Browse the latest facts and intelligence extracted from space industry sources.
| Information | Article | Published |
|---|---|---|
Browse the latest facts and intelligence extracted from space industry sources.
total items
| Information | Article | Published |
|---|---|---|
Progress MS-33 has one Kurs antenna that failed to deploy after launch and was to be inspected during the EVA. CapabilityPlanValue 4.0 | Jun 3, 2026 |
The EVA was expected to last about 5 hours and 27 minutes and end at about 22:45 Moscow Time on June 3, 2026. PlanValue 2.5 | Jun 3, 2026 |
Sergey Mikaev was outside the Poisk module during an EVA on June 3, 2026. GeneralValue 2.6 | Jun 3, 2026 |
The LINK spacecraft is expected to launch from the Marshall Islands in the last week of June. PlanValue 4.0 | Jun 3, 2026 |
Katalyst's LINK spacecraft has left its factory and is heading to Wallops for integration onto Northrop's Pegasus rocket. PlanRelationshipsValue 4.0 | Jun 3, 2026 |
Axelspace’s expanded partnership with Kongsberg Satellite Services is intended to support future growth in environmental monitoring, disaster response, and maritime applications. RelationshipsGrowthGeneralValue 3.8 | Jun 3, 2026 |
Axelspace will continue to use KSATlite, Kongsberg Satellite Services’ fully automated Ground Segment-as-a-Service for small satellites and mega-constellations. CapabilityRelationshipsValue 4.0 | Jun 3, 2026 |
Axelspace’s GRUS-3 mission will build out the company’s next-generation Earth observation microsatellite constellation. PlanCapabilityGrowthValue 3.5 | Jun 3, 2026 |
Yuya Nakamura is the President and CEO of Axelspace. GovernanceValue 4.0 | Jun 3, 2026 |
The Axelspace and Kongsberg Satellite Services collaboration is aligned with ground segment cloudification and IT convergence in the commercial space sector. RelationshipsCapabilityValue 2.2 | Jun 3, 2026 |
Axelspace’s GRUS-3 Low Earth Orbit mission is scheduled to launch no earlier than July 2026. PlanValue 4.3 | Jun 3, 2026 |
KSAT’s Integrated Mission Services combines launch support, mission operations, and data delivery. CapabilityGeneralValue 3.0 | Jun 3, 2026 |
Axelspace’s existing GRUS constellation has been deployed and continuously operated with support from Kongsberg Satellite Services. RelationshipsCapabilityValue 3.7 | Jun 3, 2026 |
Kongsberg Satellite Services and Axelspace Corporation have expanded their strategic partnership to accelerate the growth of Axelspace’s AxelGlobe Earth observation business. RelationshipsGrowthValue 4.0 | Jun 3, 2026 |
The enhanced Axelspace and Kongsberg Satellite Services agreement is intended to strengthen Axelspace’s operational infrastructure. RelationshipsCapabilityGeneralValue 3.5 | Jun 3, 2026 |
The expanded Kongsberg Satellite Services and Axelspace partnership is intended to enhance satellite observation frequency, strengthen operational capabilities, and enable faster continuous monitoring of Earth’s surface. RelationshipsCapabilityValue 3.2 | Jun 3, 2026 |
KSATlite is designed for small satellites and mega-constellations. CapabilityValue 2.8 | Jun 3, 2026 |
Barbara Negri dirige la Oficina de Vuelo Humano y Experimentación de la ASI. GovernanceValue 4.0 | Jun 3, 2026 |
La ASI lanzó ICE-Blue tras firmar un acuerdo de colaboración con la Marina Militar Italiana en 2024. RelationshipsGeneralValue 4.0 | Jun 3, 2026 |
The Amerigo Vespucci is the oldest ship in service in the Italian Navy and was launched in 1931. CapabilityGeneralValue 2.4 | Jun 3, 2026 |
ICE-Blue will analyze physiological, cognitive, and behavioral changes in the cadets over 107 days aboard ship. GeneralValue 1.8 | Jun 3, 2026 |
The Livorno Naval Academy cadets will participate in a summer training campaign aboard the Amerigo Vespucci. PlanGeneralValue 2.0 | Jun 3, 2026 |
Walter Villadei, oficial de la Fuerza Aérea Italiana, participó como astronauta en la misión Axiom-3 a la Estación Espacial Internacional. GeneralValue 3.4 | Jun 3, 2026 |
Davide De Pietri Tonelli es el responsable científico del estudio clínico de ICE-Blue. GovernanceValue 2.0 | Jun 3, 2026 |
