Polaris Intelligence
Polaris
Intelligence
About
Ctrl K
Sign in
© Polaris Intelligence 2026
PrivacyTermsAdmin
Launch Vehicles
Vehicle family profile

Neutron

Family-level launch record combining canonical variants, historical missions, public cadence forecasts, and available payload performance specs.

Rocket LabDevelopment
Admin
Variants
1
Canonical variants linked to this family.
Historical missions
0
Missions in the public mission table with actual launch dates.
Peak listed capacity
15,000 kg
Maximum payload capacity across listed variants and orbits.

Launch Cadence

Historical missions are grouped by actual launch year. Forecast cadence uses family-level launch-rate rows.

YearHistorical missionsForecast launches
202601
202703
202805
202906
203008
203108
2032010
2033010
2034010
2035012
2036012
2037012
2038012
2039012
2040012
2041012

Forecast Location Split

Performance Specs

Payload capacity by variant and target orbit when structured capacity rows are available.

VariantOrbitCapacityAltitudeInclinationSource
Neutron
LEO15,000 kgUnknownUnknownRocket Lab Reusable Rockets
Neutron
LEO13,000 kgUnknownUnknownRocket Lab Neutron

Recent Missions

Latest launched missions using variants in this family.

MissionVariantLaunch

No recent missions

No launched missions are linked to variants in this family.

Forecasted Missions

Upcoming mission rows with announced launch timing.

MissionVariantAnnounced

No forecasted missions

No upcoming announced mission rows are linked to this vehicle family.

Variants

Canonical variants rolled up into this launch vehicle family.

VariantStagesMissionsStatus
Neutron
Not stated0Development

1 launch location represented.

YearLocationLaunchesConfidenceBasis
2026Wallops Flight Facility / MARS | Launch Complex 3135%Conservative startup-ramp annual family throughput default: Neutron is targeted for debut in late 2026; use early operational ramp, not mature medium-lift cade...
2027Wallops Flight Facility / MARS | Launch Complex 3335%Conservative startup-ramp annual family throughput default: Neutron cadence below previous 16/year upper curve until regular operations are demonstrated.
2028Wallops Flight Facility / MARS | Launch Complex 3535%Conservative startup-ramp annual family throughput default: Neutron cadence below previous 16/year upper curve until regular operations are demonstrated.
2029Wallops Flight Facility / MARS | Launch Complex 3630%Conservative startup-ramp annual family throughput default: Neutron cadence below previous 16/year upper curve until regular operations are demonstrated.
2030Wallops Flight Facility / MARS | Launch Complex 3830%Conservative startup-ramp annual family throughput default: Neutron cadence below previous 16/year upper curve until regular operations are demonstrated.
2031Wallops Flight Facility / MARS | Launch Complex 3830%Conservative startup-ramp annual family throughput default: Neutron cadence below previous 16/year upper curve until regular operations are demonstrated.
2032Wallops Flight Facility / MARS | Launch Complex 31025%Conservative startup-ramp annual family throughput default: Neutron cadence below previous 16/year upper curve until regular operations are demonstrated.
2033Wallops Flight Facility / MARS | Launch Complex 31025%Conservative startup-ramp annual family throughput default: Neutron cadence below previous 16/year upper curve until regular operations are demonstrated.
2034Wallops Flight Facility / MARS | Launch Complex 31025%Conservative startup-ramp annual family throughput default: Neutron cadence below previous 16/year upper curve until regular operations are demonstrated.
2035Wallops Flight Facility / MARS | Launch Complex 31225%Conservative startup-ramp annual family throughput default: Neutron cadence below previous 16/year upper curve until regular operations are demonstrated.
2036Wallops Flight Facility / MARS | Launch Complex 31225%Conservative startup-ramp annual family throughput default: Neutron cadence below previous 16/year upper curve until regular operations are demonstrated.
2037Wallops Flight Facility / MARS | Launch Complex 31225%Conservative startup-ramp annual family throughput default: Neutron cadence below previous 16/year upper curve until regular operations are demonstrated.
2038Wallops Flight Facility / MARS | Launch Complex 31225%Conservative startup-ramp annual family throughput default: Neutron cadence below previous 16/year upper curve until regular operations are demonstrated.
2039Wallops Flight Facility / MARS | Launch Complex 31225%Conservative startup-ramp annual family throughput default: Neutron cadence below previous 16/year upper curve until regular operations are demonstrated.
2040Wallops Flight Facility / MARS | Launch Complex 31225%Conservative startup-ramp annual family throughput default: Neutron cadence below previous 16/year upper curve until regular operations are demonstrated.
2041Wallops Flight Facility / MARS | Launch Complex 31225%Conservative startup-ramp annual family throughput default: Neutron cadence below previous 16/year upper curve until regular operations are demonstrated. Site-...
Wallops Flight Facility / MARS | Launch Complex 3
2026 · 35% confidence
1

Conservative startup-ramp annual family throughput default: Neutron is targeted for debut in late 2026; use early operational ramp, not mature medium-lift cadence.

