Vehicle family profile

New Glenn

Family-level launch record combining canonical variants, historical missions, public cadence forecasts, and available payload performance specs.

Blue OriginActive
Admin
Variants
1
Canonical variants linked to this family.
Historical missions
3
Missions in the public mission table with actual launch dates.
Peak listed capacity
45,000 kg
Maximum payload capacity across listed variants and orbits.

Launch Cadence

Historical missions are grouped by actual launch year. Forecast cadence uses family-level launch-rate rows.

YearHistorical missionsForecast launches
202520
202613
202705
202808
2029011
2030014
2031018
2032022
2033024
2034024
2035024
2036024
2037024
2038024
2039024
2040024
2041024

Performance Specs

Payload capacity by variant and target orbit when structured capacity rows are available.

VariantOrbitCapacityAltitudeInclinationSource
New Glenn 7x2
LEO45,000 kgUnknownUnknownBlue Origin New Glenn vehicle page
New Glenn 7x2
GTO13,600 kgUnknownUnknownBlue Origin New Glenn vehicle page

Recent Missions

Latest launched missions using variants in this family.

MissionVariantLaunch
SpaceMobile-007 Mission
New Glenn 7x2
Apr 19, 2026
ESCAPADE
New Glenn 7x2
Nov 13, 2025
Blue Ring Pathfinder Mission
New Glenn 7x2
Jan 16, 2025

Forecasted Missions

Upcoming mission rows with announced launch timing.

MissionVariant

Variants

Canonical variants rolled up into this launch vehicle family.

VariantStagesMissionsStatus
New Glenn 7x2
Not stated3Active

Forecast Location Split

2 launch locations represented.

YearLocationLaunchesConfidenceBasis
2026Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida)350%New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, fa...
2026Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California)045%Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a...
2027Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida)550%New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, fa...
2027Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California)045%Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a...
2028Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida)850%New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, fa...
2028Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California)045%Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a...
2029Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida)1050%New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, fa...
2029Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California)145%Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a...
2030Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida)1250%New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, fa...
2030Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California)245%Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a...
2031Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida)1450%New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, fa...
2031Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California)445%Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a...
2032Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida)1650%New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, fa...
2032Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California)645%Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a...
2033Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida)1650%New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, fa...
2033Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California)845%Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a...
2034Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida)1650%New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, fa...
2034Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California)845%Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a...
2035Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida)1650%New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, fa...
2035Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California)845%Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a...
2036Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida)1650%New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, fa...
2036Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California)845%Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a...
2037Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida)1650%New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, fa...
2037Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California)845%Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a...
Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida)
2026 · 50% confidence
3

New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, factory flow, and cust...

Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California)
2026 · 45% confidence
0

Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a multi-year ramp.

Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida)
2027 · 50% confidence
5

New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, factory flow, and cust...

Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California)
2027 · 45% confidence
0

Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a multi-year ramp.

Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida)
2028 · 50% confidence
8
New Glenn 7x2
TLI
7,000 kg
Unknown
Unknown
Wikipedia New Glenn (citing Blue Origin official specs)
Announced

No forecasted missions

No upcoming announced mission rows are linked to this vehicle family.

Track

New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, factory flow, and cust...

Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California)
2028 · 45% confidence
0

Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a multi-year ramp.

Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida)
2029 · 50% confidence
10

New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, factory flow, and cust...

Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California)
2029 · 45% confidence
1

Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a multi-year ramp.

Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida)
2030 · 50% confidence
12

New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, factory flow, and cust...

Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California)
2030 · 45% confidence
2

Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a multi-year ramp.

Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida)
2031 · 50% confidence
14

New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, factory flow, and cust...

Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California)
2031 · 45% confidence
4

Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a multi-year ramp.

Mentions
883
All verified mentions of this launch vehicle family in source documents.
0.0-5.0
Actions

New Glenn-3 fairings jettison occurs 3 minutes and 42 seconds after liftoff.

PlanCapabilityValue 3.0Apr 18, 2026RT by @GewoonLukas_: Check out the New Glenn-3 mission timeline. pic.

New Glenn-3 SECO-1 occurs 13 minutes and 1 second after liftoff.

Page12of45
PlanValue 2.0Apr 18, 2026RT by @GewoonLukas_: Check out the New Glenn-3 mission timeline. pic.

New Glenn-3 water deluge systems turn on 30 seconds before liftoff.

CapabilityValue 4.0Apr 18, 2026RT by @GewoonLukas_: Check out the New Glenn-3 mission timeline. pic.

New Glenn-3 autopilot is enabled 30 seconds before liftoff.

CapabilityPlanValue 4.0Apr 18, 2026RT by @GewoonLukas_: Check out the New Glenn-3 mission timeline. pic.

