Polaris Intelligence
Polaris
Intelligence
About
Ctrl K
Sign in
© Polaris Intelligence 2026
PrivacyTermsAdmin
Launch Vehicles
Vehicle family profile

Titan

Family-level launch record combining canonical variants, historical missions, public cadence forecasts, and available payload performance specs.

Manufacturer unknownRetired
Admin
Variants
23
Canonical variants linked to this family.
Historical missions
220
Missions in the public mission table with actual launch dates.
Peak listed capacity
Unknown
Maximum payload capacity across listed variants and orbits.

Launch Cadence

Historical missions are grouped by actual launch year. Forecast cadence uses family-level launch-rate rows.

YearHistorical missionsForecast launches
199830
199950
200030
200130
200220
200340
200410
200520

Performance Specs

Payload capacity by variant and target orbit when structured capacity rows are available.

VariantOrbitCapacityAltitudeInclinationSource

No performance specs

No structured payload capacity rows are linked to this vehicle family.

Recent Missions

Latest launched missions using variants in this family.

MissionVariantLaunch
USA 186 [IC8]
Titan 404B
Oct 19, 2005
USA 182 [LAC5]
Titan 405B
Apr 30, 2005
USA 176 [DSP22]
Titan 402B
Feb 14, 2004
USA 172 (DMSP F16)

Variants

Canonical variants rolled up into this launch vehicle family.

VariantStagesMissionsStatus
Commercial Titan 3
Not stated4Retired
Titan 23B
Not stated9Retired
Titan 24B
Not stated23Retired
Titan 33B
Not stated3Retired
Titan II SLV
Oct 18, 2003
USA 171 [RH9]
Titan 401B
Sep 9, 2003
USA 169 (Milstar 6)
Titan 401B
Apr 8, 2003
Coriolis Mission
Titan II SLV
Jan 6, 2003
NOAA 17 Mission
Titan II SLV
Jun 24, 2002

Forecasted Missions

Upcoming mission rows with announced launch timing.

MissionVariantAnnounced

No forecasted missions

No upcoming announced mission rows are linked to this vehicle family.

Titan 34B
Not stated11Retired
Titan 34D
Not stated15Retired
Titan 401A
Not stated9Retired
Titan 401B
Not stated7Retired
Titan 402A
Not stated3Retired
Titan 402B
Not stated5Retired
Titan 403A
Not stated5Retired
Titan 403B
Not stated1Retired
Titan 404A
Not stated3Retired
Titan 404B
Not stated3Retired
Titan 405A
Not stated2Retired
Titan 405B
Not stated1Retired
Titan II GLV
Not stated12Retired
Titan IIIA
Not stated4Retired
Titan IIIB
Not stated22Retired
Titan IIIC
Not stated36Retired
Titan IIID
Not stated22Retired
Titan IIIE
Not stated7Retired
Titan II SLV
Not stated13Retired
Track
Mentions
182
All verified mentions of this launch vehicle family in source documents.
0.0-5.0
Actions

On May 11, a Titan IIID rocket launched the 17th HEXAGON reconnaissance satellite from Vandenberg Air Force Base, California.

PlanGeneralValue 4.0Nov 4, 2024Satellite reconnaissance and the Falklands War

By 1968, the Air Force began construction on the Titan IIIM launch pad facility that would become SLC-6.

Page6of10
PlanGrowthValue 4.0Oct 28, 2024Vandenberg and the space shuttle (part 1)

The Air Force built Space Launch Complex 6 to launch the Titan IIIM rocket in support of the Manned Orbiting Laboratory (MOL) program.

PlanGeneralValue 4.0Oct 28, 2024Vandenberg and the space shuttle (part 1)

NASA's Quick Scatterometer (QuikSCAT) satellite was launched in June 1999 on a Titan II vehicle.

PlanGeneralValue 4.0Oct 21, 2024Weighing overall societal benefit: Case studies on deciding when to deorbit satellites (part 1)

Northrop Grumman’s airborne system builds on an earlier TITAN prototype that Northrop Grumman developed in 2022.

