Polaris Intelligence
Polaris
Intelligence
About
Ctrl K
Sign in
© Polaris Intelligence 2026
PrivacyTermsAdmin

Crew Dragon

retired
Human SpaceflightLEOCOSPAR 2019-011ALaunched 3/2/2019
Admin Edit
Mission & Launch
Launch Mission
Crew Dragon DM-1
Launch Vehicle
Falcon 9 FT5
Launch Date
3/2/2019
Last Contact
3/8/2019
Orbit & Mass
Orbit Class
LEO
Altitude
296.5 km
Inclination
51.64 deg
Dry Mass
9,500 kg
Total Mass
13,055 kg
Payload Classification
Mission Type
Human Spaceflight
Payload Category
SS
Payload Class
B
Organizations
Operator
SpaceX
Manufacturer
SpaceX
Registry
COSPAR ID
2019-011A
UN Registration
ST/SG/SER.E/924
Track
Mentions
510
All verified mentions of this spacecraft in source documents.
0.0-5.0
Actions

SpaceX completed a full-duration static-fire test of Crew Dragon’s launch escape system on 2019-11-13 at Cape Canaveral, Florida.

CapabilityGeneralValue 4.2Nov 14, 2019SpaceX tests Crew Dragon abort thrusters

The same Crew Dragon spacecraft used in the 2019-11-13 static-fire test will be used for the in-flight abort test, with another Crew Dragon being moved up for the Demo-2 mission sometime in 2020.

Page22of26
PlanValue 4.0Nov 14, 2019SpaceX tests Crew Dragon abort thrusters

SpaceX performed a pad abort test of Crew Dragon’s launch escape system in 2015.

PlanCapabilityValue 3.8Nov 14, 2019SpaceX tests Crew Dragon abort thrusters

The Crew Dragon spacecraft destroyed on 2019-04-20 had previously flown the uncrewed Demo-1 mission to the International Space Station in March.

GeneralValue 3.5Nov 14, 2019SpaceX tests Crew Dragon abort thrusters

NASA has not yet scheduled valid crewed test flights for the Crew Dragon or Starliner pending certification.

PlanLegalValue 3.5Nov 8, 2019Astronaut preparing for ISS mission with reduced crew

Cassidy expressed hope that either a Boeing CST-100 Starliner or SpaceX Crew Dragon spacecraft will visit the ISS during their time there.

PlanValue 2.5Nov 8, 2019Astronaut preparing for ISS mission with reduced crew

SpaceX completed 13 consecutive successful tests of its 2019-03-03 parachute design for the Crew Dragon spacecraft as of 2019-11-03.

PlanCapabilityValue 4.0Nov 3, 2019SpaceX trumpets progress on commercial crew parachute testing

SpaceX will transition to the CRS-2 contract using a cargo version of Crew Dragon in 2020.

PlanCapabilityFinancialValue 4.0Nov 2, 2019Antares launches Cygnus cargo spacecraft on first CRS-2 mission

The new Crew Dragon spacecraft for Demo-2 is expected to be completed and ready to ship to Florida by late December of 2019.

PlanValue 4.0Oct 30, 2019Boeing and SpaceX preparing for commercial crew abort tests

SpaceX is testing a new 2019-03-03 version of the Crew Dragon parachutes that the company describes as having higher safety margins than earlier versions.

CapabilityPlanValue 4.0Oct 30, 2019Boeing and SpaceX preparing for commercial crew abort tests

SpaceX designated Crew Dragon as the company’s overwhelming priority, with only about 5% of the company working on Starship.

PlanCapabilityValue 2.5Oct 11, 2019NASA and SpaceX agree commercial crew development is the “highest priority”

If 2019-03-03 and 2019-03-02 performance prove comparable, fewer drop tests may be required to qualify 2019-03-03 for Crew Dragon.

PlanCapabilityValue 3.0Oct 11, 2019NASA and SpaceX agree commercial crew development is the “highest priority”

NASA and SpaceX committed as a team to the 2019-03-03 parachute design for Crew Dragon.

PlanValue 2.0Oct 11, 2019NASA and SpaceX agree commercial crew development is the “highest priority”

Testing of the overall Crew Dragon system may be completed and hardware for Demo-2 may be delivered to Florida by the end of the year.

PlanValue 4.0Oct 11, 2019NASA and SpaceX agree commercial crew development is the “highest priority”

Airborne Systems is developing an advanced 2019-03-03 parachute to be used on Crew Dragon.

CapabilityPlanValue 4.0Oct 9, 2019Boeing, SpaceX press towards commercial crew test flights this year

SpaceX is preparing an in-flight abort test in which a Crew Dragon spacecraft will separate from a Falcon 9 booster during ascent to test escape capability at maximum dynamic pressure.

PlanCapabilityValue 4.2Oct 9, 2019Boeing, SpaceX press towards commercial crew test flights this year

SpaceX is developing Crew Dragon and conducting Falcon 9 and Falcon Heavy launches in parallel with development of the Starship next-generation reusable launch vehicle.

PlanCapabilityValue 3.2Aug 20, 2019Commercial crew providers prepare for fall test flights

Uncertainty about when Boeing’s CST-100 Starliner and SpaceX’s Crew Dragon will be ready to transport astronauts is a significant challenge for NASA.

PlanGeneralValue 2.0Jul 30, 2019NASA warns commercial crew delays create uncertainty in ISS operations

Cargo Dragon 2 is a version of Crew Dragon and is designed for at least five flights to and from the station.

PlanCapabilityValue 3.0Jul 25, 2019SpaceX launches Dragon as it prepares for next cargo contract

SpaceX was testing both Draco thrusters and SuperDraco thrusters on the Crew Dragon ahead of an in-flight abort test then planned for the summer.

PlanCapabilityValue 4.0Jul 15, 2019Faulty valve blamed for Crew Dragon test accident