Polaris Intelligence
Polaris
Intelligence
About
Ctrl K
Sign in
© Polaris Intelligence 2026
PrivacyTermsAdmin

Nominal Systems

US

Nominal Systems is an Australia-based software company that provides a digital engineering platform designed to help aerospace companies build, test, and validate satellite designs and performance in a virtual environment. Their digital twin platform aims to minimize the risk of mission failure, offering high-fidelity simulations and analysis tools for spacecraft design, testing, and operations. Nominal Systems works with organizations like the UK Ministry of Defence, Gilmour Space Technologies, and the Australian National University, and has partnerships with companies like Bright Ascension. Key words associated with Nominal Systems include: digital twins, satellite simulation, aerospace software, mission planning, and space system testing.

commercialFounded 2019
New York, New York, United States
nominal.so
Admin Edit
0.0-5.0

All verified mentions of this organization in source documents.

The European Data Relay System’s EDRS-C is commanded for up to 200 inter-satellite links per day during nominal operations.

CapabilityGeneralValue 4.0May 11, 2026Your anomaly detection isn’t the problem

Mercury handles nominal satellite operations in the background while surfacing only what requires human attention.

CapabilityValue 1.6May 11, 2026Your anomaly detection isn’t the problem

AST SpaceMobile’s BlueBird 7 satellite was lost after the Blue Origin New Glenn NG-3 mission on April 19 left its payload in an unusable off-nominal orbit.

CapabilityPlanValue 4.0May 7, 2026AST SpaceMobile Pivots to SpaceX for Mid-June Launch of Three BlueBird Satellites

LISA’s nominal science phase will last 4.5 years.

PlanValue 3.8May 5, 2026Thales Alenia Space Secures Key Contract for ESA’s Gravitational Wave Observatory

Blue Origin placed AST SpaceMobile’s BlueBird 7 satellite into an off-nominal orbit on NG-3.

FinancialGeneralValue 1.0Apr 27, 2026The great launch constraint

The nominal pace for Canadian Space Agency astronaut flights to the ISS is every six years based on current flight rates.

PlanGeneralValue 3.0Apr 24, 2026Josh Kutryk will officially go to ISS no earlier than September, but aboard SpaceX

Blue Origin’s NG-3 mission achieved nominal booster recovery but did not deliver the mission its customer expected.

GeneralValue 4.0Apr 20, 2026So perhaps GS2 spun out of control midway in the burn? 'cause if it's "insufficient thrust" on one of the two engines, in theory there should be enough power to compensate by just burning longer.

The NG-3 mission achieved nominal booster recovery.

GeneralCapabilityValue 2.6Apr 20, 2026RT by @GewoonLukas_: Now that we have a more complete view, we wanted to provide an update on our NG-3 mission. While we are pleased with the nominal booster recovery, we clearly didn't deliver the mission our customer wanted, and our team expects. Early data suggest that on our second GS2 burn, one…

Rocket Lab paid $155.3 million in aggregate consideration for Mynaric AG, consisting of a nominal cash payment and 2,277,002 shares of Rocket Lab Common Stock.

RelationshipsFinancialValue 4.7Apr 20, 2026Rocket Lab Completes Mynaric Acquisition

Blue Origin’s New Glenn booster recovery on the third mission was nominal.

CapabilityPlanValue 3.5Apr 20, 2026BlueBird 7 Satellite Does Not Reach Intended Orbit

Blue Origin placed the NG-3 payload into an off-nominal orbit.

PlanValue 3.0Apr 20, 2026NG-3: Blue Origin conferma orbita non nominale

Blue Origin’s NG-3 mission experienced an off-nominal orbital insertion on 19 April 2026.

PlanValue 3.5Apr 20, 2026NG-3: Blue Origin conferma orbita non nominale

Blue Origin placed the payload into an off-nominal orbit.

CapabilityValue 3.5Apr 19, 2026Uh oh, that's not good... The BlueBird 7 satellite was deployed but into an off-nominal orbit. Given that GS2 was supposed to perform a second burn before deploying the satellite, it likely failed to do so.

BlueBird 7 was deployed into an off-nominal orbit.

CapabilityPlanValue 2.5Apr 19, 2026Uh oh, that's not good... The BlueBird 7 satellite was deployed but into an off-nominal orbit. Given that GS2 was supposed to perform a second burn before deploying the satellite, it likely failed to do so.

The payload was placed into an off-nominal orbit.

CapabilityValue 2.2Apr 19, 2026RT by @GewoonLukas_: NG-3 Update: We have confirmed payload separation. AST SpaceMobile has confirmed the satellite has powered on. The payload was placed into an off-nominal orbit. We are currently assessing and will update when we have more detailed information.

AST SpaceMobile's BlueBird 7 was placed into an off-nominal orbit on Blue Origin's NG-3 mission.

PlanCapabilityGeneralValue 3.8Apr 19, 2026Blue Origin Achieves First Booster Reuse but Satellite Enters Off-Nominal Orbit

New Glenn-3 nominal ocean impact and end of mission occur 3 hours 5 minutes and 8 seconds after liftoff.

PlanGeneralValue 4.0Apr 18, 2026RT by @GewoonLukas_: Check out the New Glenn-3 mission timeline. pic.

The final transaction price for Mynaric AG included a nominal cash payment and nearly 2.3 million shares of Rocket Lab stock.

RelationshipsFinancialValue 4.0Apr 15, 2026Rocket Lab Closes Mynaric Acquisition at Higher Price Than Originally Agreed

Orion is on a nominal return trajectory toward a splashdown in the Pacific Ocean.

PlanGeneralValue 3.0Apr 9, 2026Artemis 2 crew reflects on lunar flyby and Earth’s fragility during briefing

Orion is on a nominal return trajectory.

GeneralValue 2.0Apr 8, 2026Artemis 2 crew captures rare lunar science as Orion splashdown target time announced
Page2of8
Track