Family-level launch record combining canonical variants, historical missions, public cadence forecasts, and available payload performance specs.
Historical missions are grouped by actual launch year. Forecast cadence uses family-level launch-rate rows.
| Year | Historical missions | Forecast launches |
|---|---|---|
| 2023 | 2 | 0 |
| 2024 | 4 | 0 |
| 2025 | 5 | 0 |
| 2026 | 1 | 3 |
| 2027 | 0 | 7 |
| 2028 | 0 | 15 |
| 2029 | 0 | 31 |
| 2030 | 0 | 50 |
| 2031 | 0 | 71 |
| 2032 | 0 | 87 |
| 2033 | 0 | 103 |
| 2034 | 0 | 117 |
| 2035 | 0 | 129 |
| 2036 | 0 | 133 |
| 2037 | 0 | 137 |
| 2038 | 0 | 137 |
| 2039 | 0 | 137 |
Payload capacity by variant and target orbit when structured capacity rows are available.
| Variant | Orbit | Capacity | Altitude | Inclination | Source |
|---|---|---|---|---|---|
Starship V3 | LEO | 150,000 kg | Unknown | Unknown | Starlink V3 batch-calibrated Starship capacity assumption |
Starship V2 | LEO | 35,000 kg | Unknown | Unknown | SpaceX Starship - Wikipedia |
Latest launched missions using variants in this family.
| Mission | Variant | Launch |
|---|---|---|
| Launch 2026-U02 | Starship V3 | May 22, 2026 |
| Launch 2025-U04 | Starship V2 | Oct 13, 2025 |
| Launch 2025-U03 | Starship V2 | Aug 26, 2025 |
| Launch 2025-U02 |
Canonical variants rolled up into this launch vehicle family.
| Variant | Stages | Missions | Status |
|---|---|---|---|
Starship V1.0 | Not stated | 6 | Active |
Starship V2 | Not stated | 5 | Retired |
Starship V3 | Not stated | 1 | Active |
| 2040 | 0 | 137 |
| 2041 | 0 | 137 |
5 launch locations represented.
| Year | Location | Launches | Confidence | Basis |
|---|---|---|---|---|
| 2026 | Space Launch Complex 37B, Cape Canaveral (Cape Canaveral Air Station, Florida) | 0 | 50% | SLC-37B is modeled as the first high-throughput CCSFS Starship pad. Base reaches half of the SLC-37 complex cap by 2035, not immediately after redevelopment. |
| 2026 | Cape Canaveral Space Force Station | SLC-37A | 0 | 45% | Modeled as second SLC-37 Starship pad, lagging SLC-37B by one to two years. Mature split reaches 38/year by 2037, keeping complex total at 76/year. |
| 2026 | Launch Complex 39A, NASA Kennedy Space Center, Florida (NASA John F. Kennedy Space Center, Florida) | 0 | 65% | LC-39A Starship is expected to ramp after initial Florida infrastructure/testing. Base remains below the 44/year EIS cap even after maturity to reflect range c... |
| 2026 | Starship Orbital Pad 1, Boca Chica (Starbase, Boca Chica Beach, Texas) | 3 | 65% | Starbase remains the development and early operational hub. Base ramps slowly from test cadence to routine operations; by 2031 it is one of two pads sharing th... |
| 2026 | Starship Orbital Pad 2, Boca Chica (Starbase, Boca Chica Beach, Texas) | 0 | 50% | Second Starbase pad provides incremental operations after pad commissioning. Mature OLP-A + OLP-B total is capped at 25/year in the base/high range. |
| 2027 | Space Launch Complex 37B, Cape Canaveral (Cape Canaveral Air Station, Florida) | 0 | 50% | SLC-37B is modeled as the first high-throughput CCSFS Starship pad. Base reaches half of the SLC-37 complex cap by 2035, not immediately after redevelopment. |
| 2027 | Launch Complex 39A, NASA Kennedy Space Center, Florida (NASA John F. Kennedy Space Center, Florida) | 1 | 65% | LC-39A Starship is expected to ramp after initial Florida infrastructure/testing. Base remains below the 44/year EIS cap even after maturity to reflect range c... |
| 2027 | Starship Orbital Pad 1, Boca Chica (Starbase, Boca Chica Beach, Texas) | 5 | 65% | Starbase remains the development and early operational hub. Base ramps slowly from test cadence to routine operations; by 2031 it is one of two pads sharing th... |
| 2027 | Starship Orbital Pad 2, Boca Chica (Starbase, Boca Chica Beach, Texas) | 1 | 50% | Second Starbase pad provides incremental operations after pad commissioning. Mature OLP-A + OLP-B total is capped at 25/year in the base/high range. |
| 2027 | Cape Canaveral Space Force Station | SLC-37A | 0 | 45% | Modeled as second SLC-37 Starship pad, lagging SLC-37B by one to two years. Mature split reaches 38/year by 2037, keeping complex total at 76/year. |
