Family-level launch record combining canonical variants, historical missions, public cadence forecasts, and available payload performance specs.
Historical missions are grouped by actual launch year. Forecast cadence uses family-level launch-rate rows.
| Year | Historical missions | Forecast launches |
|---|---|---|
| 2019 | 11 | 0 |
| 2020 | 25 | 0 |
| 2021 | 31 | 0 |
| 2022 | 60 | 0 |
| 2023 | 91 | 0 |
| 2024 | 132 | 0 |
| 2025 | 165 | 0 |
| 2026 | 82 | 140 |
| 2027 | 0 | 157 |
| 2028 | 0 | 185 |
| 2029 | 0 | 203 |
| 2030 | 0 | 211 |
| 2031 | 0 | 211 |
| 2032 | 0 | 210 |
| 2033 | 0 | 209 |
| 2034 | 0 | 209 |
| 2035 | 0 |
Payload capacity by variant and target orbit when structured capacity rows are available.
| Variant | Orbit | Capacity | Altitude | Inclination | Source |
|---|---|---|---|---|---|
Falcon 9 | LEO | 22,000 kg | Unknown | Unknown | SpaceX Capabilities & Services |
Falcon 9 FT5 | LEO | 22,000 kg | Unknown | Unknown | SpaceX Capabilities & Services (live vehicle spec sheet) |
Latest launched missions using variants in this family.
| Mission | Variant | Launch |
|---|---|---|
| Starlink-408 | Falcon 9 FT5 | Jul 11, 2026 |
| Starlink-407 | Falcon 9 FT5 | Jul 9, 2026 |
| Transporter-17 | Falcon 9 FT5 | Jul 7, 2026 |
| Starlink-406 |
Canonical variants rolled up into this launch vehicle family.
| Variant | Stages | Missions | Status |
|---|---|---|---|
Falcon 9 | Not stated | 7 | Retired |
Falcon 9 1.1 | Not stated | 14 | Retired |
Falcon 9 FT3 | Not stated | 24 | Retired |
Falcon 9 FT4 | Not stated | 12 | Retired |
| 209 |
| 2036 | 0 | 209 |
| 2037 | 0 | 209 |
| 2038 | 0 | 209 |
| 2039 | 0 | 209 |
| 2040 | 0 | 209 |
| 2041 | 0 | 209 |
4 launch locations represented.
| Year | Location | Launches | Confidence | Basis |
|---|---|---|---|---|
| 2026 | Space Launch Complex 40, Cape Canaveral (Cape Canaveral Air Station, Florida) | 85 | 85% | SLC-40 is the Falcon high-throughput workhorse. Base stays below the FAA-analyzed 120/year cap to reflect range weather, maintenance, pad turnarounds, drone-sh... |
| 2026 | Launch Complex 39A, NASA Kennedy Space Center, Florida (NASA John F. Kennedy Space Center, Florida) | 15 | 65% | LC-39A remains useful for crewed Dragon, high-priority NASA/commercial missions, and Falcon Heavy, but Falcon 9 single-stick work shifts toward SLC-40 and Vand... |
| 2026 | Space Launch Complex 4-East, Vandenberg AFB (South Vandenberg AFB, California) | 40 | 85% | SLC-4E already supports high polar/SSO and NRO/Starshield cadence. Base rises to about half of the authorized VSFB combined Falcon capacity once SLC-6 is also ... |
| 2026 | Space Launch Complex 6, Vandenberg AFB (South Vandenberg AFB, California) | 0 | 65% | SLC-6 provides the main incremental West Coast capacity. Ramp starts after pad modifications and operational shakeout, then reaches a mature cadence just below... |
| 2027 | Space Launch Complex 40, Cape Canaveral (Cape Canaveral Air Station, Florida) | 95 | 85% | SLC-40 is the Falcon high-throughput workhorse. Base stays below the FAA-analyzed 120/year cap to reflect range weather, maintenance, pad turnarounds, drone-sh... |
| 2027 | Launch Complex 39A, NASA Kennedy Space Center, Florida (NASA John F. Kennedy Space Center, Florida) | 12 | 65% | LC-39A remains useful for crewed Dragon, high-priority NASA/commercial missions, and Falcon Heavy, but Falcon 9 single-stick work shifts toward SLC-40 and Vand... |
| 2027 | Space Launch Complex 4-East, Vandenberg AFB (South Vandenberg AFB, California) | 45 | 85% | SLC-4E already supports high polar/SSO and NRO/Starshield cadence. Base rises to about half of the authorized VSFB combined Falcon capacity once SLC-6 is also ... |
| 2027 | Space Launch Complex 6, Vandenberg AFB (South Vandenberg AFB, California) | 5 | 65% | SLC-6 provides the main incremental West Coast capacity. Ramp starts after pad modifications and operational shakeout, then reaches a mature cadence just below... |
| 2028 | Space Launch Complex 40, Cape Canaveral (Cape Canaveral Air Station, Florida) | 105 | 85% | SLC-40 is the Falcon high-throughput workhorse. Base stays below the FAA-analyzed 120/year cap to reflect range weather, maintenance, pad turnarounds, drone-sh... |
