Polaris Intelligence
Polaris
Intelligence
About
Ctrl K
Sign in
© Polaris Intelligence 2026
PrivacyTermsAdmin
Launch Vehicles
Vehicle family profile

Starship

Family-level launch record combining canonical variants, historical missions, public cadence forecasts, and available payload performance specs.

SpaceXActive
Admin
Variants
3
Canonical variants linked to this family.
Historical missions
12
Missions in the public mission table with actual launch dates.
Peak listed capacity
150,000 kg
Maximum payload capacity across listed variants and orbits.

Launch Cadence

Historical missions are grouped by actual launch year. Forecast cadence uses family-level launch-rate rows.

YearHistorical missionsForecast launches
202320
202440
202550
202613
202707
2028015
2029031
2030050
2031071
2032087
20330103
20340117
20350129
20360133
20370137
20380137
20390137

Performance Specs

Payload capacity by variant and target orbit when structured capacity rows are available.

VariantOrbitCapacityAltitudeInclinationSource
Starship V3
LEO150,000 kgUnknownUnknownStarlink V3 batch-calibrated Starship capacity assumption
Starship V2
LEO35,000 kgUnknownUnknownSpaceX Starship - Wikipedia

Recent Missions

Latest launched missions using variants in this family.

MissionVariantLaunch
Launch 2026-U02
Starship V3
May 22, 2026
Launch 2025-U04
Starship V2
Oct 13, 2025
Launch 2025-U03
Starship V2
Aug 26, 2025
Launch 2025-U02

Variants

Canonical variants rolled up into this launch vehicle family.

VariantStagesMissionsStatus
Starship V1.0
Not stated6Active
Starship V2
Not stated5Retired
Starship V3
Not stated1Active
20400137
20410137

Forecast Location Split

5 launch locations represented.

