Family-level launch record combining canonical variants, historical missions, public cadence forecasts, and available payload performance specs.
Historical missions are grouped by actual launch year. Forecast cadence uses family-level launch-rate rows.
| Year | Historical missions | Forecast launches |
|---|---|---|
| 2026 | 0 | 6 |
| 2027 | 0 | 6 |
| 2028 | 0 | 6 |
| 2029 | 0 | 6 |
| 2030 | 0 | 6 |
| 2031 | 0 | 6 |
| 2032 | 0 | 6 |
| 2033 | 0 | 6 |
| 2034 | 0 | 6 |
| 2035 | 0 | 6 |
| 2036 | 0 | 6 |
| 2037 | 0 | 6 |
| 2038 | 0 | 6 |
| 2039 | 0 | 6 |
| 2040 | 0 | 6 |
| 2041 | 0 | 6 |
1 launch location represented.
Payload capacity by variant and target orbit when structured capacity rows are available.
| Variant | Orbit | Capacity | Altitude | Inclination | Source |
|---|---|---|---|---|---|
Miura 5 | SSO | 540 kg | 500 km | Unknown | PLD Space SPARK Opportunity Overview |
Latest launched missions using variants in this family.
| Mission | Variant | Launch |
|---|---|---|
No recent missionsNo launched missions are linked to variants in this family. | ||
Upcoming mission rows with announced launch timing.
| Mission | Variant | Announced |
|---|---|---|
No forecasted missionsNo upcoming announced mission rows are linked to this vehicle family. | ||
Canonical variants rolled up into this launch vehicle family.
| Variant | Stages | Missions | Status |
|---|---|---|---|
Miura 5 | Not stated | 0 | Development |
| Year | Location | Launches | Confidence | Basis |
|---|---|---|---|---|
| 2026 | Guiana Space Centre | 6 | 20% | Editable low-confidence early operational cadence default for Miura 5. |
| 2027 | Guiana Space Centre | 6 | 20% | Editable low-confidence early operational cadence default for Miura 5. |
| 2028 | Guiana Space Centre | 6 | 20% | Editable low-confidence early operational cadence default for Miura 5. |
| 2029 | Guiana Space Centre | 6 | 20% | Editable low-confidence early operational cadence default for Miura 5. |
| 2030 | Guiana Space Centre | 6 | 20% | Editable low-confidence early operational cadence default for Miura 5. |
| 2031 | Guiana Space Centre | 6 | 20% | Editable low-confidence early operational cadence default for Miura 5. |
| 2032 | Guiana Space Centre | 6 | 20% | Editable low-confidence early operational cadence default for Miura 5. |
| 2033 | Guiana Space Centre | 6 | 20% | Editable low-confidence early operational cadence default for Miura 5. |
| 2034 | Guiana Space Centre | 6 | 20% | Editable low-confidence early operational cadence default for Miura 5. |
| 2035 | Guiana Space Centre | 6 | 20% | Editable low-confidence early operational cadence default for Miura 5. |
| 2036 | Guiana Space Centre | 6 | 20% | Editable low-confidence early operational cadence default for Miura 5. |
| 2037 | Guiana Space Centre | 6 | 20% | Editable low-confidence early operational cadence default for Miura 5. |
| 2038 | Guiana Space Centre | 6 | 20% | Editable low-confidence early operational cadence default for Miura 5. |
| 2039 | Guiana Space Centre | 6 | 20% | Editable low-confidence early operational cadence default for Miura 5. |
| 2040 | Guiana Space Centre | 6 | 20% | Editable low-confidence early operational cadence default for Miura 5. |
| 2041 | Guiana Space Centre | 6 | 20% | Editable low-confidence early operational cadence default for Miura 5. Site-year coverage backfill copied nearest prior site-rate row. |
Editable low-confidence early operational cadence default for Miura 5.
Editable low-confidence early operational cadence default for Miura 5.
Editable low-confidence early operational cadence default for Miura 5.
Editable low-confidence early operational cadence default for Miura 5.
Editable low-confidence early operational cadence default for Miura 5.
Editable low-confidence early operational cadence default for Miura 5.
Editable low-confidence early operational cadence default for Miura 5.
Editable low-confidence early operational cadence default for Miura 5.
Editable low-confidence early operational cadence default for Miura 5.
Editable low-confidence early operational cadence default for Miura 5.
Editable low-confidence early operational cadence default for Miura 5.
Editable low-confidence early operational cadence default for Miura 5.
Miura 5 is a two-stage light-launch vehicle designed to reduce the complexity and scheduling risks of launching small satellites with medium or heavy launch vehicles.
PLD Space is preparing for the inaugural flight of its MIURA 5 rocket later this year.
The two-stage MIURA 5 rocket will initially launch from a new multi-user commercial launch facility being built on the grounds of the Guiana Space Centre.
The European Investment Bank provided PLD Space a thirty million euro venture debt loan to finalize development of the Miura 5 small satellite launcher.
PLD Space plans to use Miura 5 for a bespoke launch service rather than flying small satellites as secondary payloads on larger rockets.
PLD Space expects to operate Miura 5 from multiple global spaceports by 2030.
PLD Space expects to reach a commercial cadence of up to thirty Miura 5 missions per year by 2030.
Miura 5 is a two-stage orbital rocket designed for dedicated deployment of small satellites.
Miura 5’s first stage is designed to be fully reusable and to return to the ocean for recovery.
Miura 5 has a payload capacity of approximately one thousand kilograms to low Earth orbit.
PLD Space expects Miura 5 to have its first test flight later in 2026 from the Guiana Space Centre in French Guiana.
With the launch of Miura 5 this year, Spain will join the roughly ten countries with the capability to place satellites into orbit.
PLD Space is targeting 'semi-serial' production rates of Miura 5, aiming to produce four rockets this year and six rockets next year.
PLD Space expects to launch its first Miura 5 demonstration flight this year and plans a second demonstration flight either this year or by Q1 2027.
Miura 1 was built to develop 70–75% of the technologies used in the Miura 5 orbital vehicle.
PLD Space plans to move to a larger production facility in 2028 to increase Miura 5 output into the double digits.
PLD Space secured €180 million in Series C funding led by Mitsubishi Electric to scale production of its MIURA 5 orbital rocket.
The two Miura 5 demonstration flights are intended to help PLD Space gain access to launch insurance to support commercial flights beginning in 2027.
PLD Space expects the Miura 5 rocket to perform its first test flight this year.
PLD Space has sold several launches aboard MIURA 5, including a dedicated flight for Spanish satellite operator Sateliot.