| 2028 | Space Launch Complex 37B, Cape Canaveral (Cape Canaveral Air Station, Florida) | 2 | 50% | SLC-37B is modeled as the first high-throughput CCSFS Starship pad. Base reaches half of the SLC-37 complex cap by 2035, not immediately after redevelopment. |
| 2028 | Launch Complex 39A, NASA Kennedy Space Center, Florida (NASA John F. Kennedy Space Center, Florida) | 3 | 65% | LC-39A Starship is expected to ramp after initial Florida infrastructure/testing. Base remains below the 44/year EIS cap even after maturity to reflect range c... |
| 2028 | Starship Orbital Pad 1, Boca Chica (Starbase, Boca Chica Beach, Texas) | 7 | 65% | Starbase remains the development and early operational hub. Base ramps slowly from test cadence to routine operations; by 2031 it is one of two pads sharing th... |
| 2028 | Starship Orbital Pad 2, Boca Chica (Starbase, Boca Chica Beach, Texas) | 3 | 50% | Second Starbase pad provides incremental operations after pad commissioning. Mature OLP-A + OLP-B total is capped at 25/year in the base/high range. |
| 2028 | Cape Canaveral Space Force Station | SLC-37A | 0 | 45% | Modeled as second SLC-37 Starship pad, lagging SLC-37B by one to two years. Mature split reaches 38/year by 2037, keeping complex total at 76/year. |
| 2029 | Space Launch Complex 37B, Cape Canaveral (Cape Canaveral Air Station, Florida) | 6 | 50% | SLC-37B is modeled as the first high-throughput CCSFS Starship pad. Base reaches half of the SLC-37 complex cap by 2035, not immediately after redevelopment. |
| 2029 | Launch Complex 39A, NASA Kennedy Space Center, Florida (NASA John F. Kennedy Space Center, Florida) | 8 | 65% | LC-39A Starship is expected to ramp after initial Florida infrastructure/testing. Base remains below the 44/year EIS cap even after maturity to reflect range c... |
| 2029 | Starship Orbital Pad 1, Boca Chica (Starbase, Boca Chica Beach, Texas) | 8 | 65% | Starbase remains the development and early operational hub. Base ramps slowly from test cadence to routine operations; by 2031 it is one of two pads sharing th... |
| 2029 | Starship Orbital Pad 2, Boca Chica (Starbase, Boca Chica Beach, Texas) | 7 | 50% | Second Starbase pad provides incremental operations after pad commissioning. Mature OLP-A + OLP-B total is capped at 25/year in the base/high range. |
| 2029 | Cape Canaveral Space Force Station | SLC-37A | 2 | 45% | Modeled as second SLC-37 Starship pad, lagging SLC-37B by one to two years. Mature split reaches 38/year by 2037, keeping complex total at 76/year. |
| 2030 | Space Launch Complex 37B, Cape Canaveral (Cape Canaveral Air Station, Florida) | 12 | 50% | SLC-37B is modeled as the first high-throughput CCSFS Starship pad. Base reaches half of the SLC-37 complex cap by 2035, not immediately after redevelopment. |
| 2030 | Launch Complex 39A, NASA Kennedy Space Center, Florida (NASA John F. Kennedy Space Center, Florida) | 12 | 65% | LC-39A Starship is expected to ramp after initial Florida infrastructure/testing. Base remains below the 44/year EIS cap even after maturity to reflect range c... |
| 2030 | Starship Orbital Pad 1, Boca Chica (Starbase, Boca Chica Beach, Texas) | 9 | 65% | Starbase remains the development and early operational hub. Base ramps slowly from test cadence to routine operations; by 2031 it is one of two pads sharing th... |
| 2030 | Starship Orbital Pad 2, Boca Chica (Starbase, Boca Chica Beach, Texas) | 11 | 50% | Second Starbase pad provides incremental operations after pad commissioning. Mature OLP-A + OLP-B total is capped at 25/year in the base/high range. |
SLC-37B is modeled as the first high-throughput CCSFS Starship pad. Base reaches half of the SLC-37 complex cap by 2035, not immediately after redevelopment.
Modeled as second SLC-37 Starship pad, lagging SLC-37B by one to two years. Mature split reaches 38/year by 2037, keeping complex total at 76/year.
LC-39A Starship is expected to ramp after initial Florida infrastructure/testing. Base remains below the 44/year EIS cap even after maturity to reflect range conflicts, tanker ope...
