Family-level launch record combining canonical variants, historical missions, public cadence forecasts, and available payload performance specs.
Historical missions are grouped by actual launch year. Forecast cadence uses family-level launch-rate rows.
| Year | Historical missions | Forecast launches |
|---|---|---|
| 2019 | 5 | 0 |
| 2020 | 2 | 0 |
| 2021 | 1 | 0 |
| 2022 | 3 | 0 |
| 2023 | 3 | 0 |
| 2024 | 3 | 0 |
| 2025 | 1 | 0 |
| 2026 | 1 | 8 |
| 2027 | 0 | 8 |
| 2028 | 0 | 8 |
| 2029 | 0 | 8 |
| 2030 | 0 | 8 |
| 2031 | 0 | 8 |
| 2032 | 0 | 8 |
| 2033 | 0 | 8 |
| 2034 | 0 | 8 |
| 2035 | 0 | 8 |
Payload capacity by variant and target orbit when structured capacity rows are available.
| Variant | Orbit | Capacity | Altitude | Inclination | Source |
|---|---|---|---|---|---|
PSLV-XL | LEO | 3,800 kg | 200 km | 30 deg | Gunter Krebs / Skyrocket PSLV-XL profile |
PSLV-DL | LEO | 3,800 kg | Unknown | Unknown | Space Launch Schedule PSLV-DL vehicle page |
Latest launched missions using variants in this family.
| Mission | Variant | Launch |
|---|---|---|
| Launch 2026-F01 | PSLV-DL | Jan 12, 2026 |
| Launch 2025-F05 | PSLV-XL | May 18, 2025 |
| SPADEX | PSLV CA | Dec 30, 2024 |
| PROBA-3 |
Canonical variants rolled up into this launch vehicle family.
| Variant | Stages | Missions | Status |
|---|---|---|---|
PSLV | Not stated | 3 | Retired |
PSLV C | Not stated | 9 | Retired |
PSLV CA | Not stated | 18 | Active |
PSLV-DL | Not stated | 5 | Active |
| 2036 | 0 | 8 |
| 2037 | 0 | 8 |
| 2038 | 0 | 8 |
| 2039 | 0 | 8 |
| 2040 | 0 | 8 |
| 2041 | 0 | 8 |
1 launch location represented.
| Year | Location | Launches | Confidence | Basis |
|---|---|---|---|---|
| 2026 | Satish Dhawan Space Centre | PSLV launch pads | 8 | 25% | Editable low-confidence annual throughput seed. |
| 2027 | Satish Dhawan Space Centre | PSLV launch pads | 8 | 25% | Editable low-confidence annual throughput seed. |
| 2028 | Satish Dhawan Space Centre | PSLV launch pads | 8 | 25% | Editable low-confidence annual throughput seed. |
| 2029 | Satish Dhawan Space Centre | PSLV launch pads | 8 | 25% | Editable low-confidence annual throughput seed. |
| 2030 | Satish Dhawan Space Centre | PSLV launch pads | 8 | 25% | Editable low-confidence annual throughput seed. |
| 2031 | Satish Dhawan Space Centre | PSLV launch pads | 8 | 25% | Editable low-confidence annual throughput seed. |
| 2032 | Satish Dhawan Space Centre | PSLV launch pads | 8 | 25% | Editable low-confidence annual throughput seed. |
| 2033 | Satish Dhawan Space Centre | PSLV launch pads | 8 | 25% | Editable low-confidence annual throughput seed. |
| 2034 | Satish Dhawan Space Centre | PSLV launch pads | 8 | 25% | Editable low-confidence annual throughput seed. |
| 2035 | Satish Dhawan Space Centre | PSLV launch pads | 8 | 25% | Editable low-confidence annual throughput seed. |
| 2036 | Satish Dhawan Space Centre | PSLV launch pads | 8 | 25% | Editable low-confidence annual throughput seed. |
| 2037 | Satish Dhawan Space Centre | PSLV launch pads | 8 | 25% | Editable low-confidence annual throughput seed. |
| 2038 | Satish Dhawan Space Centre | PSLV launch pads | 8 | 25% | Editable low-confidence annual throughput seed. |
| 2039 | Satish Dhawan Space Centre | PSLV launch pads | 8 | 25% | Editable low-confidence annual throughput seed. |
| 2040 | Satish Dhawan Space Centre | PSLV launch pads | 8 | 25% | Editable low-confidence annual throughput seed. |
| 2041 | Satish Dhawan Space Centre | PSLV launch pads | 8 | 25% | Editable low-confidence annual throughput seed. Site-year coverage backfill copied nearest prior site-rate row. |
Editable low-confidence annual throughput seed.