Wallops Flight Facility / MARS | Launch Complex 3
2027 · 35% confidence
3

Conservative startup-ramp annual family throughput default: Neutron cadence below previous 16/year upper curve until regular operations are demonstrated.

Wallops Flight Facility / MARS | Launch Complex 3
2028 · 35% confidence
5

Conservative startup-ramp annual family throughput default: Neutron cadence below previous 16/year upper curve until regular operations are demonstrated.

Wallops Flight Facility / MARS | Launch Complex 3
2029 · 30% confidence
6

Conservative startup-ramp annual family throughput default: Neutron cadence below previous 16/year upper curve until regular operations are demonstrated.

Wallops Flight Facility / MARS | Launch Complex 3
2030 · 30% confidence
8

Conservative startup-ramp annual family throughput default: Neutron cadence below previous 16/year upper curve until regular operations are demonstrated.

Wallops Flight Facility / MARS | Launch Complex 3
2031 · 30% confidence
8

Conservative startup-ramp annual family throughput default: Neutron cadence below previous 16/year upper curve until regular operations are demonstrated.

Wallops Flight Facility / MARS | Launch Complex 3
2032 · 25% confidence
10

Conservative startup-ramp annual family throughput default: Neutron cadence below previous 16/year upper curve until regular operations are demonstrated.

Wallops Flight Facility / MARS | Launch Complex 3
2033 · 25% confidence
10

Conservative startup-ramp annual family throughput default: Neutron cadence below previous 16/year upper curve until regular operations are demonstrated.

Wallops Flight Facility / MARS | Launch Complex 3
2034 · 25% confidence
10

Conservative startup-ramp annual family throughput default: Neutron cadence below previous 16/year upper curve until regular operations are demonstrated.

Wallops Flight Facility / MARS | Launch Complex 3
2035 · 25% confidence
12

Conservative startup-ramp annual family throughput default: Neutron cadence below previous 16/year upper curve until regular operations are demonstrated.

Wallops Flight Facility / MARS | Launch Complex 3
2036 · 25% confidence
12

Conservative startup-ramp annual family throughput default: Neutron cadence below previous 16/year upper curve until regular operations are demonstrated.

Wallops Flight Facility / MARS | Launch Complex 3
2037 · 25% confidence
12

Conservative startup-ramp annual family throughput default: Neutron cadence below previous 16/year upper curve until regular operations are demonstrated.

Neutron
LEO
8,000 kg
Unknown
Unknown
Rocket Lab Reusable Rockets
Neutron
escape1,500 kgUnknownUnknownRocket Lab Neutron Payload User Guide
Track
Mentions
285
All verified mentions of this launch vehicle family in source documents.
0.0-5.0
Actions

Neutron is the world’s first medium-lift carbon composite rocket and builds on Rocket Lab’s carbon composite techniques used across more than 50 Electron launches.

CapabilityGeneralValue 4.0Aug 9, 2024Rocket Lab Begins Installation of Large Carbon Composite Rocket-Building Machine
Page10of15

The combined thrust of nine Archimedes engines for Neutron’s first stage is designed to reach 657,708 kg-force total.

CapabilityValue 5.0Aug 8, 2024Rocket Lab Completes Successful First Hot Fire of Archimedes Engine for Neutron Rocket

Rocket Lab is developing the medium-lift reusable Neutron rocket to launch constellations of satellites, national security and defense missions, and interplanetary missions from mid-2025.

PlanCapabilityValue 4.2Aug 6, 2024Rocket Lab Partners With KSAT To Streamline Satellite Communications for Customers with Upgraded Ground Station Service

Rocket Lab is developing the Neutron medium-lift reusable rocket to launch constellations of satellites, national security and defense missions, and interplanetary missions from mid-2025.

PlanGeneralCapabilityValue 4.0Aug 6, 2024KSAT Introduces Fully Automated KSATlite Launch and Deorbit Service on KSATlite Network after strong collaboration with Rocket Lab

Rocket Lab is developing a larger reusable launch vehicle called Neutron with plans to bring it to market by mid-2025.