| 2028 | Launch Complex 39A, NASA Kennedy Space Center, Florida (NASA John F. Kennedy Space Center, Florida) | 10 | 65% | LC-39A remains useful for crewed Dragon, high-priority NASA/commercial missions, and Falcon Heavy, but Falcon 9 single-stick work shifts toward SLC-40 and Vand... |
| 2028 | Space Launch Complex 4-East, Vandenberg AFB (South Vandenberg AFB, California) | 50 | 85% | SLC-4E already supports high polar/SSO and NRO/Starshield cadence. Base rises to about half of the authorized VSFB combined Falcon capacity once SLC-6 is also ... |
| 2028 | Space Launch Complex 6, Vandenberg AFB (South Vandenberg AFB, California) | 20 | 65% | SLC-6 provides the main incremental West Coast capacity. Ramp starts after pad modifications and operational shakeout, then reaches a mature cadence just below... |
| 2029 | Space Launch Complex 40, Cape Canaveral (Cape Canaveral Air Station, Florida) | 110 | 85% | SLC-40 is the Falcon high-throughput workhorse. Base stays below the FAA-analyzed 120/year cap to reflect range weather, maintenance, pad turnarounds, drone-sh... |
| 2029 | Launch Complex 39A, NASA Kennedy Space Center, Florida (NASA John F. Kennedy Space Center, Florida) | 8 | 65% | LC-39A remains useful for crewed Dragon, high-priority NASA/commercial missions, and Falcon Heavy, but Falcon 9 single-stick work shifts toward SLC-40 and Vand... |
| 2029 | Space Launch Complex 4-East, Vandenberg AFB (South Vandenberg AFB, California) | 50 | 85% | SLC-4E already supports high polar/SSO and NRO/Starshield cadence. Base rises to about half of the authorized VSFB combined Falcon capacity once SLC-6 is also ... |
| 2029 | Space Launch Complex 6, Vandenberg AFB (South Vandenberg AFB, California) | 35 | 65% | SLC-6 provides the main incremental West Coast capacity. Ramp starts after pad modifications and operational shakeout, then reaches a mature cadence just below... |
| 2030 | Space Launch Complex 40, Cape Canaveral (Cape Canaveral Air Station, Florida) | 110 | 85% | SLC-40 is the Falcon high-throughput workhorse. Base stays below the FAA-analyzed 120/year cap to reflect range weather, maintenance, pad turnarounds, drone-sh... |
| 2030 | Launch Complex 39A, NASA Kennedy Space Center, Florida (NASA John F. Kennedy Space Center, Florida) | 6 | 65% | LC-39A remains useful for crewed Dragon, high-priority NASA/commercial missions, and Falcon Heavy, but Falcon 9 single-stick work shifts toward SLC-40 and Vand... |
| 2030 | Space Launch Complex 4-East, Vandenberg AFB (South Vandenberg AFB, California) | 50 | 85% | SLC-4E already supports high polar/SSO and NRO/Starshield cadence. Base rises to about half of the authorized VSFB combined Falcon capacity once SLC-6 is also ... |
| 2030 | Space Launch Complex 6, Vandenberg AFB (South Vandenberg AFB, California) | 45 | 65% | SLC-6 provides the main incremental West Coast capacity. Ramp starts after pad modifications and operational shakeout, then reaches a mature cadence just below... |
| 2031 | Space Launch Complex 40, Cape Canaveral (Cape Canaveral Air Station, Florida) | 110 | 85% | SLC-40 is the Falcon high-throughput workhorse. Base stays below the FAA-analyzed 120/year cap to reflect range weather, maintenance, pad turnarounds, drone-sh... |
| 2031 | Launch Complex 39A, NASA Kennedy Space Center, Florida (NASA John F. Kennedy Space Center, Florida) | 6 | 65% | LC-39A remains useful for crewed Dragon, high-priority NASA/commercial missions, and Falcon Heavy, but Falcon 9 single-stick work shifts toward SLC-40 and Vand... |
| 2031 | Space Launch Complex 4-East, Vandenberg AFB (South Vandenberg AFB, California) | 50 | 85% | SLC-4E already supports high polar/SSO and NRO/Starshield cadence. Base rises to about half of the authorized VSFB combined Falcon capacity once SLC-6 is also ... |
| 2031 | Space Launch Complex 6, Vandenberg AFB (South Vandenberg AFB, California) | 45 | 65% | SLC-6 provides the main incremental West Coast capacity. Ramp starts after pad modifications and operational shakeout, then reaches a mature cadence just below... |
SLC-40 is the Falcon high-throughput workhorse. Base stays below the FAA-analyzed 120/year cap to reflect range weather, maintenance, pad turnarounds, drone-ship cycles, and Stars...
