Vehicle family profile

Starship

Family-level launch record combining canonical variants, historical missions, public cadence forecasts, and available payload performance specs.

SpaceXActive
Admin
Variants
3
Canonical variants linked to this family.
Historical missions
12
Missions in the public mission table with actual launch dates.
Peak listed capacity
150,000 kg
Maximum payload capacity across listed variants and orbits.

Launch Cadence

Historical missions are grouped by actual launch year. Forecast cadence uses family-level launch-rate rows.

YearHistorical missionsForecast launches
202320
202440
202550
202613
202707
2028015
2029031
2030050
2031071
2032087
20330103
20340117
20350129
20360133
20370137
20380137
20390137

Performance Specs

Payload capacity by variant and target orbit when structured capacity rows are available.

VariantOrbitCapacityAltitudeInclinationSource
Starship V3
LEO150,000 kgUnknownUnknownStarlink V3 batch-calibrated Starship capacity assumption
Starship V2
LEO35,000 kgUnknownUnknownSpaceX Starship - Wikipedia

Recent Missions

Latest launched missions using variants in this family.

MissionVariantLaunch
Launch 2026-U02
Starship V3
May 22, 2026
Launch 2025-U04
Starship V2
Oct 13, 2025
Launch 2025-U03
Starship V2
Aug 26, 2025
Launch 2025-U02

Variants

Canonical variants rolled up into this launch vehicle family.

VariantStagesMissionsStatus
Starship V1.0
Not stated6Active
Starship V2
Not stated5Retired
Starship V3
Not stated1Active
20400137
20410137

Forecast Location Split

5 launch locations represented.

