セーレン株式会社
All verified mentions of this organization in source documents.
Fukui Prefecture provided subsidy allocations that helped Seiren establish a mass production pipeline for small satellite buses and synthetic aperture radar antenna arrays.
Seiren has a technical collaboration with Synspective on small satellite buses and synthetic aperture radar antenna arrays.
Seiren Co., Ltd. finalized a tripartite satellite communications contract with SSC Space and Infostellar Inc. on July 7, 2026, in Tokyo, Japan.
Seiren led the structural development of the Fukui Prefectural Citizens’ Satellite Project, which launched the RWASAT-1 CubeSat in 2021.
The FUSION-1 campaign is Seiren’s pathfinder for end-to-end mission control operations.
The contract establishes an automated Ground-Segment-as-a-Service pipeline for telemetry, tracking, and control operations for Seiren’s FUSION-1 technology demonstration mission.
ArcEdge Space and Seiren have signed a memorandum to strengthen collaboration in manufacturing multiple nanosatellites for constellation operations.
ArcEdge Space has ordered six nanosatellites from Seiren, all of which are operating smoothly, including those that have reached their operational end.