New Glenn-3 SECO-2 occurs 1 hour 10 minutes and 49 seconds after liftoff.

GeneralValue 1.0Apr 18, 2026RT by @GewoonLukas_: Check out the New Glenn-3 mission timeline. pic.

New Glenn-3 propellant loading completes and replenishment begins about 45 minutes before liftoff.

PlanGeneralValue 4.0Apr 18, 2026RT by @GewoonLukas_: Check out the New Glenn-3 mission timeline. pic.

Blue Origin’s New Glenn booster GS1-7E02, named "Never Tell Me The Odds," fired up ahead of reflight on the NG-3 mission.

PlanValue 3.5Apr 16, 2026HOTFIRE! 🔥 New Glenn booster GS1-7E02 "Never Tell Me The Odds" fires up ahead of reflight on the NG-3 mission! 📸

Blue Origin is preparing to load New Glenn with propellant for a hotfire in preparation for the NG-3 mission.

PlanCapabilityValue 4.0Apr 14, 2026There is condensation visible around New Glenn, and both flare stacks are very active, so propellant load is underway! 📸

Blue Origin is preparing to load New Glenn with propellant for a hotfire at Launch Complex 36.

PlanCapabilityValue 4.0Apr 14, 2026The flare stack at Launch Complex 36 has just become active, indicating that Blue Origin is preparing to load New Glenn with propellant for a hotfire in preparation of the NG-3 mission. 📸 pic.

Blue Origin’s New Glenn was being loaded with propellants for a hotfire ahead of the NG-3 mission.

PlanCapabilityValue 4.0Apr 14, 2026Blue Origin's landing barge, Landing Platform Vessel #1 named "Jacklyn", and support ship Harvey Stone depart Port Canaveral while New Glenn is being loaded with propellants for a hotfire ahead of the NG-3 mission. 📸

New Glenn was vertical at Launch Complex 36.

PlanGeneralValue 2.0Apr 14, 2026RT by @GewoonLukas_: Blue Origin's landing vessel Jacklyn is departing Port Canaveral in support of New Glenn's third launch! Will they stick the landing twice in a row? pic.

Blue Origin’s New Glenn was undergoing propellant loading.

PlanGeneralValue 2.2Apr 14, 2026It has now been almost 6.5 hours since Blue Origin was well into propellant load, and no hotfire has occured so far. Given that the countdown is 4.5 hours, it's unlikely we'll see a hotfire today and the attempt has likely been scrubbed.

Blue Origin's landing vessel Jacklyn is departing Port Canaveral in support of New Glenn's third launch.

PlanGeneralValue 3.0Apr 14, 2026RT by @GewoonLukas_: Blue Origin's landing vessel Jacklyn is departing Port Canaveral in support of New Glenn's third launch! Will they stick the landing twice in a row? pic.

Condensation is visible around New Glenn during propellant loading.

CapabilityPlanValue 1.8Apr 14, 2026There is condensation visible around New Glenn, and both flare stacks are very active, so propellant load is underway! 📸

No hotfire had occurred for Blue Origin’s New Glenn after 6.5 hours of propellant loading, with 4.5 hours remaining in the countdown.

PlanGeneralValue 4.0Apr 14, 2026It has now been almost 6.5 hours since Blue Origin was well into propellant load, and no hotfire has occured so far. Given that the countdown is 4.5 hours, it's unlikely we'll see a hotfire today and the attempt has likely been scrubbed.

Blue Origin’s New Glenn is standing on the launch pad ahead of a hotfire test.

PlanCapabilityValue 2.5Apr 13, 2026Wen fire

The vehicle on the LC-36 pad is Blue Origin’s New Glenn rocket.

CapabilityGeneralValue 2.2Apr 13, 2026RT by @GewoonLukas_: Welcome back to LC-36, "Never Tell Me The Odds." Next up: NG-3 hotfire 🔥 pic.

Blue Origin's New Glenn rocket is on the launch pad.

PlanCapabilityValue 2.0Apr 13, 2026Big target:

Blue Origin's New Glenn rocket is at LC-36.

GeneralValue 2.5Apr 13, 2026*cue random aerospace company sniper nearby*

New Glenn went vertical at Launch Complex 36 for a static fire ahead of the NG-3 mission.

PlanCapabilityValue 4.0Apr 13, 2026After being rolled out on April 11th, New Glenn finally went vertical last night at LC-36 for a static fire ahead of the NG-3 mission. According to the FAA's Current Operations Plan Advisory, the launch is now set for NET April 17th at 10:45 UTC. 📸