Family-level launch record combining canonical variants, historical missions, public cadence forecasts, and available payload performance specs.
Historical missions are grouped by actual launch year. Forecast cadence uses family-level launch-rate rows.
| Year | Historical missions | Forecast launches |
|---|---|---|
| 2026 | 0 | 1 |
| 2027 | 0 | 3 |
| 2028 | 0 | 5 |
| 2029 | 0 | 6 |
| 2030 | 0 | 8 |
| 2031 | 0 | 8 |
| 2032 | 0 | 10 |
| 2033 | 0 | 10 |
| 2034 | 0 | 10 |
| 2035 | 0 | 12 |
| 2036 | 0 | 12 |
| 2037 | 0 | 12 |
| 2038 | 0 | 12 |
| 2039 | 0 | 12 |
| 2040 | 0 | 12 |
| 2041 | 0 | 12 |
Payload capacity by variant and target orbit when structured capacity rows are available.
| Variant | Orbit | Capacity | Altitude | Inclination | Source |
|---|---|---|---|---|---|
Neutron | LEO | 15,000 kg | Unknown | Unknown | Rocket Lab Reusable Rockets |
Neutron | LEO | 13,000 kg | Unknown | Unknown | Rocket Lab Neutron |
Latest launched missions using variants in this family.
| Mission | Variant | Launch |
|---|---|---|
No recent missionsNo launched missions are linked to variants in this family. | ||
Upcoming mission rows with announced launch timing.
| Mission | Variant | Announced |
|---|---|---|
No forecasted missionsNo upcoming announced mission rows are linked to this vehicle family. | ||
Canonical variants rolled up into this launch vehicle family.
| Variant | Stages | Missions | Status |
|---|---|---|---|
Neutron | Not stated | 0 | Development |
1 launch location represented.
| Year | Location | Launches | Confidence | Basis |
|---|---|---|---|---|
| 2026 | Wallops Flight Facility / MARS | Launch Complex 3 | 1 | 35% | Conservative startup-ramp annual family throughput default: Neutron is targeted for debut in late 2026; use early operational ramp, not mature medium-lift cade... |
| 2027 | Wallops Flight Facility / MARS | Launch Complex 3 | 3 | 35% | Conservative startup-ramp annual family throughput default: Neutron cadence below previous 16/year upper curve until regular operations are demonstrated. |
| 2028 | Wallops Flight Facility / MARS | Launch Complex 3 | 5 | 35% | Conservative startup-ramp annual family throughput default: Neutron cadence below previous 16/year upper curve until regular operations are demonstrated. |
| 2029 | Wallops Flight Facility / MARS | Launch Complex 3 | 6 | 30% | Conservative startup-ramp annual family throughput default: Neutron cadence below previous 16/year upper curve until regular operations are demonstrated. |
| 2030 | Wallops Flight Facility / MARS | Launch Complex 3 | 8 | 30% | Conservative startup-ramp annual family throughput default: Neutron cadence below previous 16/year upper curve until regular operations are demonstrated. |
| 2031 | Wallops Flight Facility / MARS | Launch Complex 3 | 8 | 30% | Conservative startup-ramp annual family throughput default: Neutron cadence below previous 16/year upper curve until regular operations are demonstrated. |
| 2032 | Wallops Flight Facility / MARS | Launch Complex 3 | 10 | 25% | Conservative startup-ramp annual family throughput default: Neutron cadence below previous 16/year upper curve until regular operations are demonstrated. |
| 2033 | Wallops Flight Facility / MARS | Launch Complex 3 | 10 | 25% | Conservative startup-ramp annual family throughput default: Neutron cadence below previous 16/year upper curve until regular operations are demonstrated. |
| 2034 | Wallops Flight Facility / MARS | Launch Complex 3 | 10 | 25% | Conservative startup-ramp annual family throughput default: Neutron cadence below previous 16/year upper curve until regular operations are demonstrated. |
| 2035 | Wallops Flight Facility / MARS | Launch Complex 3 | 12 | 25% | Conservative startup-ramp annual family throughput default: Neutron cadence below previous 16/year upper curve until regular operations are demonstrated. |
| 2036 | Wallops Flight Facility / MARS | Launch Complex 3 | 12 | 25% | Conservative startup-ramp annual family throughput default: Neutron cadence below previous 16/year upper curve until regular operations are demonstrated. |
| 2037 | Wallops Flight Facility / MARS | Launch Complex 3 | 12 | 25% | Conservative startup-ramp annual family throughput default: Neutron cadence below previous 16/year upper curve until regular operations are demonstrated. |
| 2038 | Wallops Flight Facility / MARS | Launch Complex 3 | 12 | 25% | Conservative startup-ramp annual family throughput default: Neutron cadence below previous 16/year upper curve until regular operations are demonstrated. |
| 2039 | Wallops Flight Facility / MARS | Launch Complex 3 | 12 | 25% | Conservative startup-ramp annual family throughput default: Neutron cadence below previous 16/year upper curve until regular operations are demonstrated. |
| 2040 | Wallops Flight Facility / MARS | Launch Complex 3 | 12 | 25% | Conservative startup-ramp annual family throughput default: Neutron cadence below previous 16/year upper curve until regular operations are demonstrated. |
| 2041 | Wallops Flight Facility / MARS | Launch Complex 3 | 12 | 25% | Conservative startup-ramp annual family throughput default: Neutron cadence below previous 16/year upper curve until regular operations are demonstrated. Site-... |
Conservative startup-ramp annual family throughput default: Neutron is targeted for debut in late 2026; use early operational ramp, not mature medium-lift cadence.
