Polaris Intelligence
Polaris
Intelligence
About
Ctrl K
Sign in
© Polaris Intelligence 2026
PrivacyTermsAdmin
Launch Vehicles
Vehicle family profile

New Glenn

Family-level launch record combining canonical variants, historical missions, public cadence forecasts, and available payload performance specs.

Blue OriginActive
Admin
Variants
1
Canonical variants linked to this family.
Historical missions
3
Missions in the public mission table with actual launch dates.
Peak listed capacity
45,000 kg
Maximum payload capacity across listed variants and orbits.

Launch Cadence

Historical missions are grouped by actual launch year. Forecast cadence uses family-level launch-rate rows.

YearHistorical missionsForecast launches
202520
202613
202705
202808
2029011
2030014
2031018
2032022
2033024
2034024
2035024
2036024
2037024
2038024
2039024
2040024
2041024

Performance Specs

Payload capacity by variant and target orbit when structured capacity rows are available.

VariantOrbitCapacityAltitudeInclinationSource
New Glenn 7x2
LEO45,000 kgUnknownUnknownBlue Origin New Glenn vehicle page
New Glenn 7x2
GTO13,600 kgUnknownUnknownBlue Origin New Glenn vehicle page

Recent Missions

Latest launched missions using variants in this family.

MissionVariantLaunch
SpaceMobile-007 Mission
New Glenn 7x2
Apr 19, 2026
ESCAPADE
New Glenn 7x2
Nov 13, 2025
Blue Ring Pathfinder Mission
New Glenn 7x2
Jan 16, 2025

Forecasted Missions

Upcoming mission rows with announced launch timing.

MissionVariant

Variants

Canonical variants rolled up into this launch vehicle family.

VariantStagesMissionsStatus
New Glenn 7x2
Not stated3Active

Forecast Location Split

2 launch locations represented.

YearLocationLaunchesConfidenceBasis
2026Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida)350%New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, fa...
2026Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California)045%Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a...
2027Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida)550%New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, fa...
2027Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California)045%Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a...
2028Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida)850%New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, fa...
2028Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California)045%Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a...
2029Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida)1050%New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, fa...
2029Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California)145%Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a...
2030Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida)1250%New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, fa...
2030Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California)245%Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a...
2031Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida)1450%New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, fa...
2031Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California)445%Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a...
2032Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida)1650%New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, fa...
2032Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California)645%Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a...
2033Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida)1650%New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, fa...
2033Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California)845%Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a...
2034Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida)1650%New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, fa...
2034Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California)845%Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a...
2035Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida)1650%New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, fa...
2035Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California)845%Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a...
2036Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida)1650%New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, fa...
2036Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California)845%Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a...
2037Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida)1650%New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, fa...
2037Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California)845%Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a...
Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida)
2026 · 50% confidence
3

New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, factory flow, and cust...

Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California)
2026 · 45% confidence
0

Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a multi-year ramp.

Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida)
2027 · 50% confidence
5

New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, factory flow, and cust...

Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California)
2027 · 45% confidence
0

Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a multi-year ramp.

Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida)
2028 · 50% confidence
8
New Glenn 7x2
TLI
7,000 kg
Unknown
Unknown
Wikipedia New Glenn (citing Blue Origin official specs)
Announced

No forecasted missions

No upcoming announced mission rows are linked to this vehicle family.

Track

New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, factory flow, and cust...

Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California)
2028 · 45% confidence
0

Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a multi-year ramp.

Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida)
2029 · 50% confidence
10

New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, factory flow, and cust...

Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California)
2029 · 45% confidence
1

Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a multi-year ramp.

Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida)
2030 · 50% confidence
12

New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, factory flow, and cust...

Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California)
2030 · 45% confidence
2

Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a multi-year ramp.

Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida)
2031 · 50% confidence
14

New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, factory flow, and cust...

Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California)
2031 · 45% confidence
4

Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a multi-year ramp.

Mentions
883
All verified mentions of this launch vehicle family in source documents.
0.0-5.0
Actions

AST SpaceMobile planned to stack up to eight BlueBird satellites on a single New Glenn launch.

PlanGrowthValue 4.0Apr 27, 2026The great launch constraint

Blue Origin flew a reused New Glenn booster on the NG-3 mission for the first time.

Page7of45
PlanCapabilityGeneralValue 4.0Apr 27, 2026The great launch constraint

Blue Origin’s New Glenn launched from Cape Canaveral, Florida, on April 19 for its third flight.