LC-39A remains useful for crewed Dragon, high-priority NASA/commercial missions, and Falcon Heavy, but Falcon 9 single-stick work shifts toward SLC-40 and Vandenberg as Starship i...
SLC-4E already supports high polar/SSO and NRO/Starshield cadence. Base rises to about half of the authorized VSFB combined Falcon capacity once SLC-6 is also online.
SLC-6 provides the main incremental West Coast capacity. Ramp starts after pad modifications and operational shakeout, then reaches a mature cadence just below SLC-4E.
SLC-40 is the Falcon high-throughput workhorse. Base stays below the FAA-analyzed 120/year cap to reflect range weather, maintenance, pad turnarounds, drone-ship cycles, and Stars...
Falcon 9 FT5 | LEO | 17,400 kg | Unknown | Unknown | Falcon 9 - Wikipedia (citing SpaceX Capabilities & Services spec sheet, archived 2025-08-06) |
Falcon 9 FT5 | GTO | 8,300 kg | Unknown | Unknown | SpaceX Falcon 9 vehicle page |
Falcon 9 | GTO | 8,300 kg | Unknown | 28.5 deg | SpaceX Capabilities & Services |
Falcon 9 | SSO | 7,742 kg | 500 km | 97.4 deg | SpaceX Falcon 9 User's Guide 2009, Table 4-3 via Spaceflight Now |
Falcon 9 FT5 | SSO | 7,742 kg | 500 km | 97.4 deg | SpaceX Falcon 9 User's Guide 2009, Table 4-3 via Spaceflight Now |
Falcon 9 FT5 | GTO | 5,800 kg | Unknown | Unknown | Falcon 9 - Wikipedia (citing SpaceX Capabilities & Services spec sheet, archived 2025-08-06) |
Falcon 9 | GTO | 5,500 kg | Unknown | 28.5 deg | SpaceX Capabilities & Services |
Falcon 9 FT5 | escape | 4,020 kg | Unknown | Unknown | SpaceX Falcon 9 vehicle page |
Falcon 9 | escape | 4,020 kg | Unknown | Unknown | SpaceX Capabilities & Services |
Falcon 9 FT5 |
| Jul 5, 2026 |
| Starlink-405 | Falcon 9 FT5 | Jul 2, 2026 |
| SXM-11 Mission | Falcon 9 FT5 | Jun 29, 2026 |
| Starlink-404 | Falcon 9 FT5 | Jun 28, 2026 |
| Starlink-403 | Falcon 9 FT5 | Jun 24, 2026 |
Upcoming mission rows with announced launch timing.
| Mission | Variant | Announced |
|---|---|---|
No forecasted missionsNo upcoming announced mission rows are linked to this vehicle family. | ||
Falcon 9 FT5 | Not stated | 606 | Active |
LC-39A remains useful for crewed Dragon, high-priority NASA/commercial missions, and Falcon Heavy, but Falcon 9 single-stick work shifts toward SLC-40 and Vandenberg as Starship i...
SLC-4E already supports high polar/SSO and NRO/Starshield cadence. Base rises to about half of the authorized VSFB combined Falcon capacity once SLC-6 is also online.
