Polaris Intelligence
Polaris
Intelligence
About
Ctrl K
Sign in
© Polaris Intelligence 2026
PrivacyTermsAdmin
Launch Vehicles
Vehicle family profile

Maia

Family-level launch record combining canonical variants, historical missions, public cadence forecasts, and available payload performance specs.

MaiaSpaceDevelopment
Admin
Variants
1
Canonical variants linked to this family.
Historical missions
0
Missions in the public mission table with actual launch dates.
Peak listed capacity
1,500 kg
Maximum payload capacity across listed variants and orbits.

Launch Cadence

Historical missions are grouped by actual launch year. Forecast cadence uses family-level launch-rate rows.

YearHistorical missionsForecast launches
202604
202704
202804
202904
203004
203104
203204
203304
203404
203504
203604
203704
203804
203904
204004
204104

Forecast Location Split

1 launch location represented.

Performance Specs

Payload capacity by variant and target orbit when structured capacity rows are available.

VariantOrbitCapacityAltitudeInclinationSource
Maia
LEO1,500 kgUnknownUnknownMaiaSpace Launcher
Maia
SSO1,500 kg700 kmUnknownMaiaSpace Launcher

Recent Missions

Latest launched missions using variants in this family.

MissionVariantLaunch

No recent missions

No launched missions are linked to variants in this family.

Forecasted Missions

Upcoming mission rows with announced launch timing.

MissionVariantAnnounced

No forecasted missions

No upcoming announced mission rows are linked to this vehicle family.

Variants

Canonical variants rolled up into this launch vehicle family.

VariantStagesMissionsStatus
Maia
Not stated0Development
YearLocationLaunchesConfidenceBasis
2026Guiana Space Centre420%Editable low-confidence MaiaSpace early cadence fallback. Site mapping: MaiaSpace is tied to Guiana Space Centre/former Soyuz facility planning; keep existing ...
2027Guiana Space Centre420%Editable low-confidence MaiaSpace early cadence fallback. Site mapping: MaiaSpace is tied to Guiana Space Centre/former Soyuz facility planning; keep existing ...
2028Guiana Space Centre420%Editable low-confidence MaiaSpace early cadence fallback. Site mapping: MaiaSpace is tied to Guiana Space Centre/former Soyuz facility planning; keep existing ...
2029Guiana Space Centre420%Editable low-confidence MaiaSpace early cadence fallback. Site mapping: MaiaSpace is tied to Guiana Space Centre/former Soyuz facility planning; keep existing ...
2030Guiana Space Centre420%Editable low-confidence MaiaSpace early cadence fallback. Site mapping: MaiaSpace is tied to Guiana Space Centre/former Soyuz facility planning; keep existing ...
2031Guiana Space Centre420%Editable low-confidence MaiaSpace early cadence fallback. Site mapping: MaiaSpace is tied to Guiana Space Centre/former Soyuz facility planning; keep existing ...
2032Guiana Space Centre420%Editable low-confidence MaiaSpace early cadence fallback. Site mapping: MaiaSpace is tied to Guiana Space Centre/former Soyuz facility planning; keep existing ...
2033Guiana Space Centre420%Editable low-confidence MaiaSpace early cadence fallback. Site mapping: MaiaSpace is tied to Guiana Space Centre/former Soyuz facility planning; keep existing ...
2034Guiana Space Centre420%Editable low-confidence MaiaSpace early cadence fallback. Site mapping: MaiaSpace is tied to Guiana Space Centre/former Soyuz facility planning; keep existing ...
2035Guiana Space Centre420%Editable low-confidence MaiaSpace early cadence fallback. Site mapping: MaiaSpace is tied to Guiana Space Centre/former Soyuz facility planning; keep existing ...
2036Guiana Space Centre420%Editable low-confidence MaiaSpace early cadence fallback. Site mapping: MaiaSpace is tied to Guiana Space Centre/former Soyuz facility planning; keep existing ...
2037Guiana Space Centre420%Editable low-confidence MaiaSpace early cadence fallback. Site mapping: MaiaSpace is tied to Guiana Space Centre/former Soyuz facility planning; keep existing ...
2038Guiana Space Centre420%Editable low-confidence MaiaSpace early cadence fallback. Site mapping: MaiaSpace is tied to Guiana Space Centre/former Soyuz facility planning; keep existing ...
2039Guiana Space Centre420%Editable low-confidence MaiaSpace early cadence fallback. Site mapping: MaiaSpace is tied to Guiana Space Centre/former Soyuz facility planning; keep existing ...
2040Guiana Space Centre420%Editable low-confidence MaiaSpace early cadence fallback. Site mapping: MaiaSpace is tied to Guiana Space Centre/former Soyuz facility planning; keep existing ...
2041Guiana Space Centre420%Editable low-confidence MaiaSpace early cadence fallback. Site mapping: MaiaSpace is tied to Guiana Space Centre/former Soyuz facility planning; keep existing ...
Guiana Space Centre
2026 · 20% confidence
4

Editable low-confidence MaiaSpace early cadence fallback. Site mapping: MaiaSpace is tied to Guiana Space Centre/former Soyuz facility planning; keep existing development-ramp qua...

