Family-level launch record combining canonical variants, historical missions, public cadence forecasts, and available payload performance specs.
Historical missions are grouped by actual launch year. Forecast cadence uses family-level launch-rate rows.
| Year | Historical missions | Forecast launches |
|---|---|---|
| 2023 | 2 | 0 |
| 2024 | 4 | 0 |
| 2025 | 5 | 0 |
| 2026 | 1 | 3 |
| 2027 | 0 | 7 |
| 2028 | 0 | 15 |
| 2029 | 0 | 31 |
| 2030 | 0 | 50 |
| 2031 | 0 | 71 |
| 2032 | 0 | 87 |
| 2033 | 0 | 103 |
| 2034 | 0 | 117 |
| 2035 | 0 | 129 |
| 2036 | 0 | 133 |
| 2037 | 0 | 137 |
| 2038 | 0 | 137 |
| 2039 | 0 | 137 |
Payload capacity by variant and target orbit when structured capacity rows are available.
| Variant | Orbit | Capacity | Altitude | Inclination | Source |
|---|---|---|---|---|---|
Starship V3 | LEO | 150,000 kg | Unknown | Unknown | Starlink V3 batch-calibrated Starship capacity assumption |
Starship V2 | LEO | 35,000 kg | Unknown | Unknown | SpaceX Starship - Wikipedia |
Latest launched missions using variants in this family.
| Mission | Variant | Launch |
|---|---|---|
| Launch 2026-U02 | Starship V3 | May 22, 2026 |
| Launch 2025-U04 | Starship V2 | Oct 13, 2025 |
| Launch 2025-U03 | Starship V2 | Aug 26, 2025 |
| Launch 2025-U02 |
Canonical variants rolled up into this launch vehicle family.
| Variant | Stages | Missions | Status |
|---|---|---|---|
Starship V1.0 | Not stated | 6 | Active |
Starship V2 | Not stated | 5 | Retired |
Starship V3 | Not stated | 1 | Active |
| 2040 | 0 | 137 |
| 2041 | 0 | 137 |
5 launch locations represented.
| Year | Location | Launches | Confidence | Basis |
|---|---|---|---|---|
| 2026 | Space Launch Complex 37B, Cape Canaveral (Cape Canaveral Air Station, Florida) | 0 | 50% | SLC-37B is modeled as the first high-throughput CCSFS Starship pad. Base reaches half of the SLC-37 complex cap by 2035, not immediately after redevelopment. |
| 2026 | Cape Canaveral Space Force Station | SLC-37A | 0 | 45% | Modeled as second SLC-37 Starship pad, lagging SLC-37B by one to two years. Mature split reaches 38/year by 2037, keeping complex total at 76/year. |
| 2026 | Launch Complex 39A, NASA Kennedy Space Center, Florida (NASA John F. Kennedy Space Center, Florida) | 0 | 65% | LC-39A Starship is expected to ramp after initial Florida infrastructure/testing. Base remains below the 44/year EIS cap even after maturity to reflect range c... |
| 2026 | Starship Orbital Pad 1, Boca Chica (Starbase, Boca Chica Beach, Texas) | 3 | 65% | Starbase remains the development and early operational hub. Base ramps slowly from test cadence to routine operations; by 2031 it is one of two pads sharing th... |
| 2026 | Starship Orbital Pad 2, Boca Chica (Starbase, Boca Chica Beach, Texas) | 0 | 50% | Second Starbase pad provides incremental operations after pad commissioning. Mature OLP-A + OLP-B total is capped at 25/year in the base/high range. |
| 2027 | Space Launch Complex 37B, Cape Canaveral (Cape Canaveral Air Station, Florida) | 0 | 50% | SLC-37B is modeled as the first high-throughput CCSFS Starship pad. Base reaches half of the SLC-37 complex cap by 2035, not immediately after redevelopment. |
| 2027 | Launch Complex 39A, NASA Kennedy Space Center, Florida (NASA John F. Kennedy Space Center, Florida) | 1 | 65% | LC-39A Starship is expected to ramp after initial Florida infrastructure/testing. Base remains below the 44/year EIS cap even after maturity to reflect range c... |
| 2027 | Starship Orbital Pad 1, Boca Chica (Starbase, Boca Chica Beach, Texas) | 5 | 65% | Starbase remains the development and early operational hub. Base ramps slowly from test cadence to routine operations; by 2031 it is one of two pads sharing th... |
| 2027 | Starship Orbital Pad 2, Boca Chica (Starbase, Boca Chica Beach, Texas) | 1 | 50% | Second Starbase pad provides incremental operations after pad commissioning. Mature OLP-A + OLP-B total is capped at 25/year in the base/high range. |
| 2027 | Cape Canaveral Space Force Station | SLC-37A | 0 | 45% | Modeled as second SLC-37 Starship pad, lagging SLC-37B by one to two years. Mature split reaches 38/year by 2037, keeping complex total at 76/year. |
