力箭二号
Family-level launch record combining canonical variants, historical missions, public cadence forecasts, and available payload performance specs.
Historical missions are grouped by actual launch year. Forecast cadence uses family-level launch-rate rows.
| Year | Historical missions | Forecast launches |
|---|---|---|
| 2026 | 1 | 0 |
| 2027 | 0 | 0 |
| 2028 | 0 | 0 |
| 2029 | 0 | 1 |
| 2030 | 0 | 2 |
| 2031 | 0 | 3 |
| 2032 | 0 | 4 |
| 2033 | 0 | 5 |
| 2034 | 0 | 6 |
| 2035 | 0 | 8 |
| 2036 | 0 | 8 |
| 2037 | 0 | 8 |
| 2038 | 0 | 8 |
| 2039 | 0 | 8 |
| 2040 | 0 | 8 |
| 2041 | 0 | 1 |
1 launch location represented.
Payload capacity by variant and target orbit when structured capacity rows are available.
| Variant | Orbit | Capacity | Altitude | Inclination | Source |
|---|---|---|---|---|---|
Lijian-2 | LEO | 12,000 kg | Unknown | Unknown | chinese_launch_vehicle_chart_normalized.xlsx (manual screenshot transcription; extraction date 2026-06-02 UTC) |
Lijian-2 | SSO | 8,000 kg | 500 km | Unknown | CAS Space Lijian-2 official launch report |
Lijian-2 | SSO | 8,000 kg | 700 km | Unknown |
Latest launched missions using variants in this family.
| Mission | Variant | Launch |
|---|---|---|
| XZC01/02 | Lijian-2 | Mar 30, 2026 |
Upcoming mission rows with announced launch timing.
| Mission | Variant | Announced |
|---|---|---|
No forecasted missionsNo upcoming announced mission rows are linked to this vehicle family. | ||
Canonical variants rolled up into this launch vehicle family.
| Variant | Stages | Missions | Status |
|---|---|---|---|
Lijian-2 | Not stated | 1 | Active |
| Year | Location | Launches | Confidence | Basis |
|---|---|---|---|---|
| 2026 | Wenchang Commercial Space Launch Site | 0 | 20% | Manual 2026-06-06 review: Lijian-2 treated as future CAS Space/Kinetica family ramp, not a one-launch static placeholder. |
| 2027 | Wenchang Commercial Space Launch Site | 0 | 20% | Manual 2026-06-06 review: Lijian-2 treated as future CAS Space/Kinetica family ramp, not a one-launch static placeholder. |
| 2028 | Wenchang Commercial Space Launch Site | 0 | 20% | Manual 2026-06-06 review: Lijian-2 treated as future CAS Space/Kinetica family ramp, not a one-launch static placeholder. |
| 2029 | Wenchang Commercial Space Launch Site | 1 | 20% | Manual 2026-06-06 review: Lijian-2 treated as future CAS Space/Kinetica family ramp, not a one-launch static placeholder. |
| 2030 | Wenchang Commercial Space Launch Site | 2 | 20% | Manual 2026-06-06 review: Lijian-2 treated as future CAS Space/Kinetica family ramp, not a one-launch static placeholder. |
| 2031 | Wenchang Commercial Space Launch Site | 3 | 25% | Manual 2026-06-06 review: Lijian-2 treated as future CAS Space/Kinetica family ramp, not a one-launch static placeholder. |
| 2032 | Wenchang Commercial Space Launch Site | 4 | 25% | Manual 2026-06-06 review: Lijian-2 treated as future CAS Space/Kinetica family ramp, not a one-launch static placeholder. |
| 2033 | Wenchang Commercial Space Launch Site | 5 | 25% | Manual 2026-06-06 review: Lijian-2 treated as future CAS Space/Kinetica family ramp, not a one-launch static placeholder. |
| 2034 | Wenchang Commercial Space Launch Site | 6 | 25% | Manual 2026-06-06 review: Lijian-2 treated as future CAS Space/Kinetica family ramp, not a one-launch static placeholder. |
| 2035 | Wenchang Commercial Space Launch Site | 8 | 30% | Manual 2026-06-06 review: Lijian-2 treated as future CAS Space/Kinetica family ramp, not a one-launch static placeholder. |
| 2036 | Wenchang Commercial Space Launch Site | 8 | 30% | Manual 2026-06-06 review: Lijian-2 treated as future CAS Space/Kinetica family ramp, not a one-launch static placeholder. |
| 2037 | Wenchang Commercial Space Launch Site | 8 | 30% | Manual 2026-06-06 review: Lijian-2 treated as future CAS Space/Kinetica family ramp, not a one-launch static placeholder. |
| 2038 | Wenchang Commercial Space Launch Site | 8 | 30% | Manual 2026-06-06 review: Lijian-2 treated as future CAS Space/Kinetica family ramp, not a one-launch static placeholder. |
| 2039 | Wenchang Commercial Space Launch Site | 8 | 30% | Manual 2026-06-06 review: Lijian-2 treated as future CAS Space/Kinetica family ramp, not a one-launch static placeholder. |
| 2040 | Wenchang Commercial Space Launch Site | 8 | 30% | Manual 2026-06-06 review: Lijian-2 treated as future CAS Space/Kinetica family ramp, not a one-launch static placeholder. |
| 2041 | Wenchang Commercial Space Launch Site | 1 | 25% | Catalog-completeness placeholder for active Lijian-2/Kinetica-2 family; not used by latest forecast capacity snapshot. |
Manual 2026-06-06 review: Lijian-2 treated as future CAS Space/Kinetica family ramp, not a one-launch static placeholder.
