Polaris Intelligence
Polaris
Intelligence
About
Ctrl K
Sign in
© Polaris Intelligence 2026
PrivacyTermsAdmin
Launch Vehicles
Vehicle family profile

Miura 5

Family-level launch record combining canonical variants, historical missions, public cadence forecasts, and available payload performance specs.

PLD SpaceDevelopment
Admin
Variants
1
Canonical variants linked to this family.
Historical missions
0
Missions in the public mission table with actual launch dates.
Peak listed capacity
540 kg
Maximum payload capacity across listed variants and orbits.

Launch Cadence

Historical missions are grouped by actual launch year. Forecast cadence uses family-level launch-rate rows.

YearHistorical missionsForecast launches
202606
202706
202806
202906
203006
203106
203206
203306
203406
203506
203606
203706
203806
203906
204006
204106

Forecast Location Split

1 launch location represented.

Performance Specs

Payload capacity by variant and target orbit when structured capacity rows are available.

VariantOrbitCapacityAltitudeInclinationSource
Miura 5
SSO540 kg500 kmUnknownPLD Space SPARK Opportunity Overview

Recent Missions

Latest launched missions using variants in this family.

MissionVariantLaunch

No recent missions

No launched missions are linked to variants in this family.

Forecasted Missions

Upcoming mission rows with announced launch timing.

MissionVariantAnnounced

No forecasted missions

No upcoming announced mission rows are linked to this vehicle family.

Variants

Canonical variants rolled up into this launch vehicle family.

VariantStagesMissionsStatus
Miura 5
Not stated0Development
YearLocationLaunchesConfidenceBasis
2026Guiana Space Centre620%Editable low-confidence early operational cadence default for Miura 5.
2027Guiana Space Centre620%Editable low-confidence early operational cadence default for Miura 5.
2028Guiana Space Centre620%Editable low-confidence early operational cadence default for Miura 5.
2029Guiana Space Centre620%Editable low-confidence early operational cadence default for Miura 5.
2030Guiana Space Centre620%Editable low-confidence early operational cadence default for Miura 5.
2031Guiana Space Centre620%Editable low-confidence early operational cadence default for Miura 5.
2032Guiana Space Centre620%Editable low-confidence early operational cadence default for Miura 5.
2033Guiana Space Centre620%Editable low-confidence early operational cadence default for Miura 5.
2034Guiana Space Centre620%Editable low-confidence early operational cadence default for Miura 5.
2035Guiana Space Centre620%Editable low-confidence early operational cadence default for Miura 5.
2036Guiana Space Centre620%Editable low-confidence early operational cadence default for Miura 5.
2037Guiana Space Centre620%Editable low-confidence early operational cadence default for Miura 5.
2038Guiana Space Centre620%Editable low-confidence early operational cadence default for Miura 5.
2039Guiana Space Centre620%Editable low-confidence early operational cadence default for Miura 5.
2040Guiana Space Centre620%Editable low-confidence early operational cadence default for Miura 5.
2041Guiana Space Centre620%Editable low-confidence early operational cadence default for Miura 5. Site-year coverage backfill copied nearest prior site-rate row.
Guiana Space Centre
2026 · 20% confidence
6

Editable low-confidence early operational cadence default for Miura 5.

Guiana Space Centre
2027 · 20% confidence
6

Editable low-confidence early operational cadence default for Miura 5.

Guiana Space Centre
2028 · 20% confidence
6

Editable low-confidence early operational cadence default for Miura 5.

Guiana Space Centre
2029 · 20% confidence
6

Editable low-confidence early operational cadence default for Miura 5.

Guiana Space Centre
2030 · 20% confidence
6

Editable low-confidence early operational cadence default for Miura 5.

Guiana Space Centre
2031 · 20% confidence
6

Editable low-confidence early operational cadence default for Miura 5.

Guiana Space Centre
2032 · 20% confidence
6

Editable low-confidence early operational cadence default for Miura 5.

Guiana Space Centre
2033 · 20% confidence
6

Editable low-confidence early operational cadence default for Miura 5.

Guiana Space Centre
2034 · 20% confidence
6

Editable low-confidence early operational cadence default for Miura 5.

Guiana Space Centre
2035 · 20% confidence
6

Editable low-confidence early operational cadence default for Miura 5.

Guiana Space Centre
2036 · 20% confidence
6

Editable low-confidence early operational cadence default for Miura 5.

Guiana Space Centre
2037 · 20% confidence
6

Editable low-confidence early operational cadence default for Miura 5.

Track
Mentions
272
All verified mentions of this launch vehicle family in source documents.
0.0-5.0
Actions

PLD Space is developing the MIURA 5 orbital rocket, which is scheduled to launch in 2025 from the Kourou spaceport in French Guiana.