| 2028 | Space Launch Complex 37B, Cape Canaveral (Cape Canaveral Air Station, Florida) | 2 | 50% | SLC-37B is modeled as the first high-throughput CCSFS Starship pad. Base reaches half of the SLC-37 complex cap by 2035, not immediately after redevelopment. |
| 2028 | Launch Complex 39A, NASA Kennedy Space Center, Florida (NASA John F. Kennedy Space Center, Florida) | 3 | 65% | LC-39A Starship is expected to ramp after initial Florida infrastructure/testing. Base remains below the 44/year EIS cap even after maturity to reflect range c... |
| 2028 | Starship Orbital Pad 1, Boca Chica (Starbase, Boca Chica Beach, Texas) | 7 | 65% | Starbase remains the development and early operational hub. Base ramps slowly from test cadence to routine operations; by 2031 it is one of two pads sharing th... |
| 2028 | Starship Orbital Pad 2, Boca Chica (Starbase, Boca Chica Beach, Texas) | 3 | 50% | Second Starbase pad provides incremental operations after pad commissioning. Mature OLP-A + OLP-B total is capped at 25/year in the base/high range. |
| 2028 | Cape Canaveral Space Force Station | SLC-37A | 0 | 45% | Modeled as second SLC-37 Starship pad, lagging SLC-37B by one to two years. Mature split reaches 38/year by 2037, keeping complex total at 76/year. |
| 2029 | Space Launch Complex 37B, Cape Canaveral (Cape Canaveral Air Station, Florida) | 6 | 50% | SLC-37B is modeled as the first high-throughput CCSFS Starship pad. Base reaches half of the SLC-37 complex cap by 2035, not immediately after redevelopment. |
| 2029 | Launch Complex 39A, NASA Kennedy Space Center, Florida (NASA John F. Kennedy Space Center, Florida) | 8 | 65% | LC-39A Starship is expected to ramp after initial Florida infrastructure/testing. Base remains below the 44/year EIS cap even after maturity to reflect range c... |
| 2029 | Starship Orbital Pad 1, Boca Chica (Starbase, Boca Chica Beach, Texas) | 8 | 65% | Starbase remains the development and early operational hub. Base ramps slowly from test cadence to routine operations; by 2031 it is one of two pads sharing th... |
| 2029 | Starship Orbital Pad 2, Boca Chica (Starbase, Boca Chica Beach, Texas) | 7 | 50% | Second Starbase pad provides incremental operations after pad commissioning. Mature OLP-A + OLP-B total is capped at 25/year in the base/high range. |
| 2029 | Cape Canaveral Space Force Station | SLC-37A | 2 | 45% | Modeled as second SLC-37 Starship pad, lagging SLC-37B by one to two years. Mature split reaches 38/year by 2037, keeping complex total at 76/year. |
| 2030 | Space Launch Complex 37B, Cape Canaveral (Cape Canaveral Air Station, Florida) | 12 | 50% | SLC-37B is modeled as the first high-throughput CCSFS Starship pad. Base reaches half of the SLC-37 complex cap by 2035, not immediately after redevelopment. |
| 2030 | Launch Complex 39A, NASA Kennedy Space Center, Florida (NASA John F. Kennedy Space Center, Florida) | 12 | 65% | LC-39A Starship is expected to ramp after initial Florida infrastructure/testing. Base remains below the 44/year EIS cap even after maturity to reflect range c... |
| 2030 | Starship Orbital Pad 1, Boca Chica (Starbase, Boca Chica Beach, Texas) | 9 | 65% | Starbase remains the development and early operational hub. Base ramps slowly from test cadence to routine operations; by 2031 it is one of two pads sharing th... |
| 2030 | Starship Orbital Pad 2, Boca Chica (Starbase, Boca Chica Beach, Texas) | 11 | 50% | Second Starbase pad provides incremental operations after pad commissioning. Mature OLP-A + OLP-B total is capped at 25/year in the base/high range. |
SLC-37B is modeled as the first high-throughput CCSFS Starship pad. Base reaches half of the SLC-37 complex cap by 2035, not immediately after redevelopment.
Modeled as second SLC-37 Starship pad, lagging SLC-37B by one to two years. Mature split reaches 38/year by 2037, keeping complex total at 76/year.
LC-39A Starship is expected to ramp after initial Florida infrastructure/testing. Base remains below the 44/year EIS cap even after maturity to reflect range conflicts, tanker ope...
