Polaris Intelligence
Polaris
Intelligence
About
Ctrl K
Sign in
© Polaris Intelligence 2026
PrivacyTermsAdmin
Launch Vehicles
Vehicle family profile

Miura 5

Family-level launch record combining canonical variants, historical missions, public cadence forecasts, and available payload performance specs.

PLD SpaceDevelopment
Admin
Variants
1
Canonical variants linked to this family.
Historical missions
0
Missions in the public mission table with actual launch dates.
Peak listed capacity
540 kg
Maximum payload capacity across listed variants and orbits.

Launch Cadence

Historical missions are grouped by actual launch year. Forecast cadence uses family-level launch-rate rows.

YearHistorical missionsForecast launches
202606
202706
202806
202906
203006
203106
203206
203306
203406
203506
203606
203706
203806
203906
204006
204106

Forecast Location Split

1 launch location represented.

Performance Specs

Payload capacity by variant and target orbit when structured capacity rows are available.

VariantOrbitCapacityAltitudeInclinationSource
Miura 5
SSO540 kg500 kmUnknownPLD Space SPARK Opportunity Overview

Recent Missions

Latest launched missions using variants in this family.

MissionVariantLaunch

No recent missions

No launched missions are linked to variants in this family.

Forecasted Missions

Upcoming mission rows with announced launch timing.

MissionVariantAnnounced

No forecasted missions

No upcoming announced mission rows are linked to this vehicle family.

Variants

Canonical variants rolled up into this launch vehicle family.

VariantStagesMissionsStatus
Miura 5
Not stated0Development
YearLocationLaunchesConfidenceBasis
2026Guiana Space Centre620%Editable low-confidence early operational cadence default for Miura 5.
2027Guiana Space Centre620%Editable low-confidence early operational cadence default for Miura 5.
2028Guiana Space Centre620%Editable low-confidence early operational cadence default for Miura 5.
2029Guiana Space Centre620%Editable low-confidence early operational cadence default for Miura 5.
2030Guiana Space Centre620%Editable low-confidence early operational cadence default for Miura 5.
2031Guiana Space Centre620%Editable low-confidence early operational cadence default for Miura 5.
2032Guiana Space Centre620%Editable low-confidence early operational cadence default for Miura 5.
2033Guiana Space Centre620%Editable low-confidence early operational cadence default for Miura 5.
2034Guiana Space Centre620%Editable low-confidence early operational cadence default for Miura 5.
2035Guiana Space Centre620%Editable low-confidence early operational cadence default for Miura 5.
2036Guiana Space Centre620%Editable low-confidence early operational cadence default for Miura 5.
2037Guiana Space Centre620%Editable low-confidence early operational cadence default for Miura 5.
2038Guiana Space Centre620%Editable low-confidence early operational cadence default for Miura 5.
2039Guiana Space Centre620%Editable low-confidence early operational cadence default for Miura 5.
2040Guiana Space Centre620%Editable low-confidence early operational cadence default for Miura 5.
2041Guiana Space Centre620%Editable low-confidence early operational cadence default for Miura 5. Site-year coverage backfill copied nearest prior site-rate row.
Guiana Space Centre
2026 · 20% confidence
6

Editable low-confidence early operational cadence default for Miura 5.

Guiana Space Centre
2027 · 20% confidence
6

Editable low-confidence early operational cadence default for Miura 5.

Guiana Space Centre
2028 · 20% confidence
6

Editable low-confidence early operational cadence default for Miura 5.

Guiana Space Centre
2029 · 20% confidence
6

Editable low-confidence early operational cadence default for Miura 5.

Guiana Space Centre
2030 · 20% confidence
6

Editable low-confidence early operational cadence default for Miura 5.

Guiana Space Centre
2031 · 20% confidence
6

Editable low-confidence early operational cadence default for Miura 5.

Guiana Space Centre
2032 · 20% confidence
6

Editable low-confidence early operational cadence default for Miura 5.

Guiana Space Centre
2033 · 20% confidence
6

Editable low-confidence early operational cadence default for Miura 5.

Guiana Space Centre
2034 · 20% confidence
6

Editable low-confidence early operational cadence default for Miura 5.

Guiana Space Centre
2035 · 20% confidence
6

Editable low-confidence early operational cadence default for Miura 5.

Guiana Space Centre
2036 · 20% confidence
6

Editable low-confidence early operational cadence default for Miura 5.

Guiana Space Centre
2037 · 20% confidence
6

Editable low-confidence early operational cadence default for Miura 5.

Track
Mentions
272
All verified mentions of this launch vehicle family in source documents.
0.0-5.0
Actions

PLD Space plans to open new headquarters in Elche (Alicante) in the first half of 2024 for manufacture and assembly of preliminary MIURA 5 units.

