Family-level launch record combining canonical variants, historical missions, public cadence forecasts, and available payload performance specs.
Historical missions are grouped by actual launch year. Forecast cadence uses family-level launch-rate rows.
| Year | Historical missions | Forecast launches |
|---|---|---|
| 2025 | 2 | 0 |
| 2026 | 1 | 3 |
| 2027 | 0 | 5 |
| 2028 | 0 | 8 |
| 2029 | 0 | 11 |
| 2030 | 0 | 14 |
| 2031 | 0 | 18 |
| 2032 | 0 | 22 |
| 2033 | 0 | 24 |
| 2034 | 0 | 24 |
| 2035 | 0 | 24 |
| 2036 | 0 | 24 |
| 2037 | 0 | 24 |
| 2038 | 0 | 24 |
| 2039 | 0 | 24 |
| 2040 | 0 | 24 |
| 2041 | 0 | 24 |
Payload capacity by variant and target orbit when structured capacity rows are available.
| Variant | Orbit | Capacity | Altitude | Inclination | Source |
|---|---|---|---|---|---|
New Glenn 7x2 | LEO | 45,000 kg | Unknown | Unknown | Blue Origin New Glenn vehicle page |
New Glenn 7x2 | GTO | 13,600 kg | Unknown | Unknown | Blue Origin New Glenn vehicle page |
Latest launched missions using variants in this family.
| Mission | Variant | Launch |
|---|---|---|
| SpaceMobile-007 Mission | New Glenn 7x2 | Apr 19, 2026 |
| ESCAPADE | New Glenn 7x2 | Nov 13, 2025 |
| Blue Ring Pathfinder Mission | New Glenn 7x2 | Jan 16, 2025 |
Upcoming mission rows with announced launch timing.
| Mission | Variant |
|---|
Canonical variants rolled up into this launch vehicle family.
| Variant | Stages | Missions | Status |
|---|---|---|---|
New Glenn 7x2 | Not stated | 3 | Active |
2 launch locations represented.
| Year | Location | Launches | Confidence | Basis |
|---|---|---|---|---|
| 2026 | Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida) | 3 | 50% | New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, fa... |
| 2026 | Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California) | 0 | 45% | Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a... |
| 2027 | Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida) | 5 | 50% | New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, fa... |
| 2027 | Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California) | 0 | 45% | Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a... |
| 2028 | Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida) | 8 | 50% | New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, fa... |
| 2028 | Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California) | 0 | 45% | Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a... |
| 2029 | Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida) | 10 | 50% | New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, fa... |
| 2029 | Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California) | 1 | 45% | Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a... |
| 2030 | Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida) | 12 | 50% | New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, fa... |
| 2030 | Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California) | 2 | 45% | Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a... |
| 2031 | Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida) | 14 | 50% | New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, fa... |
| 2031 | Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California) | 4 | 45% | Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a... |
| 2032 | Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida) | 16 | 50% | New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, fa... |
| 2032 | Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California) | 6 | 45% | Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a... |
| 2033 | Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida) | 16 | 50% | New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, fa... |
| 2033 | Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California) | 8 | 45% | Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a... |
| 2034 | Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida) | 16 | 50% | New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, fa... |
| 2034 | Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California) | 8 | 45% | Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a... |
| 2035 | Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida) | 16 | 50% | New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, fa... |
| 2035 | Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California) | 8 | 45% | Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a... |
| 2036 | Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida) | 16 | 50% | New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, fa... |
| 2036 | Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California) | 8 | 45% | Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a... |
| 2037 | Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida) | 16 | 50% | New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, fa... |
| 2037 | Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California) | 8 | 45% | Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a... |
New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, factory flow, and cust...
Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a multi-year ramp.
New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, factory flow, and cust...
Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a multi-year ramp.
New Glenn 7x2 |
| TLI |
| 7,000 kg |
| Unknown |
| Unknown |
| Wikipedia New Glenn (citing Blue Origin official specs) |
| Announced |
|---|
No forecasted missionsNo upcoming announced mission rows are linked to this vehicle family. |
New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, factory flow, and cust...
Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a multi-year ramp.
New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, factory flow, and cust...
Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a multi-year ramp.
New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, factory flow, and cust...
Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a multi-year ramp.
New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, factory flow, and cust...
Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a multi-year ramp.
Blue Origin's New Glenn reached main engine cut-off and stage separation on April 19, 2026.
Blue Origin’s New Glenn is undergoing propellant loading.
Blue Origin’s New Glenn second stage and payload are now in orbit.
Blue Origin aims to conduct eight to twelve New Glenn flights in 2026.
AST SpaceMobile’s BlueBird 7 launched on Blue Origin’s New Glenn launch vehicle on April 19, 2026.
New Glenn Mission NG-3 included a booster landing burn before touchdown.
Blue Origin’s New Glenn is fueled for its third mission carrying AST SpaceMobile’s BlueBird 7 satellite.
New Glenn’s second stage engine cutoff was confirmed.
Blue Origin’s New Glenn 3 mission launched from LC-36 in Florida.
Project Quartz is designed to support Blue Origin’s New Glenn heavy-lift rocket and Blue Ring orbital logistics vehicle.
Blue Origin’s New Glenn mission NG-3 featured a booster touchdown at T+00:10:40.
Blue Origin’s New Glenn 3 mission had an inclination of 49.4 degrees.
New Glenn was at an altitude of 125,510 feet during mission NG-3.
New Glenn's second stage is scheduled for ignition after the booster coast phase.
The payload on Blue Origin’s New Glenn is branded AST SpaceMobile.
AST SpaceMobile’s BlueBird 7 satellite was a total loss after Blue Origin’s New Glenn 3 released it too low.
Blue Origin's New Glenn mission NG-3 reached maximum dynamic pressure at T+00:02:25.
The NG-3 flight was the first operational demonstration of New Glenn's refurbishment and reuse capabilities.
AST SpaceMobile's BlueBird 7 launched on Blue Origin's New Glenn launch vehicle.
New Glenn-3 nominal ocean impact and end of mission occur 3 hours 5 minutes and 8 seconds after liftoff.