Polaris Intelligence
Polaris
Intelligence
About
Ctrl K
Sign in
© Polaris Intelligence 2026
PrivacyTermsAdmin
Launch Vehicles
Vehicle family profile

PSLV

Family-level launch record combining canonical variants, historical missions, public cadence forecasts, and available payload performance specs.

Indian Space Research Organization (ISRO)Active
Admin
Variants
6
Canonical variants linked to this family.
Historical missions
64
Missions in the public mission table with actual launch dates.
Peak listed capacity
3,800 kg
Maximum payload capacity across listed variants and orbits.

Launch Cadence

Historical missions are grouped by actual launch year. Forecast cadence uses family-level launch-rate rows.

YearHistorical missionsForecast launches
201950
202020
202110
202230
202330
202430
202510
202618
202708
202808
202908
203008
203108
203208
203308
203408
203508

Performance Specs

Payload capacity by variant and target orbit when structured capacity rows are available.

VariantOrbitCapacityAltitudeInclinationSource
PSLV-XL
LEO3,800 kg200 km30 degGunter Krebs / Skyrocket PSLV-XL profile
PSLV-DL
LEO3,800 kgUnknownUnknownSpace Launch Schedule PSLV-DL vehicle page

Recent Missions

Latest launched missions using variants in this family.

MissionVariantLaunch
Launch 2026-F01
PSLV-DL
Jan 12, 2026
Launch 2025-F05
PSLV-XL
May 18, 2025
SPADEX
PSLV CA
Dec 30, 2024
PROBA-3

Variants

Canonical variants rolled up into this launch vehicle family.

VariantStagesMissionsStatus
PSLV
Not stated3Retired
PSLV C
Not stated9Retired
PSLV CA
Not stated18Active
PSLV-DL
Not stated5Active
203608
203708
203808
203908
204008
204108

Forecast Location Split

1 launch location represented.

YearLocationLaunchesConfidenceBasis
2026Satish Dhawan Space Centre | PSLV launch pads825%Editable low-confidence annual throughput seed.
2027Satish Dhawan Space Centre | PSLV launch pads825%Editable low-confidence annual throughput seed.
2028Satish Dhawan Space Centre | PSLV launch pads825%Editable low-confidence annual throughput seed.
2029Satish Dhawan Space Centre | PSLV launch pads825%Editable low-confidence annual throughput seed.
2030Satish Dhawan Space Centre | PSLV launch pads825%Editable low-confidence annual throughput seed.
2031Satish Dhawan Space Centre | PSLV launch pads825%Editable low-confidence annual throughput seed.
2032Satish Dhawan Space Centre | PSLV launch pads825%Editable low-confidence annual throughput seed.
2033Satish Dhawan Space Centre | PSLV launch pads825%Editable low-confidence annual throughput seed.
2034Satish Dhawan Space Centre | PSLV launch pads825%Editable low-confidence annual throughput seed.
2035Satish Dhawan Space Centre | PSLV launch pads825%Editable low-confidence annual throughput seed.
2036Satish Dhawan Space Centre | PSLV launch pads825%Editable low-confidence annual throughput seed.
2037Satish Dhawan Space Centre | PSLV launch pads825%Editable low-confidence annual throughput seed.
2038Satish Dhawan Space Centre | PSLV launch pads825%Editable low-confidence annual throughput seed.
2039Satish Dhawan Space Centre | PSLV launch pads825%Editable low-confidence annual throughput seed.
2040Satish Dhawan Space Centre | PSLV launch pads825%Editable low-confidence annual throughput seed.
2041Satish Dhawan Space Centre | PSLV launch pads825%Editable low-confidence annual throughput seed. Site-year coverage backfill copied nearest prior site-rate row.
Satish Dhawan Space Centre | PSLV launch pads
2026 · 25% confidence
8

Editable low-confidence annual throughput seed.

Satish Dhawan Space Centre | PSLV launch pads
2027 · 25% confidence
8

Editable low-confidence annual throughput seed.