YearLocationLaunchesConfidenceBasis
2026Space Launch Complex 37B, Cape Canaveral (Cape Canaveral Air Station, Florida)050%SLC-37B is modeled as the first high-throughput CCSFS Starship pad. Base reaches half of the SLC-37 complex cap by 2035, not immediately after redevelopment.
2026Cape Canaveral Space Force Station | SLC-37A045%Modeled as second SLC-37 Starship pad, lagging SLC-37B by one to two years. Mature split reaches 38/year by 2037, keeping complex total at 76/year.
2026Launch Complex 39A, NASA Kennedy Space Center, Florida (NASA John F. Kennedy Space Center, Florida)065%LC-39A Starship is expected to ramp after initial Florida infrastructure/testing. Base remains below the 44/year EIS cap even after maturity to reflect range c...
2026Starship Orbital Pad 1, Boca Chica (Starbase, Boca Chica Beach, Texas)365%Starbase remains the development and early operational hub. Base ramps slowly from test cadence to routine operations; by 2031 it is one of two pads sharing th...
2026Starship Orbital Pad 2, Boca Chica (Starbase, Boca Chica Beach, Texas)050%Second Starbase pad provides incremental operations after pad commissioning. Mature OLP-A + OLP-B total is capped at 25/year in the base/high range.
2027Space Launch Complex 37B, Cape Canaveral (Cape Canaveral Air Station, Florida)050%SLC-37B is modeled as the first high-throughput CCSFS Starship pad. Base reaches half of the SLC-37 complex cap by 2035, not immediately after redevelopment.
2027Launch Complex 39A, NASA Kennedy Space Center, Florida (NASA John F. Kennedy Space Center, Florida)165%LC-39A Starship is expected to ramp after initial Florida infrastructure/testing. Base remains below the 44/year EIS cap even after maturity to reflect range c...
2027Starship Orbital Pad 1, Boca Chica (Starbase, Boca Chica Beach, Texas)565%Starbase remains the development and early operational hub. Base ramps slowly from test cadence to routine operations; by 2031 it is one of two pads sharing th...
2027Starship Orbital Pad 2, Boca Chica (Starbase, Boca Chica Beach, Texas)150%Second Starbase pad provides incremental operations after pad commissioning. Mature OLP-A + OLP-B total is capped at 25/year in the base/high range.
2027Cape Canaveral Space Force Station | SLC-37A045%Modeled as second SLC-37 Starship pad, lagging SLC-37B by one to two years. Mature split reaches 38/year by 2037, keeping complex total at 76/year.
2028Space Launch Complex 37B, Cape Canaveral (Cape Canaveral Air Station, Florida)250%SLC-37B is modeled as the first high-throughput CCSFS Starship pad. Base reaches half of the SLC-37 complex cap by 2035, not immediately after redevelopment.
2028Launch Complex 39A, NASA Kennedy Space Center, Florida (NASA John F. Kennedy Space Center, Florida)365%LC-39A Starship is expected to ramp after initial Florida infrastructure/testing. Base remains below the 44/year EIS cap even after maturity to reflect range c...
2028Starship Orbital Pad 1, Boca Chica (Starbase, Boca Chica Beach, Texas)765%Starbase remains the development and early operational hub. Base ramps slowly from test cadence to routine operations; by 2031 it is one of two pads sharing th...
2028Starship Orbital Pad 2, Boca Chica (Starbase, Boca Chica Beach, Texas)350%Second Starbase pad provides incremental operations after pad commissioning. Mature OLP-A + OLP-B total is capped at 25/year in the base/high range.
2028Cape Canaveral Space Force Station | SLC-37A045%Modeled as second SLC-37 Starship pad, lagging SLC-37B by one to two years. Mature split reaches 38/year by 2037, keeping complex total at 76/year.
2029Space Launch Complex 37B, Cape Canaveral (Cape Canaveral Air Station, Florida)650%SLC-37B is modeled as the first high-throughput CCSFS Starship pad. Base reaches half of the SLC-37 complex cap by 2035, not immediately after redevelopment.
2029Launch Complex 39A, NASA Kennedy Space Center, Florida (NASA John F. Kennedy Space Center, Florida)865%LC-39A Starship is expected to ramp after initial Florida infrastructure/testing. Base remains below the 44/year EIS cap even after maturity to reflect range c...
2029Starship Orbital Pad 1, Boca Chica (Starbase, Boca Chica Beach, Texas)865%Starbase remains the development and early operational hub. Base ramps slowly from test cadence to routine operations; by 2031 it is one of two pads sharing th...
2029Starship Orbital Pad 2, Boca Chica (Starbase, Boca Chica Beach, Texas)750%Second Starbase pad provides incremental operations after pad commissioning. Mature OLP-A + OLP-B total is capped at 25/year in the base/high range.
2029Cape Canaveral Space Force Station | SLC-37A245%Modeled as second SLC-37 Starship pad, lagging SLC-37B by one to two years. Mature split reaches 38/year by 2037, keeping complex total at 76/year.
2030Space Launch Complex 37B, Cape Canaveral (Cape Canaveral Air Station, Florida)1250%SLC-37B is modeled as the first high-throughput CCSFS Starship pad. Base reaches half of the SLC-37 complex cap by 2035, not immediately after redevelopment.
2030Launch Complex 39A, NASA Kennedy Space Center, Florida (NASA John F. Kennedy Space Center, Florida)1265%LC-39A Starship is expected to ramp after initial Florida infrastructure/testing. Base remains below the 44/year EIS cap even after maturity to reflect range c...
2030Starship Orbital Pad 1, Boca Chica (Starbase, Boca Chica Beach, Texas)965%Starbase remains the development and early operational hub. Base ramps slowly from test cadence to routine operations; by 2031 it is one of two pads sharing th...
2030Starship Orbital Pad 2, Boca Chica (Starbase, Boca Chica Beach, Texas)1150%Second Starbase pad provides incremental operations after pad commissioning. Mature OLP-A + OLP-B total is capped at 25/year in the base/high range.
Space Launch Complex 37B, Cape Canaveral (Cape Canaveral Air Station, Florida)
2026 · 50% confidence
0

SLC-37B is modeled as the first high-throughput CCSFS Starship pad. Base reaches half of the SLC-37 complex cap by 2035, not immediately after redevelopment.

Cape Canaveral Space Force Station | SLC-37A
2026 · 45% confidence
0

Modeled as second SLC-37 Starship pad, lagging SLC-37B by one to two years. Mature split reaches 38/year by 2037, keeping complex total at 76/year.

