Polaris Intelligence
Polaris
Intelligence
About
Ctrl K
Sign in
© Polaris Intelligence 2026
PrivacyTermsAdmin
Launch Vehicles
Vehicle family profile

H2B

Family-level launch record combining canonical variants, historical missions, public cadence forecasts, and available payload performance specs.

Manufacturer unknownRetired
Admin
Variants
1
Canonical variants linked to this family.
Historical missions
9
Missions in the public mission table with actual launch dates.
Peak listed capacity
Unknown
Maximum payload capacity across listed variants and orbits.

Launch Cadence

Historical missions are grouped by actual launch year. Forecast cadence uses family-level launch-rate rows.

YearHistorical missionsForecast launches
201110
201210
201310
201510
201610
201810
201910
202010

Performance Specs

Payload capacity by variant and target orbit when structured capacity rows are available.

VariantOrbitCapacityAltitudeInclinationSource

No performance specs

No structured payload capacity rows are linked to this vehicle family.

Recent Missions

Latest launched missions using variants in this family.

MissionVariantLaunch
HTV-9
H-IIB
May 20, 2020
HTV-8
H-IIB
Sep 24, 2019
HTV-7
H-IIB
Sep 22, 2018
HTV-6

Variants

Canonical variants rolled up into this launch vehicle family.

VariantStagesMissionsStatus
H-IIB
Not stated9Retired
H-IIB
Dec 9, 2016
HTV-5
H-IIB
Aug 19, 2015
HTV-4
H-IIB
Aug 3, 2013
HTV-3
H-IIB
Jul 21, 2012
HTV-2
H-IIB
Jan 22, 2011

Forecasted Missions

Upcoming mission rows with announced launch timing.

MissionVariantAnnounced

No forecasted missions

No upcoming announced mission rows are linked to this vehicle family.

Track
Mentions
2
All verified mentions of this launch vehicle family in source documents.
0.0-5.0
Actions

JAXA scheduled an H2B launch for 2020-05-22 to deliver the Kounotori-9 cargo shuttle to the International Space Station.

PlanValue 4.6Mar 25, 2020MHI pressing through pandemic toward late 2020 H3 rocket debut

After the Kounotori-9 launch, MHI will modify the H2B launchpad at Tanegashima to enable H3 missions by supporting different attach points and changing rocket exhaust pathways to reduce acoustic vibration during liftoff.

Capability
Plan
Value 4.5
Mar 25, 2020
MHI pressing through pandemic toward late 2020 H3 rocket debut