Family-level launch record combining canonical variants, historical missions, public cadence forecasts, and available payload performance specs.
Historical missions are grouped by actual launch year. Forecast cadence uses family-level launch-rate rows.
| Year | Historical missions | Forecast launches |
|---|---|---|
| 2023 | 2 | 0 |
| 2024 | 4 | 0 |
| 2025 | 5 | 0 |
| 2026 | 1 | 3 |
| 2027 | 0 | 7 |
| 2028 | 0 | 15 |
| 2029 | 0 | 31 |
| 2030 | 0 | 50 |
| 2031 | 0 | 71 |
| 2032 | 0 | 87 |
| 2033 | 0 | 103 |
| 2034 | 0 | 117 |
| 2035 | 0 | 129 |
| 2036 | 0 | 133 |
| 2037 | 0 | 137 |
| 2038 | 0 | 137 |
| 2039 | 0 | 137 |
Payload capacity by variant and target orbit when structured capacity rows are available.
| Variant | Orbit | Capacity | Altitude | Inclination | Source |
|---|---|---|---|---|---|
Starship V3 | LEO | 150,000 kg | Unknown | Unknown | Starlink V3 batch-calibrated Starship capacity assumption |
Starship V2 | LEO | 35,000 kg | Unknown | Unknown | SpaceX Starship - Wikipedia |
Latest launched missions using variants in this family.
| Mission | Variant | Launch |
|---|---|---|
| Launch 2026-U02 | Starship V3 | May 22, 2026 |
| Launch 2025-U04 | Starship V2 | Oct 13, 2025 |
| Launch 2025-U03 | Starship V2 | Aug 26, 2025 |
| Launch 2025-U02 |
Canonical variants rolled up into this launch vehicle family.
| Variant | Stages | Missions | Status |
|---|---|---|---|
Starship V1.0 | Not stated | 6 | Active |
Starship V2 | Not stated | 5 | Retired |
Starship V3 | Not stated | 1 | Active |
| 2040 | 0 | 137 |
| 2041 | 0 | 137 |
5 launch locations represented.
| Year | Location | Launches | Confidence | Basis |
|---|---|---|---|---|
| 2026 | Space Launch Complex 37B, Cape Canaveral (Cape Canaveral Air Station, Florida) | 0 | 50% | SLC-37B is modeled as the first high-throughput CCSFS Starship pad. Base reaches half of the SLC-37 complex cap by 2035, not immediately after redevelopment. |
| 2026 | Cape Canaveral Space Force Station | SLC-37A | 0 | 45% | Modeled as second SLC-37 Starship pad, lagging SLC-37B by one to two years. Mature split reaches 38/year by 2037, keeping complex total at 76/year. |
| 2026 | Launch Complex 39A, NASA Kennedy Space Center, Florida (NASA John F. Kennedy Space Center, Florida) | 0 | 65% | LC-39A Starship is expected to ramp after initial Florida infrastructure/testing. Base remains below the 44/year EIS cap even after maturity to reflect range c... |
| 2026 | Starship Orbital Pad 1, Boca Chica (Starbase, Boca Chica Beach, Texas) | 3 | 65% | Starbase remains the development and early operational hub. Base ramps slowly from test cadence to routine operations; by 2031 it is one of two pads sharing th... |
| 2026 | Starship Orbital Pad 2, Boca Chica (Starbase, Boca Chica Beach, Texas) | 0 | 50% | Second Starbase pad provides incremental operations after pad commissioning. Mature OLP-A + OLP-B total is capped at 25/year in the base/high range. |
| 2027 | Space Launch Complex 37B, Cape Canaveral (Cape Canaveral Air Station, Florida) | 0 | 50% | SLC-37B is modeled as the first high-throughput CCSFS Starship pad. Base reaches half of the SLC-37 complex cap by 2035, not immediately after redevelopment. |
| 2027 | Launch Complex 39A, NASA Kennedy Space Center, Florida (NASA John F. Kennedy Space Center, Florida) | 1 | 65% | LC-39A Starship is expected to ramp after initial Florida infrastructure/testing. Base remains below the 44/year EIS cap even after maturity to reflect range c... |
| 2027 | Starship Orbital Pad 1, Boca Chica (Starbase, Boca Chica Beach, Texas) | 5 | 65% | Starbase remains the development and early operational hub. Base ramps slowly from test cadence to routine operations; by 2031 it is one of two pads sharing th... |
| 2027 | Starship Orbital Pad 2, Boca Chica (Starbase, Boca Chica Beach, Texas) | 1 | 50% | Second Starbase pad provides incremental operations after pad commissioning. Mature OLP-A + OLP-B total is capped at 25/year in the base/high range. |