PlanCapabilityValue 4.0Sep 20, 2023PLD Space’s MOU with WISeKey to launch nexgen ultra-secure satellites with MIURA 5
Page13of14

CNES granted PLD Space permission to operate MIURA 5 at the Guiana Space Centre (Kourou) in 2025.

RelationshipsLegalValue 4.0Jul 6, 2023PLD Space Secures Spanish Government Contract to Develop Micro Launcher

PLD Space is one of three European companies authorized by the French Space Agency (CNES), through a binding agreement, to operate MIURA 5 from the CSG Space Centre in French Guiana.

RelationshipsLegalValue 4.0Jul 5, 2023PLD Space wins partnership contract to develop a micro launcher

The first suborbital flight of MIURA 1 will provide information to validate much of the design and technology intended to serve as the basis for the MIURA 5 orbital launcher.

PlanCapabilityValue 3.5Jul 5, 2023PLD Space wins partnership contract to develop a micro launcher

PLD Space signed a binding contract with the French space agency CNES on 2023-06-21 to use the former Diamant launch site in Kourou, French Guiana, for Miura 5.

RelationshipsPlanGeneralValue 4.6Jun 27, 2023PLD Space postpones first launch to September

PLD Space designs and builds reusable orbital micro-launchers under the MIURA family, including the suborbital MIURA 1 and the orbital MIURA 5.

CapabilityValue 4.0Jun 20, 2023UPDATE 2: PLD Space’s Mission MIURA 1 test flight scrubbed ‘to be back soon’

MIURA 5 is the launcher that PLD Space expects to use to start its commercial activity in 2025.

PlanGeneralValue 3.4May 25, 2023PLD Space achieves major milestone and prepares for launch of MIURA 1 micro rocket

Development of MIURA 5 has recently started in facilities that PLD Space is expanding within the Teruel airport site.

PlanGrowthValue 4.0May 25, 2023PLD Space achieves major milestone and prepares for launch of MIURA 1 micro rocket

PLD Space is working on a Series C funding round of 150,000,000 EUR to support development of Miura 5 and the beginning of commercial operations.

FinancialCapabilityGrowthValue 4.0May 18, 2023PLD Space prepares for suborbital test launch

Miura 5 is a small launch vehicle PLD Space is developing that is capable of placing up to 500 kg into orbit starting as soon as 2025.

CapabilityPlanGeneralValue 4.0May 18, 2023PLD Space prepares for suborbital test launch

PLD Space is preparing to sign the first binding contracts for launching satellites with its Miura 5 small launch vehicle and is working to close a new large investment round.

RelationshipsFinancialPlanValue 4.2Feb 12, 2023Launch demand remains high despite industry struggles

PLD Space designed the Miura 5 to place about 450 kg into low Earth orbit.

CapabilityValue 4.0Sep 16, 2022PLD Space completes static-fire tests of Miura 1

PLD Space is using the same vehicle technology and control center for Miura 1 as it plans to use for Miura 5.

CapabilityPlanValue 3.4Sep 16, 2022PLD Space completes static-fire tests of Miura 1

PLD Space expects to use existing infrastructure at Kourou for initial Miura 5 launches and to develop additional facilities over time as launch rate increases.

PlanGrowthValue 4.0Sep 16, 2022PLD Space completes static-fire tests of Miura 1

PLD Space scheduled the Miura 5 first launch in 2024 from Kourou, French Guiana, where the company will share a new multiuser launch facility.

PlanGrowthGeneralValue 4.2Sep 16, 2022PLD Space completes static-fire tests of Miura 1

PLD Space intends to use Miura 1 operations to train staff in manufacturing and operations and to reduce risk for the first launch of Miura 5.

PlanCapabilityGrowthValue 3.7Sep 16, 2022PLD Space completes static-fire tests of Miura 1

PLD Space designed the primary purpose of Miura 1 to demonstrate technology for the Miura 5 orbital launch vehicle under development.

CapabilityPlanValue 3.6Sep 16, 2022PLD Space completes static-fire tests of Miura 1

PLD Space will manufacture the MIURA 5 orbital vehicle and subsequently launch it in 2024 from French Guiana.

PlanCapabilityValue 4.2Jan 3, 2022Series B Funding For PLD Space Attracts Million$$

Miura 5 will be prepared to carry 450 kg to a 500-kilometer circular Sun-synchronous orbit as a baseline mission.

CapabilityValue 4.0Nov 24, 2021Spanish startup PLD Space gears up for 2022 suborbital launch

Subsystem tests for the Miura 5 will begin next year with a target first launch in 2024-07-01 from French Guiana.

PlanGrowthValue 4.0Nov 24, 2021Spanish startup PLD Space gears up for 2022 suborbital launch