Polaris Intelligence
Polaris
Intelligence
About
Ctrl K
Sign in
© Polaris Intelligence 2026
PrivacyTermsAdmin

NASA

US

NASA, the National Aeronautics and Space Administration, is the United States government agency responsible for space exploration, space technology, and aeronautics research. As a space agency, NASA leads both crewed and robotic missions, develops new space technologies, and conducts research in space science. NASA is known for its partnerships with organizations like ESA and its work on programs like the International Space Station (ISS), the Artemis Program, and the Space Launch System (SLS). Associated keywords include: space exploration, aeronautics, space technology, and scientific discovery.

gov civilFounded 1958
History · 1 eventOct 1, 1958 · NACA dissolved and its core functions transferred to NASA
Washington, District of Columbia, United States
www.nasa.gov
Admin Edit
0.0-5.0

All verified mentions of this organization in source documents.

NASA said Artemis 3 will stay in low Earth orbit and dock with prototypes of Blue Moon Mark 2 and SpaceX's Starship.

PlanRelationshipsGeneralValue 4.0Jun 1, 2026Artemis and the blue micromoon

NASA awarded Blue Origin a $6.1 million CLPS contract for the SCALPSS flight on Endurance without a competition.

RelationshipsFinancialPlanValue 4.8Jun 1, 2026What does Blue Origin’s New Glenn rocket explosion mean for NASA’s Artemis program? A domino of timeline lapses and strategic failures.

Endurance will carry NASA’s third SCALPSS multi-camera payload.

CapabilityValue 4.0Jun 1, 2026What does Blue Origin’s New Glenn rocket explosion mean for NASA’s Artemis program? A domino of timeline lapses and strategic failures.

NASA wants a successful landing on Blue Moon Mark 1 before entrusting VIPER to that lander.

PlanValue 4.0Jun 1, 2026Artemis and the blue micromoon

Blue Origin’s New Glenn rocket suffered a massive explosion during a test fire on its pad two days after the NASA contract awards.

CapabilityRelationshipsValue 4.0Jun 1, 2026What does Blue Origin’s New Glenn rocket explosion mean for NASA’s Artemis program? A domino of timeline lapses and strategic failures.

NASA later used SNAP power sources on several Apollo surface missions.

GeneralCapabilityValue 3.0Jun 1, 2026Lost and found on the Pacific floor: the Nimbus SNAP-19 nuclear generators

NASA selected Blue Origin's Blue Moon Mark 1 to deliver both rovers on separate missions under a contract worth up to $468.4 million if all options are exercised.

RelationshipsFinancialPlanValue 5.0Jun 1, 2026Artemis and the blue micromoon

Representatives of NASA, the Atomic Energy Commission, and Sandia positively identified the SNAP-19 generator on September 27, 1968.

CapabilityValue 3.2Jun 1, 2026Lost and found on the Pacific floor: the Nimbus SNAP-19 nuclear generators

NASA renamed Blue Origin's Blue Moon Mark 1 lander Moon Base 1 and scheduled it to fly in fall 2026 with a NASA payload under the Commercial Lunar Payload Services program.

PlanRelationshipsCapabilityGeneralValue 4.0Jun 1, 2026Artemis and the blue micromoon

NASA has selected the CLV-1 rover developed by Venturi Astrolab to transport astronauts across the Moon from 2028.

RelationshipsPlanCapabilityGrowthValue 4.5Jun 1, 2026Venturi Space to invest €250 million in Toulouse facility, targeting 200 jobs by 2030

NASA’s 2021 Artemis lander selection process chose SpaceX’s Starship as the primary provider over Blue Origin’s simpler launch architecture proposal.

RelationshipsValue 4.5Jun 1, 2026What does Blue Origin’s New Glenn rocket explosion mean for NASA’s Artemis program? A domino of timeline lapses and strategic failures.

Endurance recently passed space environmental testing at NASA’s Johnson Space Center in Thermovac Chamber A.

CapabilityValue 4.0Jun 1, 2026What does Blue Origin’s New Glenn rocket explosion mean for NASA’s Artemis program? A domino of timeline lapses and strategic failures.

NASA selected Astrolab and Lunar Outpost to develop lunar rovers, and each contract is worth about $220 million.

RelationshipsFinancialValue 4.8Jun 1, 2026Artemis and the blue micromoon

NASA renamed Astrobotic's Griffin-1 lander Moon Base 2 and Intuitive Machines' lunar lander Moon Base 3.

PlanGeneralValue 2.5Jun 1, 2026Artemis and the blue micromoon

NASA set the upper limit on the rover mass at one metric ton for the Blue Moon Mark 1 delivery missions.

CapabilityPlanValue 4.0Jun 1, 2026Artemis and the blue micromoon

Astrolab's rover for NASA is Crewed Lunar Vehicle 1, or CLV-1, based on the FLEX rover concept and scaled down to meet NASA's revised requirements.

CapabilityValue 4.0Jun 1, 2026Artemis and the blue micromoon

NASA’s Thermovac Chamber A simulates the temperature and vacuum conditions Endurance is expected to face during lunar transit and at the lunar south pole.

CapabilityPlanGeneralValue 3.5Jun 1, 2026What does Blue Origin’s New Glenn rocket explosion mean for NASA’s Artemis program? A domino of timeline lapses and strategic failures.

NASA planned to award Blue Origin a $190 million CLPS contract for delivering VIPER on a second Blue Moon Mark 1 lander if the required milestones were met.

RelationshipsFinancialPlanValue 4.5Jun 1, 2026What does Blue Origin’s New Glenn rocket explosion mean for NASA’s Artemis program? A domino of timeline lapses and strategic failures.

NASA’s Office of Inspector General released a report in March highlighting shortcomings and risks in Blue Origin’s crewed Blue Moon Mark 2 lander program.

LegalGeneralValue 3.5Jun 1, 2026What does Blue Origin’s New Glenn rocket explosion mean for NASA’s Artemis program? A domino of timeline lapses and strategic failures.

NASA previously said Artemis 3 was once planned to be the first crewed landing attempt of the Artemis program.

PlanValue 2.8Jun 1, 2026Artemis and the blue micromoon
Page48of762
Track