PlanGrowthCapabilityValue 4.0Feb 1, 2024PLD Space Awarded €40.5 Million PERTE Contract for Space Launcher Development
Page12of14

Miura 5 builds on PLD Space’s experience developing the Miura 1 suborbital rocket.

GeneralValue 2.5Jan 30, 2024PLD Space wins Spanish government funding for Miura 5 launch vehicle

PLD Space secured 40,500,000 EUR from the Spanish government after completing a preliminary design review of its Miura 5 launch vehicle.

RelationshipsFinancialCapabilityPlanValue 4.0Jan 30, 2024PLD Space wins Spanish government funding for Miura 5 launch vehicle

PLD Space is opening a new headquarters facility that will host initial production of the Miura 5.

GrowthPlanCapabilityValue 4.0Jan 30, 2024PLD Space wins Spanish government funding for Miura 5 launch vehicle

PLD Space is working on tests of components of the TEPREL-C engine that will power Miura 5.

CapabilityPlanValue 4.0Jan 30, 2024PLD Space wins Spanish government funding for Miura 5 launch vehicle

PLD Space will offer a launch service with its MIURA 5 vehicle suitable for the market from the end of 2025.

PlanGeneralValue 3.5Jan 28, 2024PLD Space contracted by ESA and the EC for the Flight Ticket Initiative

The European institutions recognize that with MIURA 5 PLD Space will offer a launch service suitable for the market from the end of 2025.

PlanGeneralValue 3.0Jan 25, 2024ESA and the European Commission give the Flight Ticket Initiative to PLD Space for launch contracts

PLD Space is working on the Miura 5 small launch vehicle, set for launches as soon as 2025.

PlanValue 4.2Nov 27, 2023Europe turns to competition to improve its launch industry’s competitiveness

PLD Space successfully launched its Miura 1 suborbital rocket on 2023-10-06 and is developing the Miura 5 small orbital launch vehicle.

PlanCapabilityValue 4.0Nov 15, 2023European launch deal praised despite competition questions

MIURA 5’s first flight is planned for 2025 from the Guiana Space Centre (CSG) in Kourou, French Guiana.

PlanGeneralValue 4.0Oct 23, 2023PLD Space Strengthens its Position at the Forefront of European Space Race

PLD Space plans to begin MIURA 5 commercial launches in 2026.

PlanValue 4.0Oct 23, 2023PLD Space Strengthens its Position at the Forefront of European Space Race

PLD Space planned first MIURA 5 subsystem tests by the end of 2023.

PlanValue 3.5Oct 23, 2023PLD Space Strengthens its Position at the Forefront of European Space Race

PLD Space plans the first Miura 5 launch from a new pad in French Guiana no earlier than the first quarter of 2026.

PlanGrowthValue 4.0Oct 20, 2023PLD Space calls first launch a success

PLD Space is developing the Miura 5 small launch vehicle for dedicated missions that cannot be served by rideshare missions.

PlanCapabilityValue 3.0Oct 18, 2023Small launch companies struggle to compete with SpaceX rideshare missions

Over 90% of the PLD Space team is currently dedicated to developing the MIURA 5 orbital launcher.

CapabilityPlanValue 3.0Oct 9, 2023PLD Space Makes History Completing the Launch of First Private European Rocket

PLD Space plans to begin commercial operations for the MIURA 5 orbital launcher in 2026.

PlanValue 4.4Oct 8, 2023PLD Space successfully completes 1st private space rocket launch in Europe

Over 90% of the PLD Space team is currently dedicated to developing the MIURA 5 orbital launcher.

CapabilityPlanGrowthValue 3.0Oct 8, 2023PLD Space successfully completes 1st private space rocket launch in Europe

PLD Space expects Miura 1 will help validate 70% of the design and technology planned for Miura 5.

CapabilityPlanValue 3.6Oct 7, 2023PLD Space launches first suborbital rocket

PLD Space signed an agreement with WISeSat.Space, a subsidiary of WISeKey International Holding Ltd., to launch a next generation of ultra-secure, sub-500 kg satellites for Quantum-Ready Internet of Things communications on the MIURA 5 orbital launcher.

RelationshipsPlanCapabilityValue 5.0Sep 20, 2023PLD Space’s MOU with WISeKey to launch nexgen ultra-secure satellites with MIURA 5

The first suborbital flight of MIURA 1 will provide data to validate up to 70% of the design and technology that will be transferred and integrated into MIURA 5.

PlanCapabilityValue 4.0Sep 20, 2023PLD Space’s MOU with WISeKey to launch nexgen ultra-secure satellites with MIURA 5