Polaris Intelligence
Polaris
Intelligence
About
Ctrl K
Sign in
© Polaris Intelligence 2026
PrivacyTermsAdmin
Launch Vehicles
Vehicle family profile

Starship

Family-level launch record combining canonical variants, historical missions, public cadence forecasts, and available payload performance specs.

SpaceXActive
Admin
Variants
3
Canonical variants linked to this family.
Historical missions
12
Missions in the public mission table with actual launch dates.
Peak listed capacity
150,000 kg
Maximum payload capacity across listed variants and orbits.

Launch Cadence

Historical missions are grouped by actual launch year. Forecast cadence uses family-level launch-rate rows.

YearHistorical missionsForecast launches
202320
202440
202550
202613
202707
2028015
2029031
2030050
2031071
2032087
20330103
20340117
20350129
20360133
20370137
20380137
20390137

Performance Specs

Payload capacity by variant and target orbit when structured capacity rows are available.

VariantOrbitCapacityAltitudeInclinationSource
Starship V3
LEO150,000 kgUnknownUnknownStarlink V3 batch-calibrated Starship capacity assumption
Starship V2
LEO35,000 kgUnknownUnknownSpaceX Starship - Wikipedia

Recent Missions

Latest launched missions using variants in this family.

MissionVariantLaunch
Launch 2026-U02
Starship V3
May 22, 2026
Launch 2025-U04
Starship V2
Oct 13, 2025
Launch 2025-U03
Starship V2
Aug 26, 2025
Launch 2025-U02

Variants

Canonical variants rolled up into this launch vehicle family.

VariantStagesMissionsStatus
Starship V1.0
Not stated6Active
Starship V2
Not stated5Retired
Starship V3
Not stated1Active
20400137
20410137

Forecast Location Split

5 launch locations represented.