| 2027 | Cape Canaveral Space Force Station | SLC-37A | 0 | 45% | Modeled as second SLC-37 Starship pad, lagging SLC-37B by one to two years. Mature split reaches 38/year by 2037, keeping complex total at 76/year. |
| 2028 | Space Launch Complex 37B, Cape Canaveral (Cape Canaveral Air Station, Florida) | 2 | 50% | SLC-37B is modeled as the first high-throughput CCSFS Starship pad. Base reaches half of the SLC-37 complex cap by 2035, not immediately after redevelopment. |
| 2028 | Launch Complex 39A, NASA Kennedy Space Center, Florida (NASA John F. Kennedy Space Center, Florida) | 3 | 65% | LC-39A Starship is expected to ramp after initial Florida infrastructure/testing. Base remains below the 44/year EIS cap even after maturity to reflect range c... |
| 2028 | Starship Orbital Pad 1, Boca Chica (Starbase, Boca Chica Beach, Texas) | 7 | 65% | Starbase remains the development and early operational hub. Base ramps slowly from test cadence to routine operations; by 2031 it is one of two pads sharing th... |
| 2028 | Starship Orbital Pad 2, Boca Chica (Starbase, Boca Chica Beach, Texas) | 3 | 50% | Second Starbase pad provides incremental operations after pad commissioning. Mature OLP-A + OLP-B total is capped at 25/year in the base/high range. |
| 2028 | Cape Canaveral Space Force Station | SLC-37A | 0 | 45% | Modeled as second SLC-37 Starship pad, lagging SLC-37B by one to two years. Mature split reaches 38/year by 2037, keeping complex total at 76/year. |
| 2029 | Space Launch Complex 37B, Cape Canaveral (Cape Canaveral Air Station, Florida) | 6 | 50% | SLC-37B is modeled as the first high-throughput CCSFS Starship pad. Base reaches half of the SLC-37 complex cap by 2035, not immediately after redevelopment. |
| 2029 | Launch Complex 39A, NASA Kennedy Space Center, Florida (NASA John F. Kennedy Space Center, Florida) | 8 | 65% | LC-39A Starship is expected to ramp after initial Florida infrastructure/testing. Base remains below the 44/year EIS cap even after maturity to reflect range c... |
| 2029 | Starship Orbital Pad 1, Boca Chica (Starbase, Boca Chica Beach, Texas) | 8 | 65% | Starbase remains the development and early operational hub. Base ramps slowly from test cadence to routine operations; by 2031 it is one of two pads sharing th... |
| 2029 | Starship Orbital Pad 2, Boca Chica (Starbase, Boca Chica Beach, Texas) | 7 | 50% | Second Starbase pad provides incremental operations after pad commissioning. Mature OLP-A + OLP-B total is capped at 25/year in the base/high range. |
| 2029 | Cape Canaveral Space Force Station | SLC-37A | 2 | 45% | Modeled as second SLC-37 Starship pad, lagging SLC-37B by one to two years. Mature split reaches 38/year by 2037, keeping complex total at 76/year. |
| 2030 | Space Launch Complex 37B, Cape Canaveral (Cape Canaveral Air Station, Florida) | 12 | 50% | SLC-37B is modeled as the first high-throughput CCSFS Starship pad. Base reaches half of the SLC-37 complex cap by 2035, not immediately after redevelopment. |
| 2030 | Launch Complex 39A, NASA Kennedy Space Center, Florida (NASA John F. Kennedy Space Center, Florida) | 12 | 65% | LC-39A Starship is expected to ramp after initial Florida infrastructure/testing. Base remains below the 44/year EIS cap even after maturity to reflect range c... |
| 2030 | Starship Orbital Pad 1, Boca Chica (Starbase, Boca Chica Beach, Texas) | 9 | 65% | Starbase remains the development and early operational hub. Base ramps slowly from test cadence to routine operations; by 2031 it is one of two pads sharing th... |
| 2030 | Starship Orbital Pad 2, Boca Chica (Starbase, Boca Chica Beach, Texas) | 11 | 50% | Second Starbase pad provides incremental operations after pad commissioning. Mature OLP-A + OLP-B total is capped at 25/year in the base/high range. |
SLC-37B is modeled as the first high-throughput CCSFS Starship pad. Base reaches half of the SLC-37 complex cap by 2035, not immediately after redevelopment.