Launch Complex 39A, NASA Kennedy Space Center, Florida (NASA John F. Kennedy Space Center, Florida)
2026 · 65% confidence
0

LC-39A Starship is expected to ramp after initial Florida infrastructure/testing. Base remains below the 44/year EIS cap even after maturity to reflect range conflicts, tanker ope...

Starship Orbital Pad 1, Boca Chica (Starbase, Boca Chica Beach, Texas)
2026 · 65% confidence
3

Starbase remains the development and early operational hub. Base ramps slowly from test cadence to routine operations; by 2031 it is one of two pads sharing the 25/year site cap.

Starship Orbital Pad 2, Boca Chica (Starbase, Boca Chica Beach, Texas)
2026 · 50% confidence
0

Second Starbase pad provides incremental operations after pad commissioning. Mature OLP-A + OLP-B total is capped at 25/year in the base/high range.

Starship V3
TLI21,000 kgUnknownUnknownSpaceX Starship public vehicle page
Starship V1.0
LEO15,000 kgUnknownUnknownSpaceX Starship public/current block summary
Starship V2
May 27, 2025
Launch 2025-F03
Starship V2
Mar 6, 2025
Launch 2025-F01
Starship V2
Jan 16, 2025
Launch 2024-U06
Starship V1.0
Nov 19, 2024
Launch 2024-U04
Starship V1.0
Oct 13, 2024

Forecasted Missions

Upcoming mission rows with announced launch timing.

MissionVariantAnnounced

No forecasted missions

No upcoming announced mission rows are linked to this vehicle family.

Track
Space Launch Complex 37B, Cape Canaveral (Cape Canaveral Air Station, Florida)
2027 · 50% confidence
0

SLC-37B is modeled as the first high-throughput CCSFS Starship pad. Base reaches half of the SLC-37 complex cap by 2035, not immediately after redevelopment.

Launch Complex 39A, NASA Kennedy Space Center, Florida (NASA John F. Kennedy Space Center, Florida)
2027 · 65% confidence
1

LC-39A Starship is expected to ramp after initial Florida infrastructure/testing. Base remains below the 44/year EIS cap even after maturity to reflect range conflicts, tanker ope...

Starship Orbital Pad 1, Boca Chica (Starbase, Boca Chica Beach, Texas)
2027 · 65% confidence
5

Starbase remains the development and early operational hub. Base ramps slowly from test cadence to routine operations; by 2031 it is one of two pads sharing the 25/year site cap.

Starship Orbital Pad 2, Boca Chica (Starbase, Boca Chica Beach, Texas)
2027 · 50% confidence
1

Second Starbase pad provides incremental operations after pad commissioning. Mature OLP-A + OLP-B total is capped at 25/year in the base/high range.

Cape Canaveral Space Force Station | SLC-37A
2027 · 45% confidence
0

Modeled as second SLC-37 Starship pad, lagging SLC-37B by one to two years. Mature split reaches 38/year by 2037, keeping complex total at 76/year.

Space Launch Complex 37B, Cape Canaveral (Cape Canaveral Air Station, Florida)
2028 · 50% confidence
2

SLC-37B is modeled as the first high-throughput CCSFS Starship pad. Base reaches half of the SLC-37 complex cap by 2035, not immediately after redevelopment.

Launch Complex 39A, NASA Kennedy Space Center, Florida (NASA John F. Kennedy Space Center, Florida)
2028 · 65% confidence
3

LC-39A Starship is expected to ramp after initial Florida infrastructure/testing. Base remains below the 44/year EIS cap even after maturity to reflect range conflicts, tanker ope...

Mentions
1569
All verified mentions of this launch vehicle family in source documents.
0.0-5.0
Actions

Starship was on a suborbital trajectory that would lead it to splash down in the Indian Ocean.

CapabilityPlanValue 3.0Mar 18, 2024Accelerating Starship

SpaceX estimates it will require around ten to twenty refueling launches for its Starship HLS mission according to various sources.

Page57of79
PlanValue 3.0Mar 18, 2024Accelerating Starship

Starship reached a speed of nearly 26,500 kilometers per hour eight and a half minutes after liftoff.

