Polaris Intelligence
Polaris
Intelligence
About
Ctrl K
Sign in
© Polaris Intelligence 2026
PrivacyTermsAdmin

Lunar Prospector Mission

completedLaunch 1998-001
Launched 1/7/1998LEOService CSat LEO SO
Admin Edit
Payloads
Assets deployed on this mission, enriched from spacecraft records.
1 payload
Lunar Prospector
retired
Science Exploration
cislunar
Launch Details
Launch Date
1/7/1998
Launch ID
1998-001
Launch Profile
Sat LEO SO
Service Type
C
Customer Type
G
Orbit
LEO
Launch Stack
Operator
Lockheed Martin
Launch Vehicle
Athena-2
Launch Site
Space Launch Complex 46, Spaceport Florida, Cape CanaveralUS
Payload Summary
Payload Count
1
Payload Status
retired 1
Payload Mission Types
Science Exploration 1
Track
Mentions
2
All verified mentions of this mission in source documents.

The Navajo Nation had previously expressed concern about human remains being sent to the Moon in 1998 after the NASA Lunar Prospector mission.

LegalValue 2.5Jan 29, 2024The sacred Moon: Navigating diverse cultural beliefs in lunar missions

Buu Nygren, president of the Navajo Nation, requested that NASA delay the launch because memorial payloads on Peregrine are viewed by the Navajo Nation as desecration and he cited an agreement after the 1998 Lunar Prospector mission that carried Eugene Shoemaker’s ashes.

PlanGovernanceLegalValue 4.5Jan 4, 2024NASA instruments set to fly on Peregrine commercial lunar lander