YearLocationLaunchesConfidenceBasis
2026Space Launch Complex 37B, Cape Canaveral (Cape Canaveral Air Station, Florida)050%SLC-37B is modeled as the first high-throughput CCSFS Starship pad. Base reaches half of the SLC-37 complex cap by 2035, not immediately after redevelopment.
2026Cape Canaveral Space Force Station | SLC-37A045%Modeled as second SLC-37 Starship pad, lagging SLC-37B by one to two years. Mature split reaches 38/year by 2037, keeping complex total at 76/year.
2026Launch Complex 39A, NASA Kennedy Space Center, Florida (NASA John F. Kennedy Space Center, Florida)065%LC-39A Starship is expected to ramp after initial Florida infrastructure/testing. Base remains below the 44/year EIS cap even after maturity to reflect range c...
2026Starship Orbital Pad 1, Boca Chica (Starbase, Boca Chica Beach, Texas)365%Starbase remains the development and early operational hub. Base ramps slowly from test cadence to routine operations; by 2031 it is one of two pads sharing th...
2026Starship Orbital Pad 2, Boca Chica (Starbase, Boca Chica Beach, Texas)050%Second Starbase pad provides incremental operations after pad commissioning. Mature OLP-A + OLP-B total is capped at 25/year in the base/high range.
2027Space Launch Complex 37B, Cape Canaveral (Cape Canaveral Air Station, Florida)050%SLC-37B is modeled as the first high-throughput CCSFS Starship pad. Base reaches half of the SLC-37 complex cap by 2035, not immediately after redevelopment.
2027Launch Complex 39A, NASA Kennedy Space Center, Florida (NASA John F. Kennedy Space Center, Florida)165%LC-39A Starship is expected to ramp after initial Florida infrastructure/testing. Base remains below the 44/year EIS cap even after maturity to reflect range c...
2027Starship Orbital Pad 1, Boca Chica (Starbase, Boca Chica Beach, Texas)565%Starbase remains the development and early operational hub. Base ramps slowly from test cadence to routine operations; by 2031 it is one of two pads sharing th...
2027Starship Orbital Pad 2, Boca Chica (Starbase, Boca Chica Beach, Texas)150%Second Starbase pad provides incremental operations after pad commissioning. Mature OLP-A + OLP-B total is capped at 25/year in the base/high range.
2027Cape Canaveral Space Force Station | SLC-37A045%Modeled as second SLC-37 Starship pad, lagging SLC-37B by one to two years. Mature split reaches 38/year by 2037, keeping complex total at 76/year.
2028Space Launch Complex 37B, Cape Canaveral (Cape Canaveral Air Station, Florida)250%SLC-37B is modeled as the first high-throughput CCSFS Starship pad. Base reaches half of the SLC-37 complex cap by 2035, not immediately after redevelopment.
2028Launch Complex 39A, NASA Kennedy Space Center, Florida (NASA John F. Kennedy Space Center, Florida)365%LC-39A Starship is expected to ramp after initial Florida infrastructure/testing. Base remains below the 44/year EIS cap even after maturity to reflect range c...
2028Starship Orbital Pad 1, Boca Chica (Starbase, Boca Chica Beach, Texas)765%Starbase remains the development and early operational hub. Base ramps slowly from test cadence to routine operations; by 2031 it is one of two pads sharing th...
2028Starship Orbital Pad 2, Boca Chica (Starbase, Boca Chica Beach, Texas)350%Second Starbase pad provides incremental operations after pad commissioning. Mature OLP-A + OLP-B total is capped at 25/year in the base/high range.
2028Cape Canaveral Space Force Station | SLC-37A045%Modeled as second SLC-37 Starship pad, lagging SLC-37B by one to two years. Mature split reaches 38/year by 2037, keeping complex total at 76/year.
2029Space Launch Complex 37B, Cape Canaveral (Cape Canaveral Air Station, Florida)650%SLC-37B is modeled as the first high-throughput CCSFS Starship pad. Base reaches half of the SLC-37 complex cap by 2035, not immediately after redevelopment.
2029Launch Complex 39A, NASA Kennedy Space Center, Florida (NASA John F. Kennedy Space Center, Florida)865%LC-39A Starship is expected to ramp after initial Florida infrastructure/testing. Base remains below the 44/year EIS cap even after maturity to reflect range c...
2029Starship Orbital Pad 1, Boca Chica (Starbase, Boca Chica Beach, Texas)865%Starbase remains the development and early operational hub. Base ramps slowly from test cadence to routine operations; by 2031 it is one of two pads sharing th...
2029Starship Orbital Pad 2, Boca Chica (Starbase, Boca Chica Beach, Texas)750%Second Starbase pad provides incremental operations after pad commissioning. Mature OLP-A + OLP-B total is capped at 25/year in the base/high range.
2029Cape Canaveral Space Force Station | SLC-37A245%Modeled as second SLC-37 Starship pad, lagging SLC-37B by one to two years. Mature split reaches 38/year by 2037, keeping complex total at 76/year.
2030Space Launch Complex 37B, Cape Canaveral (Cape Canaveral Air Station, Florida)1250%SLC-37B is modeled as the first high-throughput CCSFS Starship pad. Base reaches half of the SLC-37 complex cap by 2035, not immediately after redevelopment.
2030Launch Complex 39A, NASA Kennedy Space Center, Florida (NASA John F. Kennedy Space Center, Florida)1265%LC-39A Starship is expected to ramp after initial Florida infrastructure/testing. Base remains below the 44/year EIS cap even after maturity to reflect range c...
2030Starship Orbital Pad 1, Boca Chica (Starbase, Boca Chica Beach, Texas)965%Starbase remains the development and early operational hub. Base ramps slowly from test cadence to routine operations; by 2031 it is one of two pads sharing th...
2030Starship Orbital Pad 2, Boca Chica (Starbase, Boca Chica Beach, Texas)1150%Second Starbase pad provides incremental operations after pad commissioning. Mature OLP-A + OLP-B total is capped at 25/year in the base/high range.
Space Launch Complex 37B, Cape Canaveral (Cape Canaveral Air Station, Florida)
2026 · 50% confidence
0

SLC-37B is modeled as the first high-throughput CCSFS Starship pad. Base reaches half of the SLC-37 complex cap by 2035, not immediately after redevelopment.

Cape Canaveral Space Force Station | SLC-37A
2026 · 45% confidence
0

Modeled as second SLC-37 Starship pad, lagging SLC-37B by one to two years. Mature split reaches 38/year by 2037, keeping complex total at 76/year.

Launch Complex 39A, NASA Kennedy Space Center, Florida (NASA John F. Kennedy Space Center, Florida)
2026 · 65% confidence
0

LC-39A Starship is expected to ramp after initial Florida infrastructure/testing. Base remains below the 44/year EIS cap even after maturity to reflect range conflicts, tanker ope...

Starship Orbital Pad 1, Boca Chica (Starbase, Boca Chica Beach, Texas)
2026 · 65% confidence
3

Starbase remains the development and early operational hub. Base ramps slowly from test cadence to routine operations; by 2031 it is one of two pads sharing the 25/year site cap.

Starship Orbital Pad 2, Boca Chica (Starbase, Boca Chica Beach, Texas)
2026 · 50% confidence
0

Second Starbase pad provides incremental operations after pad commissioning. Mature OLP-A + OLP-B total is capped at 25/year in the base/high range.

Starship V3
TLI21,000 kgUnknownUnknownSpaceX Starship public vehicle page
Starship V1.0
LEO15,000 kgUnknownUnknownSpaceX Starship public/current block summary
Starship V2
May 27, 2025
Launch 2025-F03
Starship V2
Mar 6, 2025
Launch 2025-F01
Starship V2
Jan 16, 2025
Launch 2024-U06
Starship V1.0
Nov 19, 2024
Launch 2024-U04
Starship V1.0
Oct 13, 2024

Forecasted Missions

Upcoming mission rows with announced launch timing.

