Family-level launch record combining canonical variants, historical missions, public cadence forecasts, and available payload performance specs.
Historical missions are grouped by actual launch year. Forecast cadence uses family-level launch-rate rows.
| Year | Historical missions | Forecast launches |
|---|---|---|
| 2026 | 0 | 1 |
| 2027 | 0 | 2 |
| 2028 | 0 | 3 |
| 2029 | 0 | 4 |
| 2030 | 0 | 4 |
| 2031 | 0 | 4 |
| 2032 | 0 | 5 |
| 2033 | 0 | 5 |
| 2034 | 0 | 5 |
| 2035 | 0 | 6 |
| 2036 | 0 | 6 |
| 2037 | 0 | 6 |
| 2038 | 0 | 6 |
| 2039 | 0 | 6 |
| 2040 | 0 | 6 |
| 2041 | 0 | 6 |
1 launch location represented.
Payload capacity by variant and target orbit when structured capacity rows are available.
| Variant | Orbit | Capacity | Altitude | Inclination | Source |
|---|---|---|---|---|---|
Nova | LEO | 7,000 kg | Unknown | Unknown | Stoke Space Nova |
Nova | LEO | 3,000 kg | Unknown | Unknown | Stoke Space Nova |
Latest launched missions using variants in this family.
| Mission | Variant | Launch |
|---|---|---|
No recent missionsNo launched missions are linked to variants in this family. | ||
Upcoming mission rows with announced launch timing.
| Mission | Variant | Announced |
|---|---|---|
No forecasted missionsNo upcoming announced mission rows are linked to this vehicle family. | ||
Canonical variants rolled up into this launch vehicle family.
| Variant | Stages | Missions | Status |
|---|---|---|---|
Nova | Not stated | 0 | Development |
| Year | Location | Launches | Confidence | Basis |
|---|---|---|---|---|
| 2026 | Cape Canaveral Space Force Station | SLC-14 | 1 | 25% | Conservative startup-ramp annual family throughput default: Nova is development-stage; early regulatory material supports phased low-cadence expendable operati... |
| 2027 | Cape Canaveral Space Force Station | SLC-14 | 2 | 25% | Conservative startup-ramp annual family throughput default: Nova is development-stage; early regulatory material supports phased low-cadence expendable operati... |
| 2028 | Cape Canaveral Space Force Station | SLC-14 | 3 | 25% | Conservative startup-ramp annual family throughput default: Nova is development-stage; early regulatory material supports phased low-cadence expendable operati... |
| 2029 | Cape Canaveral Space Force Station | SLC-14 | 4 | 20% | Conservative startup-ramp annual family throughput default: Nova is development-stage; early regulatory material supports phased low-cadence expendable operati... |
| 2030 | Cape Canaveral Space Force Station | SLC-14 | 4 | 20% | Conservative startup-ramp annual family throughput default: Nova is development-stage; early regulatory material supports phased low-cadence expendable operati... |
| 2031 | Cape Canaveral Space Force Station | SLC-14 | 4 | 20% | Conservative startup-ramp annual family throughput default: Nova is development-stage; early regulatory material supports phased low-cadence expendable operati... |
| 2032 | Cape Canaveral Space Force Station | SLC-14 | 5 | 20% | Conservative startup-ramp annual family throughput default: Nova is development-stage; early regulatory material supports phased low-cadence expendable operati... |
| 2033 | Cape Canaveral Space Force Station | SLC-14 | 5 | 20% | Conservative startup-ramp annual family throughput default: Nova is development-stage; early regulatory material supports phased low-cadence expendable operati... |
| 2034 | Cape Canaveral Space Force Station | SLC-14 | 5 | 20% | Conservative startup-ramp annual family throughput default: Nova is development-stage; early regulatory material supports phased low-cadence expendable operati... |
| 2035 | Cape Canaveral Space Force Station | SLC-14 | 6 | 20% | Conservative startup-ramp annual family throughput default: Nova is development-stage; early regulatory material supports phased low-cadence expendable operati... |
| 2036 | Cape Canaveral Space Force Station | SLC-14 | 6 | 20% | Conservative startup-ramp annual family throughput default: Nova is development-stage; early regulatory material supports phased low-cadence expendable operati... |
| 2037 | Cape Canaveral Space Force Station | SLC-14 | 6 | 20% | Conservative startup-ramp annual family throughput default: Nova is development-stage; early regulatory material supports phased low-cadence expendable operati... |
| 2038 | Cape Canaveral Space Force Station | SLC-14 | 6 | 20% | Conservative startup-ramp annual family throughput default: Nova is development-stage; early regulatory material supports phased low-cadence expendable operati... |
| 2039 | Cape Canaveral Space Force Station | SLC-14 | 6 | 20% | Conservative startup-ramp annual family throughput default: Nova is development-stage; early regulatory material supports phased low-cadence expendable operati... |
| 2040 | Cape Canaveral Space Force Station | SLC-14 | 6 | 20% | Conservative startup-ramp annual family throughput default: Nova is development-stage; early regulatory material supports phased low-cadence expendable operati... |
| 2041 | Cape Canaveral Space Force Station | SLC-14 | 6 | 20% | Conservative startup-ramp annual family throughput default: Nova is development-stage; early regulatory material supports phased low-cadence expendable operati... |
Conservative startup-ramp annual family throughput default: Nova is development-stage; early regulatory material supports phased low-cadence expendable operations before reuse. Si...
