Polaris Intelligence
Polaris
Intelligence
About
Ctrl K
Sign in
© Polaris Intelligence 2026
PrivacyTermsAdmin

THEMIS

completedLaunch 2007-004
Launched 2/17/2007HEOService CGSat HEO LO
Admin Edit
Payloads
Assets deployed on this mission, enriched from spacecraft records.
5 payloads
THEMIS A
active
Science Exploration
HEO
THEMIS B
active
Science ExplorationHEO
THEMIS C
active
Science ExplorationHEO
THEMIS D
active
Science ExplorationGEO
THEMIS E
active
Science ExplorationGEO
Launch Details
Launch Date
2/17/2007
Launch ID
2007-004
Launch Profile
Sat HEO LO
Service Type
CG
Orbit
HEO
Launch Stack
Operator
United Launch Alliance (ULA)
Launch Vehicle
Delta 7925-10C
Launch Site
Space Launch Complex 17B, Cape Canaveral (Cape Canaveral Air Station, Florida)US
Payload Summary
Payload Count
5
Payload Status
active 5
Payload Mission Types
Science Exploration 5
Track
Mentions
108
All verified mentions of this mission in source documents.

ESA awarded ArianeGroup €230 million across two contracts in November 2024 for additional Themis T1E testing.

RelationshipsFinancialPlanCapabilityValue 4.8Feb 19, 2026SSC Space Opens Orbital Launch Control Center at Esrange

Themis will perform initial low-altitude hop tests at Esrange as part of the European Commission’s SALTO programme.

PlanGeneralValue 4.0Feb 19, 2026SSC Space Opens Orbital Launch Control Center at Esrange

The European Space Agency’s Themis reusable rocket demonstrator will be the first vehicle to utilize Esrange’s new Orbital Launch Control Center for suborbital flights.

RelationshipsCapabilityValue 4.3Feb 19, 2026SSC Space Opens Orbital Launch Control Center at Esrange

The research used multi-spacecraft observations, including data from NASA’s Van Allen Probes and the THEMIS mission, to measure particle distributions, electric fields, and wave activity.

GeneralValue 3.0Feb 9, 2026Alfven waves drive stable electric fields that power auroras

ESA has not reported progress towards the initial low-altitude flight of Themis since the transfer to the launch pad.

PlanValue 2.5Jan 13, 2026La ESA “espera la primavera” para lanzar el demostrador de cohetes reutilizable Themis

The European Space Agency (ESA) is waiting for spring to launch a test of its reusable rocket demonstrator Themis in Sweden.

PlanGeneralValue 3.4Jan 13, 2026La ESA “espera la primavera” para lanzar el demostrador de cohetes reutilizable Themis

ESA aims to conduct the first test of Themis in the first quarter of 2026.

PlanValue 4.0Jan 13, 2026La ESA “espera la primavera” para lanzar el demostrador de cohetes reutilizable Themis

In June 2025, ArianeGroup transported the first Themis demonstrator from its facilities in Les Mureaux to the Esrange Space Center in northern Sweden.

PlanGeneralValue 3.6Jan 13, 2026La ESA “espera la primavera” para lanzar el demostrador de cohetes reutilizable Themis

ESA began work on the Themis project in 2019 to develop reusable rocket technology for future European launch systems.

PlanCapabilityValue 3.5Jan 13, 2026La ESA “espera la primavera” para lanzar el demostrador de cohetes reutilizable Themis

On January 8, Toni Tolker-Nielsen, acting director of ESA's Space Transportation program, stated that weather has been a determining factor for the initial flight test of Themis.

PlanGeneralValue 2.0Jan 13, 2026La ESA “espera la primavera” para lanzar el demostrador de cohetes reutilizable Themis

ESA began work on the Themis project in 2019 to mature reusable rocket technology for future European launch systems.

PlanCapabilityValue 4.0Jan 8, 2026ESA “Waiting for Spring” to Launch Themis Reusable Rocket Demonstrator

In September 2025, ArianeGroup announced that the 28-metre-tall Themis demonstrator was transferred to the launch pad for a combined test campaign.

PlanCapabilityValue 4.0Jan 8, 2026ESA “Waiting for Spring” to Launch Themis Reusable Rocket Demonstrator

ESA has not provided further updates on the progress toward the first flight of Themis since the transfer to the launch pad.

PlanValue 2.0Jan 8, 2026ESA “Waiting for Spring” to Launch Themis Reusable Rocket Demonstrator

Director General Josef Aschbacher revealed that ESA is targeting the first quarter of 2026 for the first hop test of Themis.

PlanGeneralValue 4.0Jan 8, 2026ESA “Waiting for Spring” to Launch Themis Reusable Rocket Demonstrator

In June 2025, the first Themis demonstrator was transported by ArianeGroup from its facility in Les Mureaux to the Esrange Space Centre in northern Sweden.

PlanValue 3.0Jan 8, 2026ESA “Waiting for Spring” to Launch Themis Reusable Rocket Demonstrator

The European Space Agency (ESA) is waiting for spring to launch the initial hop test of its Themis reusable rocket booster demonstrator.

PlanValue 4.0Jan 8, 2026ESA “Waiting for Spring” to Launch Themis Reusable Rocket Demonstrator

Testing of a more powerful three-engine variant of Themis, known as T3, is expected to begin at the Guiana Space Centre in French Guiana after testing in Kiruna is complete.

PlanCapabilityValue 4.2Jan 8, 2026ESA “Waiting for Spring” to Launch Themis Reusable Rocket Demonstrator

The additional funding will support an evolution of the Prometheus rocket engine that powers Themis and an upgraded variant called T1E for medium-altitude hop tests.

CapabilityFinancialPlanValue 4.0Jan 8, 2026ESA “Waiting for Spring” to Launch Themis Reusable Rocket Demonstrator

The acting Director of ESA’s Space Transportation programme, Toni Tolker-Nielsen, stated that the weather is currently preventing the initial test flight of Themis.

PlanGeneralValue 3.0Jan 8, 2026ESA “Waiting for Spring” to Launch Themis Reusable Rocket Demonstrator

The LRBs would have been derived from the Themis reusable booster demonstrator, which ArianeGroup is developing under an ESA contract.

RelationshipsCapabilityValue 4.0Jan 7, 2026ArianeGroup Proposes Ariane 6 Evolution Using MaiaSpace Boosters
Page2of6