Satish Dhawan Space Centre | PSLV launch pads
2028 · 25% confidence
8

Editable low-confidence annual throughput seed.

Satish Dhawan Space Centre | PSLV launch pads
2029 · 25% confidence
8

Editable low-confidence annual throughput seed.

Satish Dhawan Space Centre | PSLV launch pads
2030 · 25% confidence
8

Editable low-confidence annual throughput seed.

Satish Dhawan Space Centre | PSLV launch pads
2031 · 25% confidence
8

Editable low-confidence annual throughput seed.

PSLV CA
LEO3,800 kgUnknownUnknownSpace Launch Now PSLV-CA vehicle page
PSLV-DL
SSO1,750 kg600 kmUnknownISRO PSLV page and Space Launch Schedule PSLV-DL vehicle page
PSLV
SSO1,750 kg600 kmUnknownISRO PSLV page
PSLV-XL
SSO1,750 kg600 kmUnknownISRO PSLV page
PSLV-XL
GTO1,425 kgUnknownUnknownISRO PSLV page
PSLV
GTO1,425 kgUnknownUnknownISRO PSLV page
PSLV-XL
GTO1,300 kgUnknownUnknownGunter Krebs / Skyrocket PSLV-XL profile
PSLV-DL
GTO1,200 kgUnknownUnknownSpace Launch Schedule PSLV-DL vehicle page
PSLV CA
GTO1,200 kgUnknownUnknownSpace Launch Now PSLV-CA vehicle page
PSLV CA
SSO1,092 kg622 kmUnknownSpace Launch Now PSLV-CA vehicle page
PSLV-XL
Dec 5, 2024
XPoSAT Mission
PSLV-DL
Jan 1, 2024
Aditya-L1 Mission
PSLV-XL
Sep 2, 2023
DS-SAR Mission
PSLV CA
Jul 30, 2023
TeLEOS-2
PSLV CA
Apr 22, 2023

Forecasted Missions

Upcoming mission rows with announced launch timing.

MissionVariantAnnounced

No forecasted missions

No upcoming announced mission rows are linked to this vehicle family.

PSLV-QL
Not stated2Retired
PSLV-XL
Not stated27Active
Track
Satish Dhawan Space Centre | PSLV launch pads
2032 · 25% confidence
8

Editable low-confidence annual throughput seed.

Satish Dhawan Space Centre | PSLV launch pads
2033 · 25% confidence
8

Editable low-confidence annual throughput seed.

Satish Dhawan Space Centre | PSLV launch pads
2034 · 25% confidence
8

Editable low-confidence annual throughput seed.

Satish Dhawan Space Centre | PSLV launch pads
2035 · 25% confidence
8

Editable low-confidence annual throughput seed.

Satish Dhawan Space Centre | PSLV launch pads
2036 · 25% confidence
8

Editable low-confidence annual throughput seed.

Satish Dhawan Space Centre | PSLV launch pads
2037 · 25% confidence
8

Editable low-confidence annual throughput seed.

Mentions
378
All verified mentions of this launch vehicle family in source documents.
0.0-5.0
Actions

PSLV's payload fairing was jettisoned as planned at the end of its second-stage engine burn.

PlanValue 4.0Jan 13, 2026Exclusive: Orbital Paradigm Emerges as the Lone Survivor of Failed PSLV Launch

The PSLV-C62 rocket launched at 10:17 local time from the Satish Dhawan Space Centre.

Plan
Page5of19
Value 4.0
Jan 13, 2026
India fracasa en el lanzamiento del cohete PSLV con un prototipo de la española Orbital Paradigm

Orbital Paradigm didn't have enough time to collect and transmit all payload data before the PSLV mission ended.

GeneralValue 2.0Jan 13, 2026Exclusive: Orbital Paradigm Emerges as the Lone Survivor of Failed PSLV Launch

Orbital Paradigm's Kestrel Initial Demonstrator (KID) survived the PSLV mishap and transmitted reentry data before crash-landing on Earth.

