...
2026Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California)045%Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a...
2027Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida)550%New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, fa...
2027Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California)045%Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a...
2028Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida)850%New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, fa...
2028Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California)045%Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a...
2029Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida)1050%New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, fa...
2029Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California)145%Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a...
2030Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida)1250%New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, fa...
2030Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California)245%Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a...
2031Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida)1450%New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, fa...
2031Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California)445%Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a...
2032Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida)1650%New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, fa...
2032Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California)645%Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a...
2033Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida)1650%New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, fa...
2033Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California)845%Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a...
2034Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida)1650%New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, fa...
2034Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California)845%Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a...
2035Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida)1650%New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, fa...
2035Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California)845%Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a...
2036Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida)1650%New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, fa...
2036Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California)845%Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a...
2037Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida)1650%New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, fa...
2037Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California)845%Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a...
Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida)
2026 · 50% confidence
3

New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, factory flow, and cust...

Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California)
2026 · 45% confidence
0

Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a multi-year ramp.

Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida)
2027 · 50% confidence
5

New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, factory flow, and cust...

Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California)
2027 · 45% confidence
0

Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a multi-year ramp.

Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida)
2028 · 50% confidence
8
New Glenn 7x2
TLI
7,000 kg
Unknown
Unknown
Wikipedia New Glenn (citing Blue Origin official specs)
Announced

No forecasted missions

No upcoming announced mission rows are linked to this vehicle family.

Track

New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, factory flow, and cust...

Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California)
2028 · 45% confidence
0

Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a multi-year ramp.

Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida)
2029 · 50% confidence
10

New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, factory flow, and cust...

Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California)
2029 · 45% confidence
1

Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a multi-year ramp.

Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida)
2030 · 50% confidence
12

New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, factory flow, and cust...

Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California)
2030 · 45% confidence
2

Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a multi-year ramp.

Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida)
2031 · 50% confidence
14

New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, factory flow, and cust...

Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California)
2031 · 45% confidence
4

Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a multi-year ramp.

Mentions
883
All verified mentions of this launch vehicle family in source documents.
0.0-5.0
Actions

Blue Origin’s New Glenn rocket exploded during a static-fire test on the launch pad in May.

PlanCapabilityValue 4.0Jul 22, 2026Jared Isaacman (NASA) actualiza el plan de Artemis III: "Seguimos comprometidos con la fecha de 2027"
Page1of45

NASA’s Artemis III team plans a launch with Blue Origin’s New Glenn as the primary option for the lunar lander program.

PlanRelationshipsValue 4.0Jul 22, 2026Jared Isaacman (NASA) actualiza el plan de Artemis III: "Seguimos comprometidos con la fecha de 2027"

A late-June 2026 ground test anomaly that caused an upper-stage explosion sidelined Blue Origin’s New Glenn rocket and reduced near-term launch availability.

PlanGeneralValue 4.0Jul 16, 2026AST SpaceMobile Defers Commercial Direct-to-Device Timeline to Early 2027

AST SpaceMobile originally partnered with Blue Origin to launch 45 BlueBird satellites on the New Glenn rocket.

RelationshipsPlanValue 4.0Jul 16, 2026AST SpaceMobile Defers Commercial Direct-to-Device Timeline to Early 2027

Blue Origin’s New Glenn has followed Falcon 9 in booster recovery and reuse.

CapabilityGeneralValue 2.2Jul 13, 2026Review: HOTOL and Skylon

Blue Origin plans to return its New Glenn heavy-lift rocket to flight by the end of this year after a pad-side anomaly during a hotfire test in late May at Launch Complex 36 in Florida.

PlanCapabilityValue 4.0Jul 12, 2026NASA’s IG Audits the Commercial Crew Program, and the SpaceX Lockup Deadline

Blue Origin has completed the first two phases of a five-phase New Glenn recovery plan and is working on design and repair work tied to a new operations concept.

PlanCapabilityValue 4.0Jul 12, 2026NASA’s IG Audits the Commercial Crew Program, and the SpaceX Lockup Deadline

United Launch Alliance’s Vulcan Centaur and Blue Origin’s New Glenn are among the programs affected by the Inconel 718 shortage.

GeneralCapabilityValue 2.3Jul 12, 2026NASA’s IG Audits the Commercial Crew Program, and the SpaceX Lockup Deadline

Amazon has secured up to 27 launches on Blue Origin’s New Glenn for its internet constellation.

PlanRelationshipsGeneralValue 4.2Jul 10, 2026The high financial stakes behind the modern super heavy lift launch vehicles

Blue Origin is testing New Glenn as a super heavy lift launch vehicle.

CapabilityPlanValue 4.0Jul 10, 2026The high financial stakes behind the modern super heavy lift launch vehicles

Blue Origin is targeting a return to flight of New Glenn before the end of the year.

PlanValue 4.0Jul 9, 2026Blue Origin Seeks $10B at $130B Valuation, Reporting Shows

Blue Origin reengineered launch infrastructure in Cape Canaveral after New Glenn exploded on the launch pad this spring.

CapabilityGeneralValue 3.5Jul 9, 2026Blue Origin Seeks $10B at $130B Valuation, Reporting Shows

In May 2026, a New Glenn heavy-lift rocket anomaly during an integrated static-fire hot-fire test at Cape Canaveral damaged the pad’s primary transporter-erector gantry.

CapabilityValue 4.6Jul 9, 2026Blue Origin Moves to Raise $10 Billion in First-Ever Outside Funding Round

A pad-side anomaly during a hotfire test in late May occurred at Launch Complex 36 in Florida and delayed New Glenn’s return to flight.

PlanValue 4.0Jul 8, 2026New Glenn Pad Rebuild Paves Way for Launch Resumption in 2026

Blue Origin continues to build New Glenn vehicles at its manufacturing facilities while pad reconstruction continues.

PlanCapabilityGrowthValue 3.0Jul 8, 2026New Glenn Pad Rebuild Paves Way for Launch Resumption in 2026

Under Blue Origin’s revised launch operations concept, a crane raises New Glenn into vertical position, places it on a refurbished launch table, and connects umbilicals from the main tower.

PlanCapabilityValue 4.2Jul 8, 2026New Glenn Pad Rebuild Paves Way for Launch Resumption in 2026

Blue Origin plans to return its New Glenn heavy-lift rocket to flight by the end of 2026.

PlanGrowthValue 3.8Jul 8, 2026New Glenn Pad Rebuild Paves Way for Launch Resumption in 2026

Blue Origin’s revised launch operations concept uses existing facilities to mate New Glenn horizontally before rolling the vehicle to the pad on a transporter.

CapabilityPlanValue 4.0Jul 8, 2026New Glenn Pad Rebuild Paves Way for Launch Resumption in 2026

Early analysis of the anomaly points to the aft section of New Glenn’s first stage.

CapabilityGeneralValue 2.2Jul 8, 2026New Glenn Pad Rebuild Paves Way for Launch Resumption in 2026

Blue Origin’s new launch operations concept is intended to be a common approach for multiple pads supporting New Glenn’s nine-engine first stage and four-engine upper stage.

PlanCapabilityValue 4.0Jul 8, 2026New Glenn Pad Rebuild Paves Way for Launch Resumption in 2026