Polaris Intelligence
Polaris
Intelligence
About
Ctrl K
Sign in
© Polaris Intelligence 2026
PrivacyTermsAdmin

Astrobotic

US

Astrobotic is a private American company specializing in space robotics and lunar missions. As a lunar logistics provider, they design and manufacture lunar landers like Peregrine and Griffin, capable of carrying payloads to the Moon's surface. Astrobotic works with NASA through the Commercial Lunar Payload Services (CLPS) program, as well as with other commercial and government partners, to facilitate space exploration and technology demonstration. The company aims to make space missions more accessible and affordable.

commercialFounded 2007
Pittsburgh, Pennsylvania, United States
www.astrobotic.com
Admin Edit
0.0-5.0

All verified mentions of this organization in source documents.

Astrobotic expects Peregrine to launch in the fourth quarter of 2022, a schedule that depends on both the readiness of the lander and of ULA’s Vulcan.

PlanGeneralValue 3.0Apr 21, 2022Astrobotic lunar lander on track for late 2022 launch

Peregrine is a pathfinder for Astrobotic’s larger Griffin lander that is being built to deliver NASA’s VIPER rover to the lunar south pole in late 2023.

PlanCapabilityValue 4.2Apr 21, 2022Astrobotic lunar lander on track for late 2022 launch

Astrobotic Technology displayed its nearly complete Peregrine lunar lander at its Pittsburgh headquarters on 2022-04-20.

CapabilityGeneralValue 3.0Apr 21, 2022Astrobotic lunar lander on track for late 2022 launch

Astrobotic planned to subject Peregrine to environmental testing within a couple of months after the 2022-04-20 event, followed by shipment to the launch site late 2022.

PlanValue 4.0Apr 21, 2022Astrobotic lunar lander on track for late 2022 launch

Astrobotic’s Pittsburgh headquarters is an approximately 50,000-square-foot facility dedicated to developing and operating lunar spacecraft.

CapabilityGeneralValue 4.0Apr 20, 2022The Unveiling Of Astrobotic’s Peregrine Lunar Lander

Astrobotic unveiled the flight model of its Peregrine lunar lander on 2022-04-20 at the company’s headquarters in Pittsburgh, Pennsylvania.

CapabilityValue 3.6Apr 20, 2022Astrobotic Unveils Peregrine Lunar Lander Flight Model

Astrobotic’s Pittsburgh headquarters is an approximately 50,000-square-foot facility dedicated to developing and operating lunar spacecraft.

CapabilityGeneralValue 4.0Apr 20, 2022Astrobotic Unveils Peregrine Lunar Lander Flight Model

NASA awarded Astrobotic Technology a $199,500,000 task order under the Commercial Lunar Payload Services contract to deliver the Volatiles Investigating Polar Exploration Rover (VIPER) to the lunar south pole on the Griffin lander.

RelationshipsFinancialPlanValue 5.0Mar 14, 2022Agile supplies thrusters for Astrobotic, ispace and Masten lunar landers

Astrobotic was selected to receive funding for its LiDAR-based Hazard Detection sensor (LHD) as part of NASA’s Flight Opportunities TechFlights solicitation.

RelationshipsFinancialValue 4.0Jan 3, 2022NASA’s Program Enables Astrobotic’s Hazard Detection System To Take Flight

Astrobotic conducted an LHD testing campaign in the Mojave Desert in 2014 that demonstrated full terrain relative navigation and hazard detection together aboard a rocket-powered lander.

CapabilityGeneralValue 4.0Jan 3, 2022NASA’s Program Enables Astrobotic’s Hazard Detection System To Take Flight

LHD testing will take place in early 2023 and will be used to support landing Astrobotic’s Griffin lunar lander on the Moon’s surface in late 2023.

PlanCapabilityValue 4.0Jan 3, 2022NASA’s Program Enables Astrobotic’s Hazard Detection System To Take Flight

United Launch Alliance expected to receive BE-4 engines in the first quarter of 2022 to support an inaugural launch for Astrobotic’s Peregrine lunar lander in 2022.

PlanCapabilityValue 4.0Dec 13, 2021New launch vehicles face schedule pressure

The IM-1, IM-2, and Astrobotic’s Peregrine missions are scheduled to launch in 2022.

PlanValue 4.0Nov 18, 2021NASA selects Intuitive Machines for CLPS lunar landing mission

Astrobotic opened a Lunar Regolith Lab at its headquarters in Pittsburgh, Pennsylvania on 2021-11-09.

CapabilityGrowthValue 3.6Nov 9, 2021Astrobotic Reveals New Lunar Regolith Lab for Rover Testing

Astrobotic has partnered with Hellenic Technology of Robotics to develop space-grade wheels for the CubeRover.

RelationshipsCapabilityValue 4.0Nov 9, 2021Astrobotic Reveals New Lunar Regolith Lab for Rover Testing

Astrobotic will deliver its second CubeRover to NASA early next year after mobility testing in the simulant lab, a thermal vacuum chamber, a vibration table, and other offsite test facilities.

RelationshipsPlanCapabilityValue 4.2Nov 9, 2021Astrobotic Reveals New Lunar Regolith Lab for Rover Testing

VIPER is scheduled to arrive at the Moon in late 2023 delivered by Astrobotic’s Griffin lunar lander on a mission arranged through NASA’s Commercial Lunar Payload Services program.

PlanRelationshipsGeneralValue 4.0Sep 21, 2021NASA picks landing site for VIPER lunar rover

SpaceX won a Falcon Heavy contract from Astrobotic in April to launch the Griffin lunar lander carrying NASA’s VIPER rover as part of the Commercial Lunar Payload Services program.

RelationshipsPlanValue 4.3Sep 11, 2021SpaceX wins contract to launch weather satellite after ULA withdraws

Astrobotic won a Phase I NASA Small Business Innovation Research (SBIR) contract to further develop sensors for three-dimensional mapping of uncooperative spacecraft and planetary bodies in real time.

RelationshipsPlanCapabilityGrowthLegalValue 4.5Aug 11, 2021Astrobotic Awarded Funding to Map Uncooperative Spacecraft in Real Time

Astrobotic's ALIN software solution uses LiDAR Simultaneous Localization and Mapping (SLAM) for navigation and mapping in space.

CapabilityValue 4.0Aug 11, 2021Astrobotic Awarded Funding to Map Uncooperative Spacecraft in Real Time
Page28of40
Track