All verified mentions of this organization in source documents.
The overarching goal for the Complementary Technology Development (CTD) work is for the contractor to achieve Technology Readiness Levels (TRLs) between 4 and 6, depending on the initial TRL proposed.
Ariel has reached technology readiness level TRL 6.
CRC’s strategy is to build a scalable architecture around a methalox engine and to use high-TRL subsystems from the Canadian and European ecosystem.
Projects under the Advanced Technologies stream should advance technologies to Technology Readiness Level (TRL) 5 or 6.
Projects under the Next Wave of Technologies stream should bring early concepts to TRL 3 or 4.
The UVMOS project aims to reach a Technology Readiness Level (TRL) of 6 by mid 2027.
The highest TRL scores were awarded to superconducting qubits for quantum computing, neutral atoms for quantum simulation, photonic qubits for quantum networking, and spin defects for quantum sensing.
The results indicate that Genergo's technology has achieved a Technology Readiness Level (TRL) of 7/8.
TRL 7 indicates demonstration in orbit of a prototype, while TRL 8 qualifies the system as reliable and validated in space.
DISC is working to advance eClypse to a TRL 8 to demonstrate its effectiveness in space.
The eClypse technology received a TRL 6 space readiness rating in early 2024.
The Hydra Max terminal has been formally recognized by the Army at Technology Readiness Level 6 (TRL 6), indicating it has moved from prototype to an operationally validated system.
Genergo's technology has achieved a maturity level of TRL 7/8.
The LOI involves gathering operational data toward achieving Technology Readiness Level 9 (TRL-9).
The completed tests of the DFKI-X2D joint achieved Technology Readiness Level (TRL) 5, a significant step towards practical application in space.
CesiumAstro’s CommPack payload achieved Technology Readiness Level 9 (TRL 9) in late 2023, indicating full operational capability in space.
Carol Craig congratulated Arkisys for achieving Technology Readiness Level (TRL) 9, the highest readiness level indicating flight-proven technology.
DISC anticipates that strategic partnerships will support advancing eClypse from TRL 6 toward TRL 7 and higher.
The LiSS project will qualify for NASA Technology Readiness Level 8 (TRL-8).
The TRL-7 Sparrow (formerly Scout-Vision) hardware and software demonstrated operational success onboard the Orbit Fab TANKER-001 mission in 2021 by producing commercial, non-Earth imagery and space data products.