Polaris Intelligence
Polaris
Intelligence
About
Ctrl K
Sign in
© Polaris Intelligence 2026
PrivacyTermsAdmin
Launch Vehicles
Vehicle family profile

Vega E

Family-level launch record combining canonical variants, historical missions, public cadence forecasts, and available payload performance specs.

AvioDevelopment
Admin
Variants
1
Canonical variants linked to this family.
Historical missions
0
Missions in the public mission table with actual launch dates.
Peak listed capacity
3,000 kg
Maximum payload capacity across listed variants and orbits.

Launch Cadence

Historical missions are grouped by actual launch year. Forecast cadence uses family-level launch-rate rows.

YearHistorical missionsForecast launches
202600
202700
202800
202901
203002
203103
203204
203306
203406
203506
203606
203706
203806
203906
204006
204106

Forecast Location Split

1 launch location represented.

Performance Specs

Payload capacity by variant and target orbit when structured capacity rows are available.

VariantOrbitCapacityAltitudeInclinationSource
Vega E
SSO3,000 kgUnknownUnknownAvio / ESA Vega E development contracts press release
Vega E
LEO3,000 kgUnknownUnknownAvio / ESA Vega E development contracts press release

Recent Missions

Latest launched missions using variants in this family.

MissionVariantLaunch

No recent missions

No launched missions are linked to variants in this family.

Forecasted Missions

Upcoming mission rows with announced launch timing.

MissionVariantAnnounced

No forecasted missions

No upcoming announced mission rows are linked to this vehicle family.

Variants

Canonical variants rolled up into this launch vehicle family.

VariantStagesMissionsStatus
Vega E
Not stated0Development
YearLocationLaunchesConfidenceBasis
2026Guiana Space Centre | Vega E launch pad055%Pre-service explicit zero-capacity site-year inserted for catalog coverage before first available site-rate row.
2027Guiana Space Centre | Vega E launch pad055%Pre-service explicit zero-capacity site-year inserted for catalog coverage before first available site-rate row.
2028Guiana Space Centre | Vega E launch pad055%Pre-service explicit zero-capacity site-year inserted for catalog coverage before first available site-rate row.
2029Guiana Space Centre | Vega E launch pad155%manual_site_rate_from_vega_e_development_and_vega_c_cadence_context
2030Guiana Space Centre | Vega E launch pad255%manual_site_rate_from_vega_e_development_and_vega_c_cadence_context
2031Guiana Space Centre | Vega E launch pad355%manual_site_rate_from_vega_e_development_and_vega_c_cadence_context
2032Guiana Space Centre | Vega E launch pad455%manual_site_rate_from_vega_e_development_and_vega_c_cadence_context
2033Guiana Space Centre | Vega E launch pad655%manual_site_rate_from_vega_e_development_and_vega_c_cadence_context
2034Guiana Space Centre | Vega E launch pad655%manual_site_rate_from_vega_e_development_and_vega_c_cadence_context
2035Guiana Space Centre | Vega E launch pad655%manual_site_rate_from_vega_e_development_and_vega_c_cadence_context
2036Guiana Space Centre | Vega E launch pad655%manual_site_rate_from_vega_e_development_and_vega_c_cadence_context
2037Guiana Space Centre | Vega E launch pad655%manual_site_rate_from_vega_e_development_and_vega_c_cadence_context
2038Guiana Space Centre | Vega E launch pad655%manual_site_rate_from_vega_e_development_and_vega_c_cadence_context
2039Guiana Space Centre | Vega E launch pad655%manual_site_rate_from_vega_e_development_and_vega_c_cadence_context
2040Guiana Space Centre | Vega E launch pad655%manual_site_rate_from_vega_e_development_and_vega_c_cadence_context
2041Guiana Space Centre | Vega E launch pad655%manual_site_rate_from_vega_e_development_and_vega_c_cadence_context Site-year coverage backfill copied nearest prior site-rate row.
Guiana Space Centre | Vega E launch pad
2026 · 55% confidence
0

Pre-service explicit zero-capacity site-year inserted for catalog coverage before first available site-rate row.

Guiana Space Centre | Vega E launch pad
2027 · 55% confidence
0

Pre-service explicit zero-capacity site-year inserted for catalog coverage before first available site-rate row.

Guiana Space Centre | Vega E launch pad
2028 · 55% confidence
0

Pre-service explicit zero-capacity site-year inserted for catalog coverage before first available site-rate row.