Conservative startup-ramp annual family throughput default: Neutron cadence below previous 16/year upper curve until regular operations are demonstrated.
Conservative startup-ramp annual family throughput default: Neutron cadence below previous 16/year upper curve until regular operations are demonstrated.
Conservative startup-ramp annual family throughput default: Neutron cadence below previous 16/year upper curve until regular operations are demonstrated.
Conservative startup-ramp annual family throughput default: Neutron cadence below previous 16/year upper curve until regular operations are demonstrated.
Conservative startup-ramp annual family throughput default: Neutron cadence below previous 16/year upper curve until regular operations are demonstrated.
Conservative startup-ramp annual family throughput default: Neutron cadence below previous 16/year upper curve until regular operations are demonstrated.
Conservative startup-ramp annual family throughput default: Neutron cadence below previous 16/year upper curve until regular operations are demonstrated.
Conservative startup-ramp annual family throughput default: Neutron cadence below previous 16/year upper curve until regular operations are demonstrated.
Conservative startup-ramp annual family throughput default: Neutron cadence below previous 16/year upper curve until regular operations are demonstrated.
Conservative startup-ramp annual family throughput default: Neutron cadence below previous 16/year upper curve until regular operations are demonstrated.
Conservative startup-ramp annual family throughput default: Neutron cadence below previous 16/year upper curve until regular operations are demonstrated.
Neutron |
| LEO |
| 8,000 kg |
| Unknown |
| Unknown |
| Rocket Lab Reusable Rockets |
Neutron | escape | 1,500 kg | Unknown | Unknown | Rocket Lab Neutron Payload User Guide |
Swift’s Ultraviolet/Optical Telescope imaged the kilonova produced by the merging neutron stars in galaxy NGC 4993 on 2017-08-18, about 15 hours after the gravitational waves and gamma-ray burst were detected.
Rocket Lab is working to have the first Neutron ready for launch from Launch Complex 3 as soon as the end of 2024.
Rocket Lab is building Launch Complex 3 adjacent to LC-2 to support its Neutron rocket.
Rocket Lab operates the Electron small launch vehicle and projects its larger Neutron rocket could be ready as soon as the end of 2024.
Rocket Lab estimated in 2021 that it would spend $250,000,000 to $300,000,000 on Neutron and have the vehicle ready in 2024.
Rocket Lab designs and manufactures the Electron small orbital launch vehicle and the Photon satellite platform and is developing the Neutron large launch vehicle for constellation deployment.
Rocket Lab is developing a larger rocket called Neutron that is projected to debut in 2025.
Rocket Lab is developing a larger rocket called Neutron that is expected to debut in 2025.
Rocket Lab is developing a larger Neutron rocket and targeted a first Neutron launch in late 2024.
Rocket Lab raised $777,000,000 in capital from its SPAC deal to help fund its Neutron medium-class rocket.
On 2023-08-07, NanoAvionics was preparing to ship a nanosatellite slated to launch that fall to study black holes and neutron stars from low Earth orbit.
Rocket Lab will use the leased Long Beach facility to support development of its Neutron rocket.
Neutron development is continuing with expanded launch and testing facilities, engine hardware being printed at Rocket Lab’s Long Beach headquarters, and vehicle hardware in production for upcoming structural tests during 2023.
The OLC049, OLC249, and OLC449 optocouplers are designed for large satellite constellation applications that require optical isolation in radiation environments such as gamma, neutron, and proton radiation and provide a high current transfer ratio (CTR) and low saturation VCE.
LunaH-Map tested its neutron spectrometer during the November 2022 lunar flyby at higher altitudes.
Rocket Lab is developing a reusable medium rocket named Neutron designed to carry up to 13,000 kg to low Earth orbit.
Rocket Lab is expanding operations at Virginia’s Wallops Island and will host launches of the company’s larger Neutron rocket in addition to Electron launches.
Rocket Lab is developing the larger Neutron rocket, which is slated to debut as soon as 2024.
Rocket Lab is investing approximately $250,000,000 in the development of the Neutron launch vehicle.
Rocket Lab plans to start flying Neutron in late 2024.