Guiana Space Centre
2027 · 20% confidence
4

Editable low-confidence MaiaSpace early cadence fallback. Site mapping: MaiaSpace is tied to Guiana Space Centre/former Soyuz facility planning; keep existing development-ramp qua...

Guiana Space Centre
2028 · 20% confidence
4

Editable low-confidence MaiaSpace early cadence fallback. Site mapping: MaiaSpace is tied to Guiana Space Centre/former Soyuz facility planning; keep existing development-ramp qua...

Guiana Space Centre
2029 · 20% confidence
4

Editable low-confidence MaiaSpace early cadence fallback. Site mapping: MaiaSpace is tied to Guiana Space Centre/former Soyuz facility planning; keep existing development-ramp qua...

Guiana Space Centre
2030 · 20% confidence
4

Editable low-confidence MaiaSpace early cadence fallback. Site mapping: MaiaSpace is tied to Guiana Space Centre/former Soyuz facility planning; keep existing development-ramp qua...

Guiana Space Centre
2031 · 20% confidence
4

Editable low-confidence MaiaSpace early cadence fallback. Site mapping: MaiaSpace is tied to Guiana Space Centre/former Soyuz facility planning; keep existing development-ramp qua...

Guiana Space Centre
2032 · 20% confidence
4

Editable low-confidence MaiaSpace early cadence fallback. Site mapping: MaiaSpace is tied to Guiana Space Centre/former Soyuz facility planning; keep existing development-ramp qua...

Guiana Space Centre
2033 · 20% confidence
4

Editable low-confidence MaiaSpace early cadence fallback. Site mapping: MaiaSpace is tied to Guiana Space Centre/former Soyuz facility planning; keep existing development-ramp qua...

Guiana Space Centre
2034 · 20% confidence
4

Editable low-confidence MaiaSpace early cadence fallback. Site mapping: MaiaSpace is tied to Guiana Space Centre/former Soyuz facility planning; keep existing development-ramp qua...

Guiana Space Centre
2035 · 20% confidence
4

Editable low-confidence MaiaSpace early cadence fallback. Site mapping: MaiaSpace is tied to Guiana Space Centre/former Soyuz facility planning; keep existing development-ramp qua...

Guiana Space Centre
2036 · 20% confidence
4

Editable low-confidence MaiaSpace early cadence fallback. Site mapping: MaiaSpace is tied to Guiana Space Centre/former Soyuz facility planning; keep existing development-ramp qua...

Guiana Space Centre
2037 · 20% confidence
4

Editable low-confidence MaiaSpace early cadence fallback. Site mapping: MaiaSpace is tied to Guiana Space Centre/former Soyuz facility planning; keep existing development-ramp qua...

Maia
LEO
500 kg
Unknown
Unknown
MaiaSpace Launcher
Maia
SSO500 kg500 kmUnknownMaiaSpace Launcher
Track
Mentions
66
All verified mentions of this launch vehicle family in source documents.
0.0-5.0
Actions

General Atomics was responsible for launching the MAIA-hosting satellite and in February 2021 awarded a contract to Firefly Aerospace for a launch on Firefly’s Alpha rocket.

RelationshipsPlanValue 4.0Aug 6, 2022Italian satellite may fly NASA Earth science payload
Page4of4

NASA awarded a $38,500,000 contract to General Atomics Electromagnetic Systems in 2018 to host MAIA on the OTB-2 spacecraft.

RelationshipsFinancialCapabilityValue 5.0Aug 6, 2022Italian satellite may fly NASA Earth science payload

General Atomics Electromagnetic Systems selected Firefly Aerospace to launch MAIA on its Alpha rocket in 2022.

RelationshipsPlanValue 4.0Jan 25, 2022NASA hosted payloads waiting for rides to orbit

In 2018 NASA awarded a contract to General Atomics for hosting services for MAIA, including satellite integration and testing.

RelationshipsCapabilityValue 4.5Jan 25, 2022NASA hosted payloads waiting for rides to orbit

General Atomics won a $38,500,000 NASA contract in August 2018 to fly the MAIA instrument, a total that included both the spacecraft and launch services.

RelationshipsFinancialCapabilityPlanValue 4.8Feb 22, 2021General Atomics selects Firefly to launch NASA Earth science instrument

NASA awarded General Atomics $38,500,000 in 2018 to send the Multi-Angle Imager for Aerosols (MAIA), an instrument developed by JPL, into orbit on Orbital Test Bed-2.

RelationshipsFinancialPlanCapabilityValue 5.0Aug 3, 2020NASA taps General Atomics to build solar irradiance satellite