PlanGeneralValue 4.0Apr 27, 2026The great launch constraint

Blue Origin’s New Glenn booster named Never Tell Me The Odds previously flew on NG-2 in November and landed on the company’s ship Jacklyn in the Atlantic.

PlanCapabilityGeneralValue 3.0Apr 27, 2026The great launch constraint

The Blue Origin New Glenn variant is grounded pending a post-launch review.

PlanCapabilityGeneralValue 3.0Apr 26, 2026Bad news, but good news followed

Blue Origin’s New Glenn upper stage failed to deploy AST SpaceMobile’s BlueBird #7 into its intended orbit.

CapabilityGeneralValue 4.0Apr 26, 2026Bad news, but good news followed

Quilty Space estimated that New Glenn is unlikely to fly for three to six months while Blue Origin performs root cause analysis and remediation.

PlanValue 3.0Apr 26, 2026Bad news, but good news followed

The Federal Aviation Administration ordered an investigation into the failed New Glenn launch.

LegalValue 2.8Apr 26, 2026Bad news, but good news followed

Deutsche Bank estimated that most of AST SpaceMobile’s roughly 45 planned satellites are intended to launch on New Glenn.

PlanGeneralValue 3.0Apr 26, 2026Bad news, but good news followed

Blue Origin successfully reused a New Glenn first-stage booster for the first time on the NG-3 mission.

CapabilityPlanGeneralValue 4.0Apr 23, 2026Blue Origin CEO Attributes BlueBird 7 Satellite Loss to Second-Stage Thrust Anomaly

One of New Glenn’s two BE-3U hydrogen-fueled upper-stage engines failed to produce sufficient thrust to reach the target insertion orbit.

CapabilityValue 4.0Apr 23, 2026Blue Origin CEO Attributes BlueBird 7 Satellite Loss to Second-Stage Thrust Anomaly

Blue Origin will lead the New Glenn mishap investigation with FAA oversight.

LegalRelationshipsValue 3.0Apr 23, 2026Blue Origin CEO Attributes BlueBird 7 Satellite Loss to Second-Stage Thrust Anomaly

Blue Origin’s third New Glenn mission launched on April 19, 2026 from Cape Canaveral.

PlanValue 4.0Apr 23, 2026Blue Origin CEO Attributes BlueBird 7 Satellite Loss to Second-Stage Thrust Anomaly

The FAA has classified the New Glenn upper-stage failure as a mishap.

LegalValue 3.5Apr 23, 2026Blue Origin CEO Attributes BlueBird 7 Satellite Loss to Second-Stage Thrust Anomaly

New Glenn cannot return to flight until the FAA approves the investigation findings.

LegalValue 3.0Apr 23, 2026Blue Origin CEO Attributes BlueBird 7 Satellite Loss to Second-Stage Thrust Anomaly

A thrust anomaly during New Glenn’s second-stage GS2 burn caused the loss of AST SpaceMobile’s BlueBird 7 satellite.

GeneralCapabilityPlanValue 4.0Apr 23, 2026Blue Origin CEO Attributes BlueBird 7 Satellite Loss to Second-Stage Thrust Anomaly

The FAA has grounded New Glenn pending a formal investigation.

LegalValue 3.5Apr 23, 2026Blue Origin CEO Attributes BlueBird 7 Satellite Loss to Second-Stage Thrust Anomaly

The New Glenn upper stage likely performed about half of its burn and was likely in a roughly 200 x 470 km orbit with a 43.0-degree inclination.

CapabilityGeneralValue 3.8Apr 22, 2026On the GS2 - it seems now that USSF do NOT expect to track it in orbit, as BlueBird-FM7 was tracking no. 68765 & newly launched GPS III SV10 is 68791, leaving only 25 gaps for the 25 Starlink sats of just launched Group 17-22.

Blue Origin’s New Glenn first stage is named "Never Tell Me The Odds."

CapabilityGeneralValue 2.5Apr 22, 2026RT by @GewoonLukas_: Amazing views of New Glenn returning via @JerryPikePhoto pic.

A Blue Origin New Glenn rocket failed to deliver an AST SpaceMobile BlueBird satellite to the correct orbit.

CapabilityPlanValue 4.0Apr 22, 2026FCC Grants AST SpaceMobile Commercial Authorization for Direct-to-Device Service