Starbase remains the development and early operational hub. Base ramps slowly from test cadence to routine operations; by 2031 it is one of two pads sharing the 25/year site cap.
Second Starbase pad provides incremental operations after pad commissioning. Mature OLP-A + OLP-B total is capped at 25/year in the base/high range.
Starship V3 | TLI | 21,000 kg | Unknown | Unknown | SpaceX Starship public vehicle page |
Starship V1.0 | LEO | 15,000 kg | Unknown | Unknown | SpaceX Starship public/current block summary |
Starship V2 |
| May 27, 2025 |
| Launch 2025-F03 | Starship V2 | Mar 6, 2025 |
| Launch 2025-F01 | Starship V2 | Jan 16, 2025 |
| Launch 2024-U06 | Starship V1.0 | Nov 19, 2024 |
| Launch 2024-U04 | Starship V1.0 | Oct 13, 2024 |
Upcoming mission rows with announced launch timing.
| Mission | Variant | Announced |
|---|---|---|
No forecasted missionsNo upcoming announced mission rows are linked to this vehicle family. | ||
SLC-37B is modeled as the first high-throughput CCSFS Starship pad. Base reaches half of the SLC-37 complex cap by 2035, not immediately after redevelopment.
LC-39A Starship is expected to ramp after initial Florida infrastructure/testing. Base remains below the 44/year EIS cap even after maturity to reflect range conflicts, tanker ope...
Starbase remains the development and early operational hub. Base ramps slowly from test cadence to routine operations; by 2031 it is one of two pads sharing the 25/year site cap.
Second Starbase pad provides incremental operations after pad commissioning. Mature OLP-A + OLP-B total is capped at 25/year in the base/high range.
Modeled as second SLC-37 Starship pad, lagging SLC-37B by one to two years. Mature split reaches 38/year by 2037, keeping complex total at 76/year.
SLC-37B is modeled as the first high-throughput CCSFS Starship pad. Base reaches half of the SLC-37 complex cap by 2035, not immediately after redevelopment.
LC-39A Starship is expected to ramp after initial Florida infrastructure/testing. Base remains below the 44/year EIS cap even after maturity to reflect range conflicts, tanker ope...
Nick Cummings, senior director of program development at SpaceX, indicated during the FAA Commercial Space Transportation Conference on 2024-02-21 that the upcoming Starship launch will include a propellant transfer test within Starship.
SpaceX has four sets of Starship and Super Heavy vehicles already built at Starbase ready for upcoming flights.
SpaceX's Starship vehicle failed to complete its mission profiles during its first two test flights.
SpaceX aims for Starship to have a launch readiness time of one hour, significantly faster than current launch systems.
Gary Henry from SpaceX stated that Starship could begin a cost trajectory at $200 per kilogram for launches.
Starship's operational cost could potentially drop to $20 per kilogram to low Earth orbit due to reductions in fuel costs.
SpaceX's Starship is proposed for high-speed point-to-point transportation of cargo for military operations and humanitarian relief.
Starship could deliver 30 metric tons of cargo and has a cargo bay similar in volume to a C-17 aircraft.
SpaceX would modify, reuse, or demolish the existing SLC-37 infrastructure to support Starship-Super Heavy launch and landing operations.
The U.S. Space Force is preparing environmental studies that could lead to SpaceX Starship launches from Cape Canaveral Space Force Station.
SpaceX is building a Starship launch pad at Kennedy Space Center Launch Complex 39A adjacent to the existing Falcon 9 and Falcon Heavy pad.
The EIS will include a no-action alternative where no Starship launch sites are built at either SLC-37 or SLC-50.
Kennedy Space Center prepared an environmental review in December 2021 to construct a Starship launch complex at LC-49 on the northern end of KSC property, and that LC-49 study is currently on hold.
The EIS will examine an alternative that builds a new Starship launch complex designated SLC-50 located between SLC-37 and SLC-40.
SpaceX currently has one Starship launch pad at its Starbase site in South Texas and plans to build a second Starship launch pad at Starbase.
Starship delivery robots are deployed in 80 locations across the world, including the US, UK, Germany, Denmark, Estonia, and Finland.
The report assumed a launch cost of $1,000 per kilogram for the Starship, despite projections of future costs as low as $20 to $30 per kilogram.
SpaceX's Starship was assumed for launching the SBSP systems, accounting for over 70% of the total costs.
Starship is still in development and SpaceX conducted two Starship test flights in 2023 and was planning a third test flight 2024-02.
Starlab Space selected SpaceX’s Starship to launch the Starlab commercial space station on a single flight.