Editable low-confidence annual throughput seed.
Editable low-confidence annual throughput seed.
Editable low-confidence annual throughput seed.
Editable low-confidence annual throughput seed.
Editable low-confidence annual throughput seed.
PSLV CA | LEO | 3,800 kg | Unknown | Unknown | Space Launch Now PSLV-CA vehicle page |
PSLV-DL | SSO | 1,750 kg | 600 km | Unknown | ISRO PSLV page and Space Launch Schedule PSLV-DL vehicle page |
PSLV | SSO | 1,750 kg | 600 km | Unknown | ISRO PSLV page |
PSLV-XL | SSO | 1,750 kg | 600 km | Unknown | ISRO PSLV page |
PSLV-XL | GTO | 1,425 kg | Unknown | Unknown | ISRO PSLV page |
PSLV | GTO | 1,425 kg | Unknown | Unknown | ISRO PSLV page |
PSLV-XL | GTO | 1,300 kg | Unknown | Unknown | Gunter Krebs / Skyrocket PSLV-XL profile |
PSLV-DL | GTO | 1,200 kg | Unknown | Unknown | Space Launch Schedule PSLV-DL vehicle page |
PSLV CA | GTO | 1,200 kg | Unknown | Unknown | Space Launch Now PSLV-CA vehicle page |
PSLV CA | SSO | 1,092 kg | 622 km | Unknown | Space Launch Now PSLV-CA vehicle page |
PSLV-XL |
| Dec 5, 2024 |
| XPoSAT Mission | PSLV-DL | Jan 1, 2024 |
| Aditya-L1 Mission | PSLV-XL | Sep 2, 2023 |
| DS-SAR Mission | PSLV CA | Jul 30, 2023 |
| TeLEOS-2 | PSLV CA | Apr 22, 2023 |
Upcoming mission rows with announced launch timing.
| Mission | Variant | Announced |
|---|---|---|
No forecasted missionsNo upcoming announced mission rows are linked to this vehicle family. | ||
PSLV-QL | Not stated | 2 | Retired |
PSLV-XL | Not stated | 27 | Active |
Editable low-confidence annual throughput seed.
Editable low-confidence annual throughput seed.
Editable low-confidence annual throughput seed.
Editable low-confidence annual throughput seed.
Editable low-confidence annual throughput seed.
Editable low-confidence annual throughput seed.
The anomaly during the third stage caused a deviation from the planned trajectory of the PSLV-C62 mission.
ISRO is actively investigating the failure of the PSLV-C62 mission.
The separation of KID from PSLV is theorized to have been triggered by thermal conditions while falling back to Earth coupled with PSLV stage 4.
ISRO has not yet commented on the potential impact of the PSLV-C62 anomaly on future launch schedules.
ISRO has initiated a detailed analysis of the anomaly encountered during the PSLV-C62 mission.
PSLV-C62 launches the EOS-N1 Mission from SDSC-SHAR in Sriharikota.
ISRO's PSLV-C62 lifted off with 15 satellites at 04:48 UTC.
The PSLV-C62 mission encountered an anomaly during the end of the PS3 stage.
ISRO will conduct the PSLV-C62 / EOS-N1 mission on January 12, 2026.
The PSLV-C61 EOS-09 mission failed due to a third-stage anomaly.
ISRO's PSLV-C62 failed to deliver the payloads to orbit due to a third-stage anomaly.
The previous PSLV failure involved the third stage of the rocket.
India's PSLV-C62 mission failed during the 3rd stage burn.
The PSLV-C62 mission encountered an anomaly during the end of the PS3 stage.
Liftoff for the PSLV-C62 / EOS-N1 mission is scheduled at 10:18:30 IST.
ISRO's PSLV-C62 launched the EOS-N1 mission from the First Launch Pad at Satish Dhawan Space Centre, Sriharikota on January 12, 2026.
The PSLV-C62 mission is the 2nd consecutive failed mission for PSLV.
ISRO has initiated a detailed analysis of the anomaly encountered during the PSLV-C62 mission.
PSLV-C62 is the 64th flight of the PSLV rocket.
PSLV-C62 will carry EOS-N1 and 15 co-passenger satellites.