Polaris Intelligence
Polaris
Intelligence
About
Ctrl K
Sign in
© Polaris Intelligence 2026
PrivacyTermsAdmin

SSC Infrastructure Portfolio Acquisition Executive

US

SSC portfolio acquisition executive responsible for integrated test and training capabilities and combat-readiness infrastructure.

gov defense
www.ssc.spaceforce.mil/Program-Offices/Infrastructure
Admin Edit
0.0-5.0

All verified mentions of this organization in source documents.

SOIA connects sensing infrastructure, operational intelligence, mission coordination, and autonomous execution in a continuous cycle for real-time space operations.

CapabilityGeneralValue 2.0Mar 26, 2026Slingshot Aerospace Introduces New Category for Space Operations

The second phase of NASA’s lunar base plan will begin in 2029 and will develop habitats and infrastructure for regular astronaut operations.

PlanCapabilityValue 4.0Mar 25, 2026La NASA presenta un plan de 18.000 millones de euros para establecer una base permanente en la Luna

United Launch Alliance has doubled payload processing infrastructure at its Eastern launch site and will bring its West Coast launch site online later in the year with modifications to support Vulcan.

CapabilityPlanGrowthValue 4.0Mar 25, 2026Latest News

SES provides ground infrastructure for the Lynk-Omnispace direct-to-device service.

RelationshipsCapabilityValue 4.0Mar 25, 2026Latest News

The Lunar Utility Vehicle’s arm will perform semi-autonomous sample handling, cargo transport, and infrastructure maintenance.

CapabilityValue 4.0Mar 25, 2026Kinova joins Mission Control-led consortium for Canadian Lunar Utility Vehicle bid

MeoSphere includes edge computing and ultra-secure onboard storage to reduce dependency on ground infrastructure.

CapabilityValue 3.6Mar 25, 2026SES Taps K2 Space for Next-Gen ‘meoSphere’ MEO Network

Luqia Technologies combines INO’s optics and photonics infrastructure with CRIM’s AI and data science expertise.

RelationshipsCapabilityValue 3.6Mar 25, 2026INO and CRIM merge to form Luqia Technologies with $52M federal backing

NASA plans to pause the Gateway program in its current form and focus on infrastructure for sustained lunar surface operations.

PlanCapabilityValue 4.0Mar 25, 2026NASA outlines lunar base phases, LEO transition plan and nuclear propulsion mission

MB Group’s ground infrastructure is already in place in Oman.

CapabilityValue 2.2Mar 25, 2026Latest News

The third phase of NASA’s lunar base plan will begin in 2032 and will establish permanent infrastructure including power systems, mobile-phone-style communications networks, and a lunar positioning system.

PlanCapabilityValue 4.0Mar 25, 2026La NASA presenta un plan de 18.000 millones de euros para establecer una base permanente en la Luna

Intuitive Machines will use its space infrastructure, lunar landing system, Space Data Network, and autonomous surface operations capabilities to support payload delivery under the CLPS contract.

RelationshipsCapabilityValue 4.2Mar 25, 2026NASA CLPS Award Expands Lunar Operations

NASA’s lunar base phase two is intended to establish early infrastructure, including semi-habitable capabilities and regular logistics.

PlanCapabilityValue 4.0Mar 25, 2026NASA outlines lunar base phases, LEO transition plan and nuclear propulsion mission

The second tranche of mission areas includes infrastructure, battle management, and space intelligence.

GeneralCapabilityValue 1.7Mar 25, 2026Latest News

Space&Blue applications include environmental monitoring, route security, marine resource management, and protection of critical infrastructure.

CapabilityValue 2.0Mar 24, 2026ASI pubblica il primo bando Space&Blue: l’Italia unisce spazio e mare e apre una nuova fase industriale

The Japan Aerospace Exploration Agency’s pressurized rover will act as a mobile habitat for astronauts during NASA’s lunar infrastructure phase.

CapabilityPlanValue 4.0Mar 24, 2026NASA unveils new Moon base plans, pauses Lunar Gateway

The U.S. Space Force plans to invest in test and training infrastructure for large force exercises and rapid adaptation to threats in space.

PlanCapabilityGrowthValue 2.7Mar 24, 2026Latest News

Amazon Leo’s two initial service bands already have ground infrastructure installed and operating.

CapabilityGeneralValue 3.6Mar 24, 2026Latest News

NASA plans to deploy surface communication nodes, massive solar arrays, and early nuclear surface power during its 2029–2032 lunar infrastructure phase.

PlanCapabilityValue 4.0Mar 24, 2026NASA unveils new Moon base plans, pauses Lunar Gateway

Ramon.Space and Ingrasys aim to build scalable computing infrastructure for orbital satellite data processing by the end of the decade.

PlanCapabilityGrowthValue 3.0Mar 24, 2026Ramon.Space, Ingrasys Aim To Fly Prototype Orbital Data Center In 2027

Amazon Leo is designed to support advanced encryption and private network connectivity into AWS Cloud infrastructure or a private data center.

CapabilityValue 3.7Mar 24, 2026Latest News
Page28of146
Track