YearLocationLaunchesConfidenceBasis
2026Space Launch Complex 37B, Cape Canaveral (Cape Canaveral Air Station, Florida)050%SLC-37B is modeled as the first high-throughput CCSFS Starship pad. Base reaches half of the SLC-37 complex cap by 2035, not immediately after redevelopment.
2026Cape Canaveral Space Force Station | SLC-37A045%Modeled as second SLC-37 Starship pad, lagging SLC-37B by one to two years. Mature split reaches 38/year by 2037, keeping complex total at 76/year.
2026Launch Complex 39A, NASA Kennedy Space Center, Florida (NASA John F. Kennedy Space Center, Florida)065%LC-39A Starship is expected to ramp after initial Florida infrastructure/testing. Base remains below the 44/year EIS cap even after maturity to reflect range c...
2026Starship Orbital Pad 1, Boca Chica (Starbase, Boca Chica Beach, Texas)365%Starbase remains the development and early operational hub. Base ramps slowly from test cadence to routine operations; by 2031 it is one of two pads sharing th...
2026Starship Orbital Pad 2, Boca Chica (Starbase, Boca Chica Beach, Texas)050%Second Starbase pad provides incremental operations after pad commissioning. Mature OLP-A + OLP-B total is capped at 25/year in the base/high range.
2027Space Launch Complex 37B, Cape Canaveral (Cape Canaveral Air Station, Florida)050%SLC-37B is modeled as the first high-throughput CCSFS Starship pad. Base reaches half of the SLC-37 complex cap by 2035, not immediately after redevelopment.
2027Launch Complex 39A, NASA Kennedy Space Center, Florida (NASA John F. Kennedy Space Center, Florida)165%LC-39A Starship is expected to ramp after initial Florida infrastructure/testing. Base remains below the 44/year EIS cap even after maturity to reflect range c...
2027Starship Orbital Pad 1, Boca Chica (Starbase, Boca Chica Beach, Texas)565%Starbase remains the development and early operational hub. Base ramps slowly from test cadence to routine operations; by 2031 it is one of two pads sharing th...
2027Starship Orbital Pad 2, Boca Chica (Starbase, Boca Chica Beach, Texas)150%Second Starbase pad provides incremental operations after pad commissioning. Mature OLP-A + OLP-B total is capped at 25/year in the base/high range.
2027Cape Canaveral Space Force Station | SLC-37A045%Modeled as second SLC-37 Starship pad, lagging SLC-37B by one to two years. Mature split reaches 38/year by 2037, keeping complex total at 76/year.
2028Space Launch Complex 37B, Cape Canaveral (Cape Canaveral Air Station, Florida)250%SLC-37B is modeled as the first high-throughput CCSFS Starship pad. Base reaches half of the SLC-37 complex cap by 2035, not immediately after redevelopment.
2028Launch Complex 39A, NASA Kennedy Space Center, Florida (NASA John F. Kennedy Space Center, Florida)365%LC-39A Starship is expected to ramp after initial Florida infrastructure/testing. Base remains below the 44/year EIS cap even after maturity to reflect range c...
2028Starship Orbital Pad 1, Boca Chica (Starbase, Boca Chica Beach, Texas)765%Starbase remains the development and early operational hub. Base ramps slowly from test cadence to routine operations; by 2031 it is one of two pads sharing th...
2028Starship Orbital Pad 2, Boca Chica (Starbase, Boca Chica Beach, Texas)350%Second Starbase pad provides incremental operations after pad commissioning. Mature OLP-A + OLP-B total is capped at 25/year in the base/high range.
2028Cape Canaveral Space Force Station | SLC-37A045%Modeled as second SLC-37 Starship pad, lagging SLC-37B by one to two years. Mature split reaches 38/year by 2037, keeping complex total at 76/year.
2029Space Launch Complex 37B, Cape Canaveral (Cape Canaveral Air Station, Florida)650%SLC-37B is modeled as the first high-throughput CCSFS Starship pad. Base reaches half of the SLC-37 complex cap by 2035, not immediately after redevelopment.
2029Launch Complex 39A, NASA Kennedy Space Center, Florida (NASA John F. Kennedy Space Center, Florida)865%LC-39A Starship is expected to ramp after initial Florida infrastructure/testing. Base remains below the 44/year EIS cap even after maturity to reflect range c...
2029Starship Orbital Pad 1, Boca Chica (Starbase, Boca Chica Beach, Texas)865%Starbase remains the development and early operational hub. Base ramps slowly from test cadence to routine operations; by 2031 it is one of two pads sharing th...
2029Starship Orbital Pad 2, Boca Chica (Starbase, Boca Chica Beach, Texas)750%Second Starbase pad provides incremental operations after pad commissioning. Mature OLP-A + OLP-B total is capped at 25/year in the base/high range.
2029Cape Canaveral Space Force Station | SLC-37A245%Modeled as second SLC-37 Starship pad, lagging SLC-37B by one to two years. Mature split reaches 38/year by 2037, keeping complex total at 76/year.
2030Space Launch Complex 37B, Cape Canaveral (Cape Canaveral Air Station, Florida)1250%SLC-37B is modeled as the first high-throughput CCSFS Starship pad. Base reaches half of the SLC-37 complex cap by 2035, not immediately after redevelopment.
2030Launch Complex 39A, NASA Kennedy Space Center, Florida (NASA John F. Kennedy Space Center, Florida)1265%LC-39A Starship is expected to ramp after initial Florida infrastructure/testing. Base remains below the 44/year EIS cap even after maturity to reflect range c...
2030Starship Orbital Pad 1, Boca Chica (Starbase, Boca Chica Beach, Texas)965%Starbase remains the development and early operational hub. Base ramps slowly from test cadence to routine operations; by 2031 it is one of two pads sharing th...
2030Starship Orbital Pad 2, Boca Chica (Starbase, Boca Chica Beach, Texas)1150%Second Starbase pad provides incremental operations after pad commissioning. Mature OLP-A + OLP-B total is capped at 25/year in the base/high range.
Space Launch Complex 37B, Cape Canaveral (Cape Canaveral Air Station, Florida)
2026 · 50% confidence
0

SLC-37B is modeled as the first high-throughput CCSFS Starship pad. Base reaches half of the SLC-37 complex cap by 2035, not immediately after redevelopment.

Cape Canaveral Space Force Station | SLC-37A
2026 · 45% confidence
0

Modeled as second SLC-37 Starship pad, lagging SLC-37B by one to two years. Mature split reaches 38/year by 2037, keeping complex total at 76/year.

