All verified mentions of this organization in source documents.
The updated manifest for Spectrum's debut flight includes new payloads from EnduroSat, the TU Wien Space Team, and Dcubed.
Thomas Sinn is the CEO of DCUBED.
The DCUBED demonstration represents a technical shift toward orbital construction capabilities.
DCUBED aims to manufacture structural components in space to bypass size constraints imposed by rocket fairings.
The Dcubed-1 / Araqys-D1 satellite deployed at approximately 2:20:18 after launch.
Dcubed plans two missions in 2026 to validate foundational technologies for the 'ARAQYS' project.
Dcubed announced the concept of 'ARAQYS' for space-based power supply solutions.
Dcubed's newly elevated leadership team reflects the company’s strengthened transatlantic focus and ambitions in technology and commerce.
Dcubed addresses the massive demand for affordable power with a full spectrum of space power solutions, including deployable solar arrays and in-space-manufactured solar array subsystems.
The production of the ARAQYS-D3 spacecraft and the in-space-manufactured solar array will occur at Dcubed’s facilities in Munich, Germany, and Berthoud, Colorado.
Astro Digital and Dcubed are collaborating to build the ARAQYS-D3 satellite.
Dcubed announced the ARAQYS-D3 mission, which is scheduled for launch in Q1 2027 aboard a SpaceX Rideshare mission.
Dcubed GmbH is expanding into space-based energy systems with the introduction of ARAQYS, a power solution for space.
Dcubed has delivered over 1,500 flight-proven products to more than 120 customers across four continents.
Dcubed expects Araqys to be commercially available by 2027.
Dcubed plans to demonstrate a larger 5kW array in 2028 and a 10kW array in 2029.
Dcubed expects Araqys to enable companies to build large, low-cost solar arrays on demand.
Dcubed estimates that Araqys could manufacture 1 square meter of solar array in about 2 minutes.
Dcubed unveiled three planned demo missions to build a 2kW solar array in space.
Dcubed plans to fly the first two demo missions in early 2026 to validate the ability to build structural elements for a solar blanket.