Polaris Intelligence
Polaris
Intelligence
About
Ctrl K
Sign in
© Polaris Intelligence 2026
PrivacyTermsAdmin

NTS 3

active
Positioning Navigation TimingGEOCOSPAR 2025-173ALaunched 8/13/2025
Admin Edit
Mission & Launch
Launch Mission
USSF-106
Launch Vehicle
Vulcan Centaur VC4S
Launch Date
8/13/2025
Orbit & Mass
Orbit Class
GEO
Altitude
35,439.5 km
Inclination
3.24 deg
Dry Mass
1,250 kg
Total Mass
1,250 kg
Payload Classification
Mission Type
Positioning Navigation Timing
Payload Category
NAV
Payload Class
D
Organizations
Operator
U.S. Space Force
Manufacturer
Northrop Grumman
Registry
COSPAR ID
2025-173A
Track
Mentions
86
All verified mentions of this spacecraft in source documents.
0.0-5.0
Actions

The Navigation Technology Satellite-3 (NTS-3) program is developing new navigation spacecraft for demonstrations in space.

PlanCapabilityValue 3.2Aug 2, 2021NTS-3 mission takes a leap towards launch in 2023
Page3of5

L3 Harris will construct the NTS-3 spacecraft by changing the spacecraft bus.

CapabilityPlanValue 3.0Aug 2, 2021NTS-3 mission takes a leap towards launch in 2023

Following L3 Harris’s work, the Air Force Research Laboratory (AFRL) tests the bus using the NTS-3 ground control and user equipment segments.

CapabilityGeneralValue 3.5Aug 2, 2021NTS-3 mission takes a leap towards launch in 2023

The spacecraft bus and the NTS-3P NT payload together form the NTS-3 spacecraft.

CapabilityValue 3.8Aug 2, 2021NTS-3 mission takes a leap towards launch in 2023

The Navigation Technology Satellite-3 (NTS-3) will be launched into geosynchronous orbit from Cape Canaveral in 2023.

PlanCapabilityValue 4.0Aug 2, 2021NTS-3 mission takes a leap towards launch in 2023

Northrop Grumman Corporation delivered the NTS-3 satellite bus to L3Harris Technologies.

RelationshipsValue 4.2Jul 30, 2021AFRL goes ahead with NTS-3 Spacecraft development

L3Harris Technologies will perform tests and integrate the NTS-3 PNT payload onto the bus to form the NTS-3 Spacecraft.

CapabilityPlanValue 4.3Jul 30, 2021AFRL goes ahead with NTS-3 Spacecraft development

NTS-3 uses a unique acquisition model for the ESPAStar line to provide Northrop Grumman’s bus to another defense contractor for payload integration using standard interfaces.

RelationshipsCapabilityValue 3.8Jul 30, 2021AFRL goes ahead with NTS-3 Spacecraft development

The Air Force Research Laboratory will test the NTS-3 bus with the NTS-3 ground control and user equipment segments and perform integrated testing on the overall NTS-3 system architecture.

PlanCapabilityGeneralValue 4.0Jul 30, 2021AFRL goes ahead with NTS-3 Spacecraft development

An ESPAStar bus has been built and delivered as a commercially-available commodity for the first time on the NTS-3 program.

CapabilityRelationshipsPlanValue 4.0Jul 30, 2021AFRL goes ahead with NTS-3 Spacecraft development

NTS-3 is designed to demonstrate alternate positioning, navigation, and timing (PNT) capabilities distinct from those provided by GPS.

CapabilityValue 4.0Jul 30, 2021AFRL goes ahead with NTS-3 Spacecraft development

L3Harris Technologies has received the NTS-3 satellite bus for spacecraft build and integration.

RelationshipsCapabilityValue 4.0Jul 30, 2021AFRL goes ahead with NTS-3 Spacecraft development

The experimental NTS-3 payload is designed to augment space-based position, navigation, and timing for warfighters and features a modular design capable of supporting a variety of mission needs.

CapabilityGeneralValue 4.0Jul 6, 2021Northrop Grumman Delivers A Star Of A Bus To L3Harris For Air Force’s NTS-3 Mission

The ESPAStar-D platform supports the Navigation Technology Satellite-3 (NTS-3) mission for the Air Force Research Laboratory scheduled to launch from Cape Canaveral in 2022.

PlanCapabilityValue 4.0Jul 6, 2021Northrop Grumman Delivers A Star Of A Bus To L3Harris For Air Force’s NTS-3 Mission

The NTS-3 launch delay is due to launch scheduling and results from NTS-3 being a rideshare with other United States Space Force customers, with AFRL not controlling the overall schedule.

PlanRelationshipsValue 4.0Apr 28, 2021Air Force NTS-3 navigation satellite to launch in 2023

The launch delay provides AFRL additional time to complete the NTS-3 ground system work.

PlanCapabilityValue 3.0Apr 28, 2021Air Force NTS-3 navigation satellite to launch in 2023

L3Harris is building the 1,250-kilogram NTS-3 satellite under an $84,000,000 contract that AFRL awarded in December 2018.

RelationshipsFinancialCapabilityPlanValue 5.0Apr 28, 2021Air Force NTS-3 navigation satellite to launch in 2023

The U.S. Space Force will take ownership of NTS-3 after AFRL completes the experiment and will integrate it into its regular set of capabilities.

RelationshipsCapabilityValue 4.0Apr 28, 2021Air Force NTS-3 navigation satellite to launch in 2023

Air Force Research Laboratory is planning a 2023 launch of the NTS-3 experimental satellite for positioning, navigation, and timing (PNT).

PlanCapabilityValue 4.0Apr 28, 2021Air Force NTS-3 navigation satellite to launch in 2023

NTS-3 could provide significant new secure PNT capabilities to supplement current GPS satellites that operate from medium Earth orbit.

CapabilityValue 3.0Apr 28, 2021Air Force NTS-3 navigation satellite to launch in 2023