Launch Complex 39A, NASA Kennedy Space Center, Florida (NASA John F. Kennedy Space Center, Florida)
2026 · 65% confidence
0

LC-39A Starship is expected to ramp after initial Florida infrastructure/testing. Base remains below the 44/year EIS cap even after maturity to reflect range conflicts, tanker ope...

Starship Orbital Pad 1, Boca Chica (Starbase, Boca Chica Beach, Texas)
2026 · 65% confidence
3

Starbase remains the development and early operational hub. Base ramps slowly from test cadence to routine operations; by 2031 it is one of two pads sharing the 25/year site cap.

Starship Orbital Pad 2, Boca Chica (Starbase, Boca Chica Beach, Texas)
2026 · 50% confidence
0

Second Starbase pad provides incremental operations after pad commissioning. Mature OLP-A + OLP-B total is capped at 25/year in the base/high range.

Starship V3
TLI21,000 kgUnknownUnknownSpaceX Starship public vehicle page
Starship V1.0
LEO15,000 kgUnknownUnknownSpaceX Starship public/current block summary
Starship V2
May 27, 2025
Launch 2025-F03
Starship V2
Mar 6, 2025
Launch 2025-F01
Starship V2
Jan 16, 2025
Launch 2024-U06
Starship V1.0
Nov 19, 2024
Launch 2024-U04
Starship V1.0
Oct 13, 2024

Forecasted Missions

Upcoming mission rows with announced launch timing.

MissionVariantAnnounced

No forecasted missions

No upcoming announced mission rows are linked to this vehicle family.

Track
Space Launch Complex 37B, Cape Canaveral (Cape Canaveral Air Station, Florida)
2027 · 50% confidence
0

SLC-37B is modeled as the first high-throughput CCSFS Starship pad. Base reaches half of the SLC-37 complex cap by 2035, not immediately after redevelopment.

Launch Complex 39A, NASA Kennedy Space Center, Florida (NASA John F. Kennedy Space Center, Florida)
2027 · 65% confidence
1

LC-39A Starship is expected to ramp after initial Florida infrastructure/testing. Base remains below the 44/year EIS cap even after maturity to reflect range conflicts, tanker ope...

Starship Orbital Pad 1, Boca Chica (Starbase, Boca Chica Beach, Texas)
2027 · 65% confidence
5

Starbase remains the development and early operational hub. Base ramps slowly from test cadence to routine operations; by 2031 it is one of two pads sharing the 25/year site cap.

Starship Orbital Pad 2, Boca Chica (Starbase, Boca Chica Beach, Texas)
2027 · 50% confidence
1

Second Starbase pad provides incremental operations after pad commissioning. Mature OLP-A + OLP-B total is capped at 25/year in the base/high range.

Cape Canaveral Space Force Station | SLC-37A
2027 · 45% confidence
0

Modeled as second SLC-37 Starship pad, lagging SLC-37B by one to two years. Mature split reaches 38/year by 2037, keeping complex total at 76/year.

Space Launch Complex 37B, Cape Canaveral (Cape Canaveral Air Station, Florida)
2028 · 50% confidence
2

SLC-37B is modeled as the first high-throughput CCSFS Starship pad. Base reaches half of the SLC-37 complex cap by 2035, not immediately after redevelopment.

Launch Complex 39A, NASA Kennedy Space Center, Florida (NASA John F. Kennedy Space Center, Florida)
2028 · 65% confidence
3

LC-39A Starship is expected to ramp after initial Florida infrastructure/testing. Base remains below the 44/year EIS cap even after maturity to reflect range conflicts, tanker ope...

Mentions
1569
All verified mentions of this launch vehicle family in source documents.
0.0-5.0
Actions

The fourth flight test of Starship could launch as soon as 2024-06-06 pending regulatory approval.

PlanLegalValue 4.0Jun 1, 2024SpaceX’s Flight 4 of Starship now scheduled for June 6

Propellant transfer demonstrations from Starship Flight 3 provided data intended to support eventual ship-to-ship propellant transfers for missions such as returning astronauts to the Moon under NASA’s Artemis program.

