All verified mentions of this organization in source documents.
Kairos No.3 will carry the 3U cubesat AETS-1 built by ArcEdge Space of Koto-ku, Tokyo as a payload.
Kairos No.3 is scheduled to carry the 3U cubesat AETS-1 built by ArcEdge Space of Koto, Tokyo as a payload.
ArcEdge Space is based in Koto Ward, Tokyo.
ArcEdge Space provides end-to-end solutions for microsatellite constellations, including planning, design, mass production, and operations.
The loan from Mizuho Bank is intended to fund working capital for ArcEdge Space, including procurement of satellite components and satellite launch costs for a satellite constellation.
ArcEdge Space plans to combine equity financing with lower-cost borrowing to strengthen its financial base and optimize its cost of capital.
ArcEdge Space’s cumulative fundraising totals ¥15,500,000,000, comprising ¥10,700,000,000 from third-party allotment capital increases and ¥4,800,000,000 from loan agreements including overdraft facilities.
On February 3, ArcEdge Space secured ¥3,000,000,000 in financing from Mizuho Bank under a loan agreement.
ArcEdge Space stated that multiple projects have entered the social implementation phase and that increasing on-hand cash will accelerate the company’s establishment of a mass-production system.
A new company called WALL was established on December 22, 2025, through joint investment by ArcEdge Space and six other companies.
ArcEdge Space has ordered six nanosatellites from Seiren, all of which are operating smoothly, including those that have reached their operational end.
ArcEdge Space is progressing towards establishing a mass production system for constellation operations to expand its services further.
ArcEdge Space announced the memorandum on December 9.
ArcEdge Space has designed, developed, manufactured, and operated a total of 15 satellites of sizes 3U and 6U, leveraging this knowledge for multiple in-house missions.
The memorandum outlines a challenge for ArcEdge Space to establish a manufacturing system for a greater number of 6U CubeSats than previously undertaken.
ArcEdge Space and Seiren have signed a memorandum to strengthen collaboration in manufacturing multiple nanosatellites for constellation operations.
ArcEdge Space aims to pursue cost benefits per unit and aim for shorter delivery times by securing long-lead items that currently take more than six months from order to delivery.
ArcEdge Space has accumulated knowledge related to design, manufacturing, and testing of nanosatellites through its experience.
With this launch, ArcEdge Space has developed and operated a total of 12 satellites in the AE series.
ArcEdge Space plans to efficiently design, manufacture, and operate multiple satellites using the newly developed common bus framework.