Manual 2026-06-06 review: Lijian-2 treated as future CAS Space/Kinetica family ramp, not a one-launch static placeholder.
Manual 2026-06-06 review: Lijian-2 treated as future CAS Space/Kinetica family ramp, not a one-launch static placeholder.
Manual 2026-06-06 review: Lijian-2 treated as future CAS Space/Kinetica family ramp, not a one-launch static placeholder.
Manual 2026-06-06 review: Lijian-2 treated as future CAS Space/Kinetica family ramp, not a one-launch static placeholder.
Manual 2026-06-06 review: Lijian-2 treated as future CAS Space/Kinetica family ramp, not a one-launch static placeholder.
Manual 2026-06-06 review: Lijian-2 treated as future CAS Space/Kinetica family ramp, not a one-launch static placeholder.
Manual 2026-06-06 review: Lijian-2 treated as future CAS Space/Kinetica family ramp, not a one-launch static placeholder.
Manual 2026-06-06 review: Lijian-2 treated as future CAS Space/Kinetica family ramp, not a one-launch static placeholder.
Manual 2026-06-06 review: Lijian-2 treated as future CAS Space/Kinetica family ramp, not a one-launch static placeholder.
Manual 2026-06-06 review: Lijian-2 treated as future CAS Space/Kinetica family ramp, not a one-launch static placeholder.
Manual 2026-06-06 review: Lijian-2 treated as future CAS Space/Kinetica family ramp, not a one-launch static placeholder.
| chinese_launch_vehicle_chart_normalized.xlsx (manual screenshot transcription; extraction date 2026-06-02 UTC) |
The Zhejiang super factory will complement CAS Space’s existing facility in Guangzhou, Guangdong Province for Kinetica-2 production.
CAS Space plans around ten Kinetica-2 flights before the end of 2028.
CAS Space plans to fly Kinetica-2 from the Wenchang Commercial Space Launch Site after an integration facility is built there.
Kinetica-2’s second stage is significantly less complex and requires fewer materials than the first stage.
CAS Space plans to produce twelve Kinetica-2 launch vehicles per year at the super factory.
Those ten Kinetica-2 flights are intended to demonstrate reusable rocket technologies, including aerodynamic control during descent, first-stage engine reignition in flight, and landing attempts.
CAS Space expects a Kinetica-2 launch vehicle to be completed every two months through parallel production at the super factory.
A new mega-factory for the Lijian-2 carrier rocket has been completed.
The CAS Space super factory is designed to increase production capacity for the tri-core Kinetica-2 launch vehicle.
The Lijian-2 Y1 mission placed three satellites into orbit.
One of the three Lijian-2 Y1 payloads was a test vehicle for the Qingzhou cargo spacecraft.
China launched the Lijian-2 Y1 rocket successfully on March 30.
Kinetica-2 will integrate Kinecore technologies, including multiple engine firings, thrust control, and cluster recovery, on its fourth through seventh launches.
The suborbital Lihong rocket will assist with characterizing and testing relevant reusable-rocket technologies for Kinetica-2.
CAS Space debuted its tri-core Kinetica-2 launch vehicle on a mission from the Jiuquan Satellite Launch Center that placed a prototype Qingzhou cargo spacecraft into orbit.
CAS Space expects to produce twenty Kinetica-2 launch vehicles per year after its new super factory opens in Shaoxing, Zhejiang province.
CAS Space says Kinetica-2 missions could cost 252.5 million yuan, or $37 million, once first-stage reuse is understood.
CAS Space aims to obtain reusable first stages for Kinetica-2 by 2028.
CAS Space has compared that projected Kinetica-2 mission cost to about half the cost of SpaceX’s partially reusable Falcon 9.
Kinetica-2 will use a full grid-fin system on its third launch to control aerodynamic reentry.