CapabilityPlanValue 4.0Mar 18, 2024Accelerating Starship

NASA awarded SpaceX $4 billion in contracts to develop lunar lander versions of Starship for its Human Landing System program.

RelationshipsFinancialPlanValue 5.0Mar 18, 2024Accelerating Starship

Elon Musk stated that the Starship upper stage caught fire due to venting excess liquid oxygen.

CapabilityValue 3.5Mar 18, 2024Accelerating Starship

The next flight tests of Starship are intended to gather data for future mission system development.

PlanValue 2.5Mar 18, 2024Accelerating Starship

The second Starship flight completed staging but suffered failures during descent and ascent.

GeneralPlanValue 3.0Mar 18, 2024Accelerating Starship

Starship and Super Heavy are designed to be fully reusable and are capable of launching up to 165,000 kg (150 metric tons) into orbit.

CapabilityGeneralValue 4.0Mar 14, 2024FINAL UPDATE: SpaceX’s Starship 3 successfully soars

The second flight test reached a flight condition where the spacecraft was at approximately 150 km altitude and a velocity near 24,0 m/h, becoming the first Starship to reach outer space in that test sequence.

CapabilityGeneralValue 4.0Mar 14, 2024FINAL UPDATE: SpaceX’s Starship 3 successfully soars

A SpaceX Super Heavy Starship cost $90,000,000 to build in 2024.

FinancialGeneralValue 4.2Mar 14, 2024FINAL UPDATE: SpaceX’s Starship 3 successfully soars

SpaceX’s first integrated Starship flight test occurred on 2023-04-20, with liftoff at 8:33 a.m. CT from Starbase in Texas.

PlanGeneralValue 4.0Mar 14, 2024FINAL UPDATE: SpaceX’s Starship 3 successfully soars

SpaceX launched its third Starship integrated flight test from its South Texas launch site at 9:25 a.m. ET on a Thursday.

PlanValue 4.0Mar 14, 2024FINAL UPDATE: SpaceX’s Starship 3 successfully soars

SpaceX’s second integrated Starship flight test occurred on 2023-11-18, with liftoff at 7:02 a.m. CT from Starbase in Texas.

PlanValue 4.0Mar 14, 2024FINAL UPDATE: SpaceX’s Starship 3 successfully soars

NASA awarded contracts worth about $4,000,000,000 to SpaceX to develop versions of Starship for its Human Landing System program intended for use starting with Artemis 3 as soon as late 2026.

RelationshipsFinancialPlanValue 5.0Mar 14, 2024Starship lifts off on third test flight

Starship and Super Heavy are designed to be fully reusable and are capable of launching up to 165,000 kg (150 metric tons) into orbit.

CapabilityValue 4.5Mar 13, 2024SpaceX’s Starship 3 receives FAA’s authorization to launch tomorrow

Starship’s second flight test reached outer space, reaching an altitude of approximately 150 km and a velocity of approximately 24,0 m/h before vehicle breakup.

PlanCapabilityValue 4.0Mar 13, 2024SpaceX’s Starship 3 receives FAA’s authorization to launch tomorrow

Starship and Super Heavy successfully lifted off for the first time on 2023-04-20 at 8:33 a.m. CT (13:33:09 UTC) from Starbase in Texas.

PlanCapabilityValue 4.0Mar 13, 2024SpaceX’s Starship 3 receives FAA’s authorization to launch tomorrow

A SpaceX Super Heavy Starship cost $90,000,000 to build in 2024.

FinancialGeneralValue 4.0Mar 13, 2024SpaceX’s Starship 3 receives FAA’s authorization to launch tomorrow

Upgrades derived from prior flight tests will debut on the next Starship and Super Heavy vehicles to launch from Starbase on Flight 3.

PlanCapabilityValue 4.0Mar 13, 2024SpaceX’s Starship 3 receives FAA’s authorization to launch tomorrow

SpaceX will launch its Starship/Super Heavy vehicle on its third integrated test flight on Thursday.

PlanValue 4.0Mar 11, 2024Review: The New World on Mars