MissionVariantAnnounced

No forecasted missions

No upcoming announced mission rows are linked to this vehicle family.

Track
Space Launch Complex 37B, Cape Canaveral (Cape Canaveral Air Station, Florida)
2027 · 50% confidence
0

SLC-37B is modeled as the first high-throughput CCSFS Starship pad. Base reaches half of the SLC-37 complex cap by 2035, not immediately after redevelopment.

Launch Complex 39A, NASA Kennedy Space Center, Florida (NASA John F. Kennedy Space Center, Florida)
2027 · 65% confidence
1

LC-39A Starship is expected to ramp after initial Florida infrastructure/testing. Base remains below the 44/year EIS cap even after maturity to reflect range conflicts, tanker ope...

Starship Orbital Pad 1, Boca Chica (Starbase, Boca Chica Beach, Texas)
2027 · 65% confidence
5

Starbase remains the development and early operational hub. Base ramps slowly from test cadence to routine operations; by 2031 it is one of two pads sharing the 25/year site cap.

Starship Orbital Pad 2, Boca Chica (Starbase, Boca Chica Beach, Texas)
2027 · 50% confidence
1

Second Starbase pad provides incremental operations after pad commissioning. Mature OLP-A + OLP-B total is capped at 25/year in the base/high range.

Cape Canaveral Space Force Station | SLC-37A
2027 · 45% confidence
0

Modeled as second SLC-37 Starship pad, lagging SLC-37B by one to two years. Mature split reaches 38/year by 2037, keeping complex total at 76/year.

Space Launch Complex 37B, Cape Canaveral (Cape Canaveral Air Station, Florida)
2028 · 50% confidence
2

SLC-37B is modeled as the first high-throughput CCSFS Starship pad. Base reaches half of the SLC-37 complex cap by 2035, not immediately after redevelopment.

Launch Complex 39A, NASA Kennedy Space Center, Florida (NASA John F. Kennedy Space Center, Florida)
2028 · 65% confidence
3

LC-39A Starship is expected to ramp after initial Florida infrastructure/testing. Base remains below the 44/year EIS cap even after maturity to reflect range conflicts, tanker ope...

Mentions
1570
All verified mentions of this launch vehicle family in source documents.
0.0-5.0
Actions

The specific Raptor engine tested on 2019-02-03 is a flight model intended for use on the Starship hopper test article at SpaceX’s South Texas launch site.

CapabilityPlanValue 4.5Feb 4, 2019SpaceX tests flight version of Raptor engine
Page79of79

Development of the Starship vehicle itself, including the Raptor engines that power it, will continue in Hawthorne, California while at least the prototype versions of Starship are built in Texas.

GrowthCapabilityValue 3.0Jan 16, 2019SpaceX to shift Starship work from California to Texas

SpaceX is planning to build prototypes of its Starship vehicle at its site in South Texas that was originally designed to serve as a launch site.

PlanCapabilityValue 3.0Jan 16, 2019SpaceX to shift Starship work from California to Texas

SpaceX stated that the decision to build Starship prototypes in South Texas does not impact its manufacture, design, and launch operations in Hawthorne and Vandenberg Air Force Base in California.

CapabilityGeneralValue 2.0Jan 16, 2019SpaceX to shift Starship work from California to Texas

SpaceX is developing and will test the Starship test vehicle at its site in South Texas.

PlanCapabilityValue 4.0Jan 16, 2019SpaceX to shift Starship work from California to Texas

An initial prototype version of the Starship vehicle has been taking shape at the South Texas site in advance of hopper tests that could begin in the next one to two months from 2019-01-16.

PlanCapabilityValue 4.0Jan 16, 2019SpaceX to shift Starship work from California to Texas

SpaceX filed an application with the Federal Communications Commission on 2018-11-19 seeking an experimental license to support communications with the Starship hopper during upcoming flights.

LegalValue 4.3Dec 24, 2018Musk teases new details about redesigned next-generation launch system

SpaceX planned a combination of low-altitude Starship hopper flights up to 500 m and high-altitude flights up to 5,0 m from the Texas site.

PlanCapabilityValue 4.0Dec 24, 2018Musk teases new details about redesigned next-generation launch system

Company officials projected Starship hopper flights to begin in late 2019, with Elon Musk indicating those flights could begin as soon as early 2019 and a full technical presentation hoped for in March or April 2019 after the Texas test vehicle flies.

PlanValue 4.0Dec 24, 2018Musk teases new details about redesigned next-generation launch system

SpaceX’s planned Starship tests appear to parallel the company’s earlier development of Grasshopper and F9R Dev vehicles based on the Falcon 9 first stage.

PlanGeneralValue 3.0Nov 23, 2018FCC license application sheds light on SpaceX vehicle testing plans