Starbase remains the development and early operational hub. Base ramps slowly from test cadence to routine operations; by 2031 it is one of two pads sharing the 25/year site cap.
Second Starbase pad provides incremental operations after pad commissioning. Mature OLP-A + OLP-B total is capped at 25/year in the base/high range.
Starship V3 | TLI | 21,000 kg | Unknown | Unknown | SpaceX Starship public vehicle page |
Starship V1.0 | LEO | 15,000 kg | Unknown | Unknown | SpaceX Starship public/current block summary |
Starship V2 |
| May 27, 2025 |
| Launch 2025-F03 | Starship V2 | Mar 6, 2025 |
| Launch 2025-F01 | Starship V2 | Jan 16, 2025 |
| Launch 2024-U06 | Starship V1.0 | Nov 19, 2024 |
| Launch 2024-U04 | Starship V1.0 | Oct 13, 2024 |
Upcoming mission rows with announced launch timing.
| Mission | Variant | Announced |
|---|---|---|
No forecasted missionsNo upcoming announced mission rows are linked to this vehicle family. | ||
SLC-37B is modeled as the first high-throughput CCSFS Starship pad. Base reaches half of the SLC-37 complex cap by 2035, not immediately after redevelopment.
LC-39A Starship is expected to ramp after initial Florida infrastructure/testing. Base remains below the 44/year EIS cap even after maturity to reflect range conflicts, tanker ope...
Starbase remains the development and early operational hub. Base ramps slowly from test cadence to routine operations; by 2031 it is one of two pads sharing the 25/year site cap.
Second Starbase pad provides incremental operations after pad commissioning. Mature OLP-A + OLP-B total is capped at 25/year in the base/high range.
Modeled as second SLC-37 Starship pad, lagging SLC-37B by one to two years. Mature split reaches 38/year by 2037, keeping complex total at 76/year.
SLC-37B is modeled as the first high-throughput CCSFS Starship pad. Base reaches half of the SLC-37 complex cap by 2035, not immediately after redevelopment.
LC-39A Starship is expected to ramp after initial Florida infrastructure/testing. Base remains below the 44/year EIS cap even after maturity to reflect range conflicts, tanker ope...
Arianespace's chief commercial officer Steven Rutgers stated that Starship's primary mission in its initial years will be to launch the Starlink constellation and support NASA's lunar ambitions.
The Starlab station is designed to feature a single large habitation and lab module and to launch on SpaceX’s Starship vehicle.
The report discusses the imminent introduction of the Starship super heavy launcher by SpaceX.
During the 2024-06-06 flight test, the Starship capsule survived and the Super Heavy booster executed a landing burn and achieved a soft splashdown in the Gulf of Mexico about eight minutes after launch.
Starlink satellites provided a continuously available livestream during Starship’s reentry on 2024-06-06.
Both the Starship capsule and the Super Heavy booster performed a soft splashdown in the Gulf of Mexico about eight minutes after launch during the 2024-06-06 test flight.
The fourth test flight of Starship launched from SpaceX’s Starbase facility in Texas on Thursday morning, 2024-06-06.
Starship flew a planned suborbital trajectory on 2024-06-06 and did not exhibit the rolling seen on the March flight.
Starship performed a landing burn and splashed down about 65 minutes after liftoff on the 2024-06-06 test flight.
The FAA’s updated license for Starship made no major changes to how SpaceX would conduct the 2024-06-06 launch but was required for the mission to proceed.
SpaceX’s Starship vehicle lifted off at 8:50 a.m. Eastern from the Starbase test site at Boca Chica, Texas on 2024-06-06.
The fourth flight test of SpaceX’s Starship is targeted to launch from Starbase in Texas on Thursday, 2024-06-06.
K2 Space expects continued demand for the Mega Class after Starship is flying, with the Mega Class capable of launching 50 units at a time on Starship.
Starship Flight 4 is scheduled to launch no earlier than Thursday, 2024-06-06 from SpaceX’s Starbase facility near Boca Chica Beach in South Texas.
The launch window for Starship Flight 4 will open as early as 7 a.m. CT.
SpaceX implemented software and hardware upgrades to increase overall reliability and address lessons learned from Starship Flight 3.
Dennis Tito announced in October 2022 that he and his wife intended to fly on a Starship mission around the moon along with up to 10 other people.
SpaceX holds a Human Landing System contract awarded in 2021 to perform a crewed lunar landing using Starship for NASA.
SpaceX performed a dress rehearsal with Starship and Super Heavy loaded with more than £10,000,000of propellant ahead of Flight 4.
The fourth flight test of Starship could launch as soon as 2024-06-05 pending an updated Federal Aviation Administration license and regulatory approval.