The Italian Space Agency and the Italian Institute of Technology launched a study on how the human body responds to the demands of long-duration space missions using isolation and prolonged operations at sea as a reference. GeneralValue 3.2 | Jun 3, 2026 |
ICE-Blue busca desarrollar métodos para identificar factores de riesgo en misiones espaciales relacionados con los ritmos circadianos, la calidad del descanso y la carga operativa. GeneralValue 2.0 | Jun 3, 2026 |
ICE-Blue aims to develop methods for identifying risk factors in space missions related to circadian rhythm disruption, sleep quality, and operational load. CapabilityGeneralValue 2.0 | Jun 3, 2026 |
The Italian Space Agency’s ICE-Blue initiative began after a collaboration agreement with the Italian Navy in 2024. RelationshipsPlanGeneralValue 3.0 | Jun 3, 2026 |
Artemis III is planned to land the first woman and the next man on the Moon in 2027. PlanGrowthValue 4.0 | Jun 3, 2026 |
NASA will give narrative partners access to its major programs, including Artemis, the Draco nuclear propulsion project, and the SR-1 Freedom reactor mission. GeneralValue 2.0 | Jun 3, 2026 |
NASA’s SR-1 Freedom space reactor is scheduled to travel to Mars in 2028 with the Skyfall payload. PlanCapabilityGeneralValue 4.5 | Jun 3, 2026 |
NASA plans to establish a lunar base in 2028 as part of the Artemis program. PlanGeneralValue 4.0 | Jun 3, 2026 |
NASA plans to test the Draco nuclear propulsion engine in flight in 2027. PlanCapabilityValue 4.0 | Jun 3, 2026 |
The NASA call will accept applications until June 30. LegalGeneralValue 2.0 | Jun 3, 2026 |
NASA’s narrative partner call prioritizes U.S. creators but allows proposals with minor international participation. GeneralLegalValue 2.0 | Jun 3, 2026 |
NASA plans to send the SR-1 Freedom space reactor toward Mars in 2028 with the Skyfall payload. PlanCapabilityGeneralValue 4.5 | Jun 3, 2026 |
NASA will not provide direct funding to its narrative partners. LegalGeneralValue 1.7 | Jun 3, 2026 |
NASA’s Artemis III mission is planned to land the first woman and the next man on the Moon in 2027. PlanValue 4.0 | Jun 3, 2026 |
NASA will prioritize U.S. creators, but it will accept proposals with minority international participation. LegalGeneralValue 1.8 | Jun 3, 2026 |
NASA’s Draco nuclear propulsion motor is being developed in collaboration with Lockheed Martin and is scheduled for an in-flight test in 2027. PlanRelationshipsCapabilityValue 4.5 | Jun 3, 2026 |
NASA will select up to 10 narrative partners. PlanGeneralValue 1.5 | Jun 3, 2026 |
NASA will select up to 10 narrative partners from among individual or collective creators. PlanValue 1.8 | Jun 3, 2026 |
NASA and Lockheed Martin are collaborating on the Draco nuclear propulsion engine. RelationshipsCapabilityValue 4.0 | Jun 3, 2026 |
NASA plans to establish a lunar base in 2028. PlanGrowthValue 4.0 | Jun 3, 2026 |
Selected NASA narrative partners will gain access to NASA programs, including Artemis, the Draco nuclear propulsion project with Lockheed Martin, and the SR-1 Freedom reactor mission with Skyfall. RelationshipsCapabilityValue 4.0 | Jun 3, 2026 |
Selected NASA narrative partners will not receive direct funding. GeneralLegalValue 1.3 | Jun 3, 2026 |
Applicants for NASA’s narrative partner program can apply until June 30. LegalValue 1.2 | Jun 3, 2026 |
NASA last received a signal from MAVEN on December 6 after the spacecraft passed behind Mars in its orbit and unexpectedly lost contact. CapabilityGeneralValue 4.0 | Jun 3, 2026 |
NASA’s MAVEN mission was launched on an Atlas V in 2013. GeneralValue 3.0 | Jun 3, 2026 |
SPICE-RACS uses light twisting through magnetic fields to infer the location and relative strength of magnetic fields. CapabilityValue 3.0 | Jun 3, 2026 |
Progress MS-33 has one Kurs antenna that failed to deploy after launch and was to be inspected during the EVA.
The EVA was expected to last about 5 hours and 27 minutes and end at about 22:45 Moscow Time on June 3, 2026.
Sergey Mikaev was outside the Poisk module during an EVA on June 3, 2026.
The LINK spacecraft is expected to launch from the Marshall Islands in the last week of June.
Katalyst's LINK spacecraft has left its factory and is heading to Wallops for integration onto Northrop's Pegasus rocket.
