Family-level launch record combining canonical variants, historical missions, public cadence forecasts, and available payload performance specs.
Historical missions are grouped by actual launch year. Forecast cadence uses family-level launch-rate rows.
| Year | Historical missions | Forecast launches |
|---|---|---|
| 2025 | 2 | 0 |
| 2026 | 1 | 3 |
| 2027 | 0 | 5 |
| 2028 | 0 | 8 |
| 2029 | 0 | 11 |
| 2030 | 0 | 14 |
| 2031 | 0 | 18 |
| 2032 | 0 | 22 |
| 2033 | 0 | 24 |
| 2034 | 0 | 24 |
| 2035 | 0 | 24 |
| 2036 | 0 | 24 |
| 2037 | 0 | 24 |
| 2038 | 0 | 24 |
| 2039 | 0 | 24 |
| 2040 | 0 | 24 |
| 2041 | 0 | 24 |
Payload capacity by variant and target orbit when structured capacity rows are available.
| Variant | Orbit | Capacity | Altitude | Inclination | Source |
|---|---|---|---|---|---|
New Glenn 7x2 | LEO | 45,000 kg | Unknown | Unknown | Blue Origin New Glenn vehicle page |
New Glenn 7x2 | GTO | 13,600 kg | Unknown | Unknown | Blue Origin New Glenn vehicle page |
Latest launched missions using variants in this family.
| Mission | Variant | Launch |
|---|---|---|
| SpaceMobile-007 Mission | New Glenn 7x2 | Apr 19, 2026 |
| ESCAPADE | New Glenn 7x2 | Nov 13, 2025 |
| Blue Ring Pathfinder Mission | New Glenn 7x2 | Jan 16, 2025 |
Upcoming mission rows with announced launch timing.
| Mission | Variant |
|---|
Canonical variants rolled up into this launch vehicle family.
| Variant | Stages | Missions | Status |
|---|---|---|---|
New Glenn 7x2 | Not stated | 3 | Active |
2 launch locations represented.
| Year | Location | Launches | Confidence | Basis |
|---|---|---|---|---|
| 2026 | Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida) | 3 | 50% | New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, fa... |
| 2026 | Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California) | 0 | 45% | Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a... |
| 2027 | Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida) | 5 | 50% | New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, fa... |
| 2027 | Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California) | 0 | 45% | Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a... |
| 2028 | Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida) | 8 | 50% | New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, fa... |
| 2028 | Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California) | 0 | 45% | Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a... |
| 2029 | Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida) | 10 | 50% | New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, fa... |
| 2029 | Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California) | 1 | 45% | Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a... |
| 2030 | Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida) | 12 | 50% | New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, fa... |
| 2030 | Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California) | 2 | 45% | Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a... |
| 2031 | Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida) | 14 | 50% | New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, fa... |
| 2031 | Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California) | 4 | 45% | Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a... |
| 2032 | Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida) | 16 | 50% | New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, fa... |
| 2032 | Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California) | 6 | 45% | Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a... |
| 2033 | Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida) | 16 | 50% | New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, fa... |
| 2033 | Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California) | 8 | 45% | Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a... |
| 2034 | Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida) | 16 | 50% | New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, fa... |
| 2034 | Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California) | 8 | 45% | Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a... |
| 2035 | Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida) | 16 | 50% | New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, fa... |
| 2035 | Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California) | 8 | 45% | Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a... |
| 2036 | Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida) | 16 | 50% | New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, fa... |
| 2036 | Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California) | 8 | 45% | Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a... |
| 2037 | Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida) | 16 | 50% | New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, fa... |
| 2037 | Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California) | 8 | 45% | Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a... |
New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, factory flow, and cust...
Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a multi-year ramp.
New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, factory flow, and cust...
Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a multi-year ramp.
New Glenn 7x2 |
| TLI |
| 7,000 kg |
| Unknown |
| Unknown |
| Wikipedia New Glenn (citing Blue Origin official specs) |
| Announced |
|---|
No forecasted missionsNo upcoming announced mission rows are linked to this vehicle family. |
New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, factory flow, and cust...
Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a multi-year ramp.
New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, factory flow, and cust...
Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a multi-year ramp.
New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, factory flow, and cust...
Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a multi-year ramp.
New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, factory flow, and cust...
Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a multi-year ramp.
Amazon Leo depends on Blue Origin’s New Glenn and ULA’s Vulcan and booked additional launches with SpaceX to maintain its FCC license timeline.
Blue Origin posted on X on 21 February 2026 that the payload fairing for New Glenn’s third launch arrived at the Integration Facility at LC-36 with AST SpaceMobile’s BlueBird satellite secured inside.
The payload fairing containing BlueBird was delivered to the integration facility of Launch Complex 36 where assembly activities with the New Glenn launch vehicle will continue.
The insertion of BlueBird into the New Glenn preparation sequence indicates that the New Glenn vehicle is advancing through operational phases toward its third launch.
Blue Origin and AST SpaceMobile are collaborating on an orbital launch in which New Glenn will carry the BlueBird payload.
Integrating the BlueBird payload into the fairing simplifies subsequent mating operations with the New Glenn launch vehicle and enables final checks before pad integration.
New Glenn remains in a four-flight certification process required for the National Security Space Launch Phase 3 contract.
Blue Origin is redirecting resources toward the Blue Moon lunar lander program and accelerating New Glenn’s launch manifest.
Blue Origin cannot fly its seven awarded high-value NSSL Phase 3 missions until New Glenn achieves full Space Systems Command certification.
New Glenn completed its first two missions in 2025, including the landing of a first-stage booster in November 2025.
New Glenn is an orbital launch vehicle developed by Blue Origin.
AST SpaceMobile’s Block 2 BlueBird satellite was integrated into the third New Glenn fairing.
The integration of Block 2 BlueBird into a New Glenn fairing reflects an industrial collaboration between AST SpaceMobile and Blue Origin.
New Glenn is a launch vehicle operated by Blue Origin.
BlueBird 7 (BB7) is encapsulated within Blue Origin’s New Glenn launch vehicle.
AST SpaceMobile has completed the handoff of BlueBird 7 to Blue Origin for integration on New Glenn.
BlueBird 7 (BB7) is encapsulated within Blue Origin’s New Glenn launch vehicle.
Only one satellite (BlueBird 7) is on board this accelerated New Glenn launch slot.
Future New Glenn launches can carry up to six to eight satellites per launch.
BlueBird 7 is encapsulated inside Blue Origin’s New Glenn fairing and preparing for launch next month.