CapabilityValue 3.0Oct 21, 2024Northrop Grumman unveils flying data center for military intelligence

NASA will procure a heavy-lift launch vehicle for Dragonfly later 2024 to enable arrival at Titan in 2034.

RelationshipsPlanValue 4.0Apr 22, 2024NASA confirms Dragonfly mission despite doubled costs

The 2034 Titan arrival date for Dragonfly matches the date planned when NASA selected the mission in 2019 despite a two-year slip in launch timing since selection.

PlanGovernanceValue 3.0Apr 22, 2024NASA confirms Dragonfly mission despite doubled costs

NASA confirmed the Dragonfly rotorcraft mission to Saturn’s moon Titan with a total lifecycle cost of $3,350,000,000.

PlanFinancialValue 5.0Apr 18, 2024NASA Confirms Dragonfly Rotorcraft Mission to Saturn’s Moon Titan

The last few Program 989 satellites were initially scheduled to be launched from the Space Shuttle before being shifted to Titan II launches.

PlanGeneralValue 3.5Apr 15, 2024FARRAH, the superstar satellite

The modules developed for LISA-T informed the design of Ascent’s Titan line of space products.

CapabilityGeneralValue 3.5Feb 28, 2024Ascent Solar's Space Solar Modules to Fly on NASA’s Upcoming LISA-T Mission

The modules developed for LISA-T informed the design of Ascent’s Titan line of space products, maximizing power generation to produce kilowatts per kilogram of array in the space environment with minimal degradation.

CapabilityGeneralValue 4.0Feb 26, 2024Ascent Solar Technologies to fly space solar modules on NASA’s upcoming LISA-T mission

The Titan IIIM rocket intended for MOL was never tested before the program cancellation.

CapabilityPlanValue 3.0Jan 2, 2024Diamonds and DORIANS: program troubles, operations, cancellation, and legacy (part 3)

The Titan IIIC rocket, which included solid rocket motors, had its first flight in summer 1965.

GeneralPlanValue 3.0Dec 18, 2023Diamonds and DORIANS: The Soviet Union’s Almaz and the United States’ Manned Orbiting Laboratory military space stations (part 2)

The Titan IIIM rocket was designed for more lifting capability than the Titan IIIC and had its testing scheduled for 1969.

PlanCapabilityValue 3.7Dec 18, 2023Diamonds and DORIANS: The Soviet Union’s Almaz and the United States’ Manned Orbiting Laboratory military space stations (part 2)

The Titan IIIM booster would be used to launch the MOL spacecraft from Space Launch Complex-6 at Vandenberg Air Force Base.

PlanValue 4.0Dec 11, 2023Diamonds and DORIANS: The Soviet Union’s Almaz and the United States’ Manned Orbiting Laboratory military space stations (part 1)

Lori Glaze, director of NASA’s planetary science division, announced on November 28 that the launch of the Dragonfly mission to Titan is delayed by a year to mid-2028.

PlanGovernanceValue 4.0Dec 11, 2023Creating a Venus exploration program

Budget uncertainty prompted NASA to delay formal confirmation of the Dragonfly mission to Titan in November 2023.

PlanValue 3.0Nov 30, 2023NASA warns of “very problematic” space technology budget cuts

MOL/DORIAN would be launched atop a Titan IIIM rocket from Vandenberg Air Force Base in California.

PlanValue 4.0Sep 18, 2023Live, from orbit: the Manned Orbiting Laboratory’s top-secret film-readout system

OceanGate used surplus Boeing aircraft composite materials that were past their rated shelf life for the Titan.

CapabilityLegalValue 4.0Jul 31, 2023Should the loss of the Titan submersible impact space tourism?

On June 18, 2023, the OceanGate submersible Titan imploded during an expedition to view the remains of the Titanic.

GeneralValue 4.0Jul 31, 2023The highs and lows of extreme tourism: The Titan accident and commercial expeditions to space and the deep sea