SLC-6 provides the main incremental West Coast capacity. Ramp starts after pad modifications and operational shakeout, then reaches a mature cadence just below SLC-4E.
SLC-40 is the Falcon high-throughput workhorse. Base stays below the FAA-analyzed 120/year cap to reflect range weather, maintenance, pad turnarounds, drone-ship cycles, and Stars...
LC-39A remains useful for crewed Dragon, high-priority NASA/commercial missions, and Falcon Heavy, but Falcon 9 single-stick work shifts toward SLC-40 and Vandenberg as Starship i...
SLC-4E already supports high polar/SSO and NRO/Starshield cadence. Base rises to about half of the authorized VSFB combined Falcon capacity once SLC-6 is also online.
SLC-6 provides the main incremental West Coast capacity. Ramp starts after pad modifications and operational shakeout, then reaches a mature cadence just below SLC-4E.
SpaceX is targeting Thursday, 2024-05-09 for a Falcon 9 launch of 20 Starlink satellites, including 13 with Direct to Cell capabilities, to low-Earth orbit from Space Launch Complex 4 East (SLC-4E) at Vandenberg Space Force Base in California.
The Florida Falcon 9 launch on 2024-05-08 was scheduled from Launch Complex 39A (LC-39A) at Kennedy Space Center with liftoff targeted for 11:00 a.m. ET and backup opportunities available until 2:42 p.m. ET.
SpaceX planned two Falcon 9 launches on Wednesday, 2024-05-08 from two U.S. coasts.
The SLC-4E Falcon 9 launch on 2024-05-08 is targeted for 7:48 p.m. PT with 20 Starlink satellites, including 13 equipped with Direct to Cell capabilities, to low-Earth orbit.
SpaceX will conduct two Falcon 9 launches on Wednesday, 2024-05-08 from two U.S. coasts.
The first Falcon 9 launch on 2024-05-08 is from Launch Complex 39A (LC-39A) at NASA’s Kennedy Space Center in Florida.
Space Pioneer is developing the Tianlong-3 reusable rocket with capacity comparable to Falcon 9 and planned to launch later in the summer of 2024.
The second Falcon 9 launch on 2024-05-08 is from Space Launch Complex 4 East (SLC-4E) at Vandenberg Space Force Base in California.
The two Galileo satellites were successfully injected into orbit by a Falcon 9 rocket from Florida.
Two more Galileo satellites are scheduled to launch later this year on a Falcon 9.
In the coming weeks, ESA will launch its EarthCARE spacecraft on a Falcon 9 and its Hera asteroid mission this fall on another Falcon 9.
The EU switched to Falcon 9 for launching the Galileo satellites due to the retirement of the Ariane 5 and the loss of the Soyuz rocket.
The Falcon 9 launching Polaris Dawn will place Crew Dragon into an initial elliptical orbit of approximately 190 by 1,200 km.
The Falcon 9 booster that flew the Maxar 1 mission had previously supported the launches of Crew-1, Crew-2, SXM-8, CRS-23, IXPE, Transporter-4, Transporter-5, Globalstar FM15, ISI EROS C-3, Korea 425, and nine Starlink missions.
SpaceX targeted Thursday, 2024-05-02 for a Falcon 9 launch of 23 Starlink satellites to low-Earth orbit from Space Launch Complex 40 (SLC-40) at Cape Canaveral Space Force Station with liftoff targeted for 10:13 p.m. ET and backup opportunities available until 1:17 a.m. ET on Friday, 2024-05-03.
A Falcon 9 was originally scheduled to launch two satellites with a combined mass of 1,500 kg into a sun-synchronous orbit from SLC-4E on Wednesday, 2024-04-17 at 11:30 AM PDT.
The Maxar 1 Falcon 9 first stage was planned to land on Landing Zone 4 (LZ-4) at Vandenberg Space Force Base after stage separation.
The Falcon 9 first stage supporting the Maxar 1 mission completed its 20th flight on this mission.
A Falcon 9 was originally scheduled to launch from SLC-4E on 2024-04-17 carrying two satellites with a total mass of 1,500 kg into a sun-synchronous orbit.
The first two spacecraft of Maxar’s six-satellite WorldView Legion constellation are scheduled to launch as soon as 2024-05-02 on a Falcon 9 from Vandenberg Space Force Base in California.