Guiana Space Centre | Vega E launch pad
2029 · 55% confidence
1

manual_site_rate_from_vega_e_development_and_vega_c_cadence_context

Guiana Space Centre | Vega E launch pad
2030 · 55% confidence
2

manual_site_rate_from_vega_e_development_and_vega_c_cadence_context

Guiana Space Centre | Vega E launch pad
2031 · 55% confidence
3

manual_site_rate_from_vega_e_development_and_vega_c_cadence_context

Guiana Space Centre | Vega E launch pad
2032 · 55% confidence
4

manual_site_rate_from_vega_e_development_and_vega_c_cadence_context

Guiana Space Centre | Vega E launch pad
2033 · 55% confidence
6

manual_site_rate_from_vega_e_development_and_vega_c_cadence_context

Guiana Space Centre | Vega E launch pad
2034 · 55% confidence
6

manual_site_rate_from_vega_e_development_and_vega_c_cadence_context

Guiana Space Centre | Vega E launch pad
2035 · 55% confidence
6

manual_site_rate_from_vega_e_development_and_vega_c_cadence_context

Guiana Space Centre | Vega E launch pad
2036 · 55% confidence
6

manual_site_rate_from_vega_e_development_and_vega_c_cadence_context

Guiana Space Centre | Vega E launch pad
2037 · 55% confidence
6

manual_site_rate_from_vega_e_development_and_vega_c_cadence_context

Track
Mentions
13
All verified mentions of this launch vehicle family in source documents.
0.0-5.0
Actions

The future Vega E launcher is planned to debut in 2030.

PlanValue 4.0May 21, 2026L’economia del “sorriso”, la prima missione congiunta Europa e Cina

The MR60 is described as the 'building block' of the post-Vega E 'Vega Next' launch vehicle, which Avio expects to introduce after 2032.

Plan
Capability
Value 3.8
Oct 29, 2025
Avio Reveals More Hardware for its FD1 Rocket Demonstrator

In March 2023, Avio was awarded a €181 million contract for its Space Transportation System (STS) programme to mature key technologies for its Vega E successor.

RelationshipsPlanFinancialValue 4.6Oct 29, 2025Avio Reveals More Hardware for its FD1 Rocket Demonstrator

Avio received €103.7 million to develop the MR60 rocket engine, a more powerful variant of its MR10 engine, for the upper stage of the Vega E rocket.

CapabilityFinancialPlanValue 4.6Oct 20, 2025Avio Reaches Key Milestone in the Development of its FD1 Rocket Demonstrator

The MR60 engine is designed as the 'building block' of the post-Vega-E Vega Next launch vehicle, anticipated for introduction beyond 2032.

PlanCapabilityValue 4.0Oct 20, 2025Avio Reaches Key Milestone in the Development of its FD1 Rocket Demonstrator

Avio's growth will be driven by a higher Vega C launch cadence, the introduction of Vega E, continued participation in the Ariane 6 programme, and the construction of a new defence production facility in the United States, expected to be completed by 2028.

GrowthPlanCapabilityValue 4.0Sep 12, 2025Avio Approves €400M Capital Increase to Expand Defence and Rocket Production

A second ESA contract will fund further development of the Vega E upgraded rocket up to final ground qualification.

RelationshipsPlanCapabilityValue 4.0Dec 19, 2024ESA and Avio sign contracts for Vega upgrades and new launch

The launch agreement calls for allocation of existing infrastructure at the Kourou spaceport for Vega rockets, including using the former Ariane 5 pad for launches of the Vega E.

RelationshipsPlanValue 4.4Nov 7, 2023EU finalizing contract with SpaceX for Galileo launches

ESA is supporting development of the M10 upper stage engine for the Vega E variant, which is slated to make its first launch around 2025.

PlanCapabilityRelationshipsValue 4.0Mar 24, 2022Arianespace and SpaceX work to adjust launch manifests

A test-firing of Vega E’s methane engine 3D-printed thrust chamber was completed at NASA’s Marshall Space Flight Center and reported by the European Space Agency on 2020-03-03.

CapabilityGeneralValue 4.0Mar 26, 2020Avio, exempt from Italy’s coronavirus lockdown, seeks reopening of French Guiana spaceport

Avio is developing Vega E, a variant planned for around 2025 that would replace Vega C’s third and fourth stages with a single liquid-oxygen and methane-powered stage and increase lift capacity to 2,800 kg.

PlanCapabilityValue 5.0Mar 26, 2020Avio, exempt from Italy’s coronavirus lockdown, seeks reopening of French Guiana spaceport

Italy’s Ministry of Defence is considering satellites around 2,000 to 2,300 kg so they would be small enough to launch on Vega C or the longer-term Vega E and replace the ten-year-old Sicral-1B satellite.

PlanCapabilityGrowthValue 4.0Jul 23, 2019Italian team to build satellite for European Commission’s Govsatcom project

The European Space Agency provided €53 million toward Vega E in November.

FinancialPlanValue 4.0Aug 8, 2018Vega’s long-awaited (small) successes