Conservative startup-ramp annual family throughput default: Nova is development-stage; early regulatory material supports phased low-cadence expendable operations before reuse. Si...
Conservative startup-ramp annual family throughput default: Nova is development-stage; early regulatory material supports phased low-cadence expendable operations before reuse. Si...
Conservative startup-ramp annual family throughput default: Nova is development-stage; early regulatory material supports phased low-cadence expendable operations before reuse. Si...
Conservative startup-ramp annual family throughput default: Nova is development-stage; early regulatory material supports phased low-cadence expendable operations before reuse. Si...
Conservative startup-ramp annual family throughput default: Nova is development-stage; early regulatory material supports phased low-cadence expendable operations before reuse. Si...
Conservative startup-ramp annual family throughput default: Nova is development-stage; early regulatory material supports phased low-cadence expendable operations before reuse. Si...
Conservative startup-ramp annual family throughput default: Nova is development-stage; early regulatory material supports phased low-cadence expendable operations before reuse. Si...
Conservative startup-ramp annual family throughput default: Nova is development-stage; early regulatory material supports phased low-cadence expendable operations before reuse. Si...
Conservative startup-ramp annual family throughput default: Nova is development-stage; early regulatory material supports phased low-cadence expendable operations before reuse. Si...
Conservative startup-ramp annual family throughput default: Nova is development-stage; early regulatory material supports phased low-cadence expendable operations before reuse. Si...
Conservative startup-ramp annual family throughput default: Nova is development-stage; early regulatory material supports phased low-cadence expendable operations before reuse. Si...
| GTO |
| 2,500 kg |
| Unknown |
| Unknown |
| Stoke Space Nova |
Nova | TLI | 1,250 kg | Unknown | Unknown | Stoke Space Nova |
Nova | escape | 800 kg | Unknown | Unknown | Stoke Space Nova |
Nova Poshta and UAVita's next autonomous parcel delivery test flight is scheduled for late August between Kyiv and L’viv.
Nova Poshta is a private Ukrainian postal and courier company that leads the logistics market in Ukraine.
Cepton unveiled the Nova miniature LiDAR sensor with a wide field of view prior to dSPACE delivering simulation solutions for that sensor.
Micro-Nova is scheduled to launch with the second Nova-C lander to the lunar south pole in December 2022.
Intuitive Machines’ first Nova-C lander launch slipped from July to October 2021 and was later delayed to no earlier than the first quarter of 2022 in an April FCC license application citing launch-provider-related issues.
The LTN together with Intuitive Machines’ control center, Nova Control, is offered as a complete service to commercial or government partners operating in cislunar space.
V-Nova’s SMPTE VC-6 ST 2117 data coding standard will be integrated into Unibap’s SpaceCloud computing platform onboard a satellite scheduled for launch in 2021-04-01.
V-Nova’s VC-6 technology will be deployed into Unibap’s SpaceCloud solution and integrated into D-Orbit’s ION SCV Dauntless David spacecraft scheduled for launch in June 2021.
V-Nova’s VC-6 technology will be deployed into Unibap’s SpaceCloud solution and integrated into D-Orbit’s ION SCV Dauntless David spacecraft scheduled for launch in June 2021.
V-Nova’s SMPTE VC-6 ST 2117 data coding standard is collaborating with D-Orbit and Unibap to demonstrate next-generation hyper-spectral imaging from polar orbit.
V-Nova’s VC-6 high-performance AI-powered software library will be integrated into Unibap’s SpaceCloud computing platform onboard a satellite scheduled for launch in 2021-04-01.
Dr. Tim Crain developed the framework for Intuitive Machines' approach to Precision Landing and Hazard Avoidance (PLHA) on Nova landers.
Dr. Tim Crain implemented the original sensor processing and navigation flight software for the Nova-C vehicle.
The Nova-C vehicle is scheduled to attempt two landings on the Moon in the next 20 months.
Geoplex, part of the Nova Group, developed the National Freight Data Hub as a national interactive tool for Australia’s freight system.
WILD RIDE will demonstrate a range of AI/ML applications using Nebula, including experiments featuring video compression techniques from V-Nova.
Intuitive Machines planned to launch its Nova-C lander on the IM-1 mission on a SpaceX Falcon 9.
The Nova-C spacecraft will launch into a supersynchronous transfer orbit of 185 by 60,0 m.
Both Intuitive Machines’ IM-1 and IM-2 missions will use the Nova-C lander design.
Spacebit plans to send a wheeled rover to the moon in 2021 on Intuitive Machines’ Nova-C lander.