CapabilityGeneralValue 3.5Jan 13, 2026Exclusive: Orbital Paradigm Emerges as the Lone Survivor of Failed PSLV Launch

The KID capsule separated from PSLV C62.

PlanCapabilityValue 3.8Jan 13, 2026Wow.

ISRO plans to review the schedule for upcoming PSLV missions in light of the launch failure.

PlanGeneralGovernanceValue 2.0Jan 13, 2026インドの国産ロケット「PSLV」が打ち上げ失敗–昨年5月から2回連続で

ISRO reported that the PSLV-C62 performed normally during the initial phases of flight before experiencing an anomaly during the third stage.

GeneralValue 4.0Jan 13, 2026All payloads lost on Polar Satellite Launch

Operations of the PSLV will proceed cautiously until the cause of the recent failure is identified and safety is confirmed.

PlanCapabilityValue 2.5Jan 13, 2026インドの国産ロケット「PSLV」が打ち上げ失敗–昨年5月から2回連続で

The PSLV has a high success rate and is a main launch vehicle for ISRO.

CapabilityGeneralValue 2.5Jan 13, 2026インドの国産ロケット「PSLV」が打ち上げ失敗–昨年5月から2回連続で

The KID spacecraft generated useful data during the failed PSLV launch according to OrbitalParadigm.

CapabilityGeneralValue 3.2Jan 13, 2026And it held up well too:

The PSLV-C62 mission marked the second consecutive failure, following a previous failure in May 2025.

GeneralPlanValue 2.0Jan 13, 2026インドの国産ロケット「PSLV」が打ち上げ失敗–昨年5月から2回連続で

ISRO’s Polar Satellite Launch Vehicle (PSLV) suffered an anomaly six minutes after launch, causing the rocket to tumble at the end of the third stage engine burn.

GeneralValue 4.0Jan 13, 2026Exclusive: Orbital Paradigm Emerges as the Lone Survivor of Failed PSLV Launch

Analysis has been initiated to determine the cause of the PSLV-C62 mission failure.

LegalValue 1.0Jan 13, 2026インドの国産ロケット「PSLV」が打ち上げ失敗–昨年5月から2回連続で

The Indian Space Research Organisation (ISRO) experienced a launch failure of the Polar Satellite Launch Vehicle (PSLV) on January 12.

PlanGeneralValue 2.5Jan 13, 2026インドの国産ロケット「PSLV」が打ち上げ失敗–昨年5月から2回連続で

The Indian Space Research Organisation (ISRO) reported a performance deviation during the third stage of the PSLV-C62 launch.

CapabilityPlanValue 3.2Jan 13, 2026India fracasa en el lanzamiento del cohete PSLV con un prototipo de la española Orbital Paradigm

An anomaly was encountered during the end of the PS3 stage in the PSLV-C62 mission.

PlanGeneralValue 2.0Jan 13, 2026インドの国産ロケット「PSLV」が打ち上げ失敗–昨年5月から2回連続で

This incident marks the second consecutive failure of the PSLV rocket in less than a year.

CapabilityPlanValue 1.8Jan 13, 2026India fracasa en el lanzamiento del cohete PSLV con un prototipo de la española Orbital Paradigm

A detailed analysis of flight data is underway to determine the cause of the PSLV-C62 mission failure.

GeneralValue 2.0Jan 13, 2026All payloads lost on Polar Satellite Launch

A technical failure in the third stage of the PSLV-C62 rocket prevented the payloads from being placed into orbit.

GeneralCapabilityPlanValue 3.7Jan 13, 2026India fracasa en el lanzamiento del cohete PSLV con un prototipo de la española Orbital Paradigm

The PSLV-C62 mission failed to reach the intended orbit, resulting in the satellite becoming inoperable.

GeneralValue 4.0Jan 13, 2026インドの国産ロケット「PSLV」が打ち上げ失敗–昨年5月から2回連続で