Page55of79
CapabilityPlanValue 3.8May 30, 2024SpaceX Starship still on schedule for fourth flight test June 5

SpaceX plans the fourth flight test of Starship to occur on 2024-06-05 pending an updated Federal Aviation Administration license and regulatory approval.

PlanLegalValue 4.0May 30, 2024SpaceX Starship still on schedule for fourth flight test June 5

The launch window for Starship Flight 4 will open as early as 7 a.m. CT.

PlanValue 3.5May 30, 2024SpaceX Starship still on schedule for fourth flight test June 5

Starship Flight 4 will implement jettison of the Super Heavy’s hot-stage adapter following boostback to reduce booster mass for the final phase of flight.

PlanCapabilityValue 4.0May 30, 2024SpaceX Starship still on schedule for fourth flight test June 5

Starlab Space will work with SpaceX, whose Starship vehicle will launch the Starlab station.

RelationshipsPlanValue 4.2May 29, 2024MDA Space joins Starlab Space commercial space station venture

Starship Flight 4 could launch as soon as 2024-06-05 pending an updated Federal Aviation Administration license and regulatory approval.

PlanLegalValue 4.0May 27, 2024SpaceX may launch fourth flight test of Starship by June 5

IFT-4’s primary objectives include executing a landing burn and achieving a soft splashdown in the Gulf of Mexico for the Super Heavy booster and achieving a controlled entry of Starship.

PlanCapabilityValue 4.0May 24, 2024SpaceX sets early June launch of next Starship test flight

The Federal Aviation Administration began work on an environmental impact statement on 2024-05-10 to address updated Starship infrastructure at Kennedy Space Center Launch Complex 39A.

LegalGeneralValue 4.0May 21, 2024SpaceX nears next Starship test flight as Starbase expansion continues

SpaceX completed a wet dress rehearsal on 2024-05-20 for the Starship vehicle that will conduct its fourth integrated test flight, filling the vehicle with propellants and performing a practice countdown.

PlanCapabilityValue 4.0May 21, 2024SpaceX nears next Starship test flight as Starbase expansion continues

SpaceX explained that Starship could support a lunar base with multiple landings dedicated to services.

CapabilityPlanValue 3.0May 20, 2024Architecting lunar infrastructure

SpaceX aims to use Starship’s propellant tanks for storing other fluids and gases on the Moon.

PlanCapabilityValue 3.5May 20, 2024Architecting lunar infrastructure

An environmental impact statement is required as part of the FAA’s work to approve a launch license for Starship launches from LC-39A.

LegalValue 3.8May 10, 2024FAA to begin environmental review of Starship launches from Kennedy Space Center

The Department of the Air Force EIS will examine using Space Launch Complex 37 and a proposed new site SLC-50 located between SLC-37 and SLC-40 for Starship launches.

PlanGeneralValue 4.0May 10, 2024FAA to begin environmental review of Starship launches from Kennedy Space Center

In the 2019 assessment SpaceX was planning up to 24 Starship launches annually from LC-39A.

PlanGrowthValue 4.0May 10, 2024FAA to begin environmental review of Starship launches from Kennedy Space Center

SpaceX performed an in-flight propellant transfer demonstration during the 2024-03-14 Starship test flight under a NASA Tipping Point contract awarded in 2020.

CapabilityRelationshipsValue 4.5Apr 27, 2024SpaceX making progress on Starship in-space refueling technologies

SpaceX planned to transfer at least 10 metric tons of liquid oxygen from a header tank to the main tank within the Starship upper stage during the 2024-03-14 flight.

PlanCapabilityValue 4.0Apr 27, 2024SpaceX making progress on Starship in-space refueling technologies

SpaceX performed its third integrated Starship test flight on 2024-03-14.

PlanGeneralValue 3.5Apr 10, 2024FAA: no current plans to tax commercial space launches

A planned 'Starship 3' about 25 m taller than Starship 2 will be able to place more than 200 metric tons into orbit in a fully reusable mode.

PlanCapabilityValue 4.0Apr 6, 2024Musk outlines plans to increase Starship launch rate and performance

SpaceX plans the fourth Starship/Super Heavy launch in about a month from 2024-04-04.

PlanGrowthValue 4.0Apr 6, 2024Musk outlines plans to increase Starship launch rate and performance