Axelspace’s expanded partnership with Kongsberg Satellite Services is intended to support future growth in environmental monitoring, disaster response, and maritime applications.
Axelspace will continue to use KSATlite, Kongsberg Satellite Services’ fully automated Ground Segment-as-a-Service for small satellites and mega-constellations.
Axelspace’s GRUS-3 mission will build out the company’s next-generation Earth observation microsatellite constellation.
Yuya Nakamura is the President and CEO of Axelspace.
The Axelspace and Kongsberg Satellite Services collaboration is aligned with ground segment cloudification and IT convergence in the commercial space sector.
Axelspace’s GRUS-3 Low Earth Orbit mission is scheduled to launch no earlier than July 2026.
KSAT’s Integrated Mission Services combines launch support, mission operations, and data delivery.
Axelspace’s existing GRUS constellation has been deployed and continuously operated with support from Kongsberg Satellite Services.
Kongsberg Satellite Services and Axelspace Corporation have expanded their strategic partnership to accelerate the growth of Axelspace’s AxelGlobe Earth observation business.
The enhanced Axelspace and Kongsberg Satellite Services agreement is intended to strengthen Axelspace’s operational infrastructure.
The expanded Kongsberg Satellite Services and Axelspace partnership is intended to enhance satellite observation frequency, strengthen operational capabilities, and enable faster continuous monitoring of Earth’s surface.
KSATlite is designed for small satellites and mega-constellations.
Barbara Negri dirige la Oficina de Vuelo Humano y Experimentación de la ASI.
La ASI lanzó ICE-Blue tras firmar un acuerdo de colaboración con la Marina Militar Italiana en 2024.
The Amerigo Vespucci is the oldest ship in service in the Italian Navy and was launched in 1931.
ICE-Blue will analyze physiological, cognitive, and behavioral changes in the cadets over 107 days aboard ship.
The Livorno Naval Academy cadets will participate in a summer training campaign aboard the Amerigo Vespucci.
Walter Villadei, oficial de la Fuerza Aérea Italiana, participó como astronauta en la misión Axiom-3 a la Estación Espacial Internacional.
Davide De Pietri Tonelli es el responsable científico del estudio clínico de ICE-Blue.
The Italian Space Agency and the Italian Institute of Technology launched a study on how the human body responds to the demands of long-duration space missions using isolation and prolonged operations at sea as a reference.
ICE-Blue busca desarrollar métodos para identificar factores de riesgo en misiones espaciales relacionados con los ritmos circadianos, la calidad del descanso y la carga operativa.
ICE-Blue aims to develop methods for identifying risk factors in space missions related to circadian rhythm disruption, sleep quality, and operational load.
The Italian Space Agency’s ICE-Blue initiative began after a collaboration agreement with the Italian Navy in 2024.
Artemis III is planned to land the first woman and the next man on the Moon in 2027.
NASA will give narrative partners access to its major programs, including Artemis, the Draco nuclear propulsion project, and the SR-1 Freedom reactor mission.
NASA’s SR-1 Freedom space reactor is scheduled to travel to Mars in 2028 with the Skyfall payload.
NASA plans to establish a lunar base in 2028 as part of the Artemis program.
NASA plans to test the Draco nuclear propulsion engine in flight in 2027.
The NASA call will accept applications until June 30.
NASA’s narrative partner call prioritizes U.S. creators but allows proposals with minor international participation.
NASA plans to send the SR-1 Freedom space reactor toward Mars in 2028 with the Skyfall payload.
NASA will not provide direct funding to its narrative partners.
NASA’s Artemis III mission is planned to land the first woman and the next man on the Moon in 2027.
NASA will prioritize U.S. creators, but it will accept proposals with minority international participation.
NASA’s Draco nuclear propulsion motor is being developed in collaboration with Lockheed Martin and is scheduled for an in-flight test in 2027.
NASA will select up to 10 narrative partners.
NASA will select up to 10 narrative partners from among individual or collective creators.
NASA and Lockheed Martin are collaborating on the Draco nuclear propulsion engine.
NASA plans to establish a lunar base in 2028.
Selected NASA narrative partners will gain access to NASA programs, including Artemis, the Draco nuclear propulsion project with Lockheed Martin, and the SR-1 Freedom reactor mission with Skyfall.
Selected NASA narrative partners will not receive direct funding.
Applicants for NASA’s narrative partner program can apply until June 30.
NASA last received a signal from MAVEN on December 6 after the spacecraft passed behind Mars in its orbit and unexpectedly lost contact.
NASA’s MAVEN mission was launched on an Atlas V in 2013.
SPICE-RACS uses light twisting through magnetic fields to infer the location and relative strength of magnetic fields.