PlanGeneralValue 4.0Jun 20, 2024Rocket Lab launches France’s Kinéis’ ‘No Time Toulouse’ and milestone of 50 launches in 7 years

Rocket Lab completed carbon composite flight structures for Neutron’s fairing panels, Stage 1 and Stage 2 tanks, and the reusable Stage 1 structure.

CapabilityPlanValue 4.2May 7, 2024Rocket Lab completes Archimedes engine build + initiates engine test campaign

Neutron’s dedicated launch site infrastructure at Wallops Island, Virginia includes completed foundation concrete works for Neutron’s launch mount and propellant and gas storage facilities and installation of a 84.7 m water tower.

CapabilityPlanValue 4.0May 7, 2024Rocket Lab completes Archimedes engine build + initiates engine test campaign

Rocket Lab previously planned a Neutron first launch around the end of 2024, a timeline affirmed during a February 2024 earnings call.

PlanFinancialValue 3.8May 7, 2024Rocket Lab pushes back Neutron debut to 2025

Rocket Lab anticipates spending $250,000,000 to $300,000,000 on development of the Neutron launch vehicle.

FinancialPlanValue 4.5May 7, 2024Rocket Lab pushes back Neutron debut to 2025

Rocket Lab designs and manufactures the Electron small orbital launch vehicle and the Photon satellite platform and is developing the large Neutron launch vehicle for constellation deployment.

CapabilityPlanGrowthValue 4.6May 7, 2024CesiumAstro Selected by Rocket Lab to Provide Multi-Beam Ka-Band Communications Payloads for its Space Development Agency Tranche 2 Transport Layer Constellation

Neutron’s first stage will use nine Archimedes engines for a combined total thrust of 1,450,000 lbf.

CapabilityValue 5.0May 7, 2024Rocket Lab completes Archimedes engine build + initiates engine test campaign

Rocket Lab expects Neutron’s first launch to take place no earlier than mid-2025.

PlanValue 4.0May 7, 2024Rocket Lab completes Archimedes engine build + initiates engine test campaign

Rocket Lab is constructing Launch Complex 3 at Wallops Island, Virginia for Neutron operations.

GrowthPlanGeneralValue 4.0May 7, 2024Rocket Lab pushes back Neutron debut to 2025

Rocket Lab designs and manufactures the Electron small orbital launch vehicle and the Photon satellite platform and is developing the Neutron launch vehicle for constellation deployment.

CapabilityPlanValue 4.6Apr 29, 2024Rocket Lab readies back-to-back launches for NASA’s climate change research mission

Rocket Lab designs and manufactures the Electron small orbital launch vehicle and the Photon satellite platform and is developing the Neutron launch vehicle for constellation deployment.

CapabilityPlanGrowthValue 4.5Apr 11, 2024Rocket Lab Returns Previously Flown Electron to Production Line in Preparation for First Reflight

Rocket Lab designs and manufactures the Electron small orbital launch vehicle and the Photon satellite platform and is developing the Neutron launch vehicle.

CapabilityPlanValue 4.2Apr 11, 2024Rocket Lab Selected by Space Systems Command to Build and Launch Spacecraft for Tactically Responsive Space (TacRS) Mission

Rocket Lab has a $24,350,000 contract with Space Systems Command to support development of Neutron's upper stage.

RelationshipsFinancialCapabilityPlanValue 5.0Apr 9, 2024Rocket Lab Awarded U.S. Space Force Launch Contract for Space Test Program (STP)-S30

Rocket Lab is working with Space Systems Command under a $24,350,000 contract to support development of Neutron’s upper stage.

RelationshipsFinancialPlanCapabilityValue 4.8Apr 8, 2024U.S. Space Force Awards Rocket Lab Launch Contract for Space Test Program (STP)-S30

Rocket Lab designs and manufactures the Electron small orbital launch vehicle and the Photon satellite platform and is developing the Neutron large launch vehicle for constellation deployment.

CapabilityPlanGeneralGrowthValue 4.0Apr 8, 2024U.S. Space Force awards $14.49 million contract to Rocket Lab for Space Test Program-30

Rocket Lab has a $24,350,000 contract with Space Systems Command to support development of Neutron’s upper stage.

RelationshipsFinancialPlanValue 5.0Apr 8, 2024U.S. Space Force awards $14.49 million contract to Rocket Lab for Space Test Program-30