Modeled as second SLC-37 Starship pad, lagging SLC-37B by one to two years. Mature split reaches 38/year by 2037, keeping complex total at 76/year.
LC-39A Starship is expected to ramp after initial Florida infrastructure/testing. Base remains below the 44/year EIS cap even after maturity to reflect range conflicts, tanker ope...
Starbase remains the development and early operational hub. Base ramps slowly from test cadence to routine operations; by 2031 it is one of two pads sharing the 25/year site cap.
Second Starbase pad provides incremental operations after pad commissioning. Mature OLP-A + OLP-B total is capped at 25/year in the base/high range.
Starship V3 | TLI | 21,000 kg | Unknown | Unknown | SpaceX Starship public vehicle page |
Starship V1.0 | LEO | 15,000 kg | Unknown | Unknown | SpaceX Starship public/current block summary |
Starship V2 |
| May 27, 2025 |
| Launch 2025-F03 | Starship V2 | Mar 6, 2025 |
| Launch 2025-F01 | Starship V2 | Jan 16, 2025 |
| Launch 2024-U06 | Starship V1.0 | Nov 19, 2024 |
| Launch 2024-U04 | Starship V1.0 | Oct 13, 2024 |
Upcoming mission rows with announced launch timing.
| Mission | Variant | Announced |
|---|---|---|
No forecasted missionsNo upcoming announced mission rows are linked to this vehicle family. | ||
SLC-37B is modeled as the first high-throughput CCSFS Starship pad. Base reaches half of the SLC-37 complex cap by 2035, not immediately after redevelopment.
LC-39A Starship is expected to ramp after initial Florida infrastructure/testing. Base remains below the 44/year EIS cap even after maturity to reflect range conflicts, tanker ope...
Starbase remains the development and early operational hub. Base ramps slowly from test cadence to routine operations; by 2031 it is one of two pads sharing the 25/year site cap.
Second Starbase pad provides incremental operations after pad commissioning. Mature OLP-A + OLP-B total is capped at 25/year in the base/high range.
Modeled as second SLC-37 Starship pad, lagging SLC-37B by one to two years. Mature split reaches 38/year by 2037, keeping complex total at 76/year.
SLC-37B is modeled as the first high-throughput CCSFS Starship pad. Base reaches half of the SLC-37 complex cap by 2035, not immediately after redevelopment.
LC-39A Starship is expected to ramp after initial Florida infrastructure/testing. Base remains below the 44/year EIS cap even after maturity to reflect range conflicts, tanker ope...
SpaceX is developing an improved version of Starship called Starship Version 3.
Starship's flight tests included two catches of the Super Heavy booster.
Starship's flight tests included the first-ever booster reuse.
Starship completed five flight tests in 2025.
SpaceX conducted five Starship flight tests in 2023.
Starship's flight tests included the first deploy operation in space.
Starbase is the test and launch complex of SpaceX located in southern Texas, used for the development of the Starship system.
The 2028 moon landing target accelerates the current Artemis program timeline, which faced delays from Space Launch System and SpaceX Starship development.
SpaceX is targeting record fundraising to finance its Starship, Starlink, and long-term projects.
SpaceX aimed to start sending people to Mars in 2024 with the now-known Starship.
Starlink, rather than the Falcon and Starship launch vehicles, is primarily responsible for SpaceX's $800 billion valuation.
Bret Johnsen stated that an IPO could provide SpaceX with significant capital to ramp up Starship operations.
SpaceX controls both the global transport layer for the space economy through Starship and a global utility service through Starlink.
K2 Space is building satellites sized for rockets including Falcon 9, Starship, and New Glenn.
K2 Space is developing a larger spacecraft line called Giga for super heavy lift vehicles like Starship and New Glenn.
K2 Space designs massive, high-power platforms intended to maximize the throw-weight capabilities of next-generation launch vehicles like SpaceX’s Starship and Blue Origin’s New Glenn.
K2 Space plans to launch its Giga line of satellites, which require a super-heavy rocket like SpaceX’s Starship or Blue Origin’s New Glenn.
K2 Space is developing ultra-powerful, large-scale spacecraft by leveraging additional capacity from super-heavy launch vehicles like SpaceX’s Starship.
It is unclear if the $1.5 trillion valuation target pertains specifically to a Starlink spinoff or the entire SpaceX entity, which includes the Starship launch system.
Starship is equivalent in size to CZ-9.