Polaris Intelligence
Polaris
Intelligence
About
Ctrl K
Sign in
© Polaris Intelligence 2026
PrivacyTermsAdmin
Launch Vehicles
Vehicle family profile

Nova

Family-level launch record combining canonical variants, historical missions, public cadence forecasts, and available payload performance specs.

Stoke SpaceDevelopment
Admin
Variants
1
Canonical variants linked to this family.
Historical missions
0
Missions in the public mission table with actual launch dates.
Peak listed capacity
7,000 kg
Maximum payload capacity across listed variants and orbits.

Launch Cadence

Historical missions are grouped by actual launch year. Forecast cadence uses family-level launch-rate rows.

YearHistorical missionsForecast launches
202601
202702
202803
202904
203004
203104
203205
203305
203405
203506
203606
203706
203806
203906
204006
204106

Forecast Location Split

1 launch location represented.

Performance Specs

Payload capacity by variant and target orbit when structured capacity rows are available.

VariantOrbitCapacityAltitudeInclinationSource
Nova
LEO7,000 kgUnknownUnknownStoke Space Nova
Nova
LEO3,000 kgUnknownUnknownStoke Space Nova

Recent Missions

Latest launched missions using variants in this family.

MissionVariantLaunch

No recent missions

No launched missions are linked to variants in this family.

Forecasted Missions

Upcoming mission rows with announced launch timing.

MissionVariantAnnounced

No forecasted missions

No upcoming announced mission rows are linked to this vehicle family.

Variants

Canonical variants rolled up into this launch vehicle family.

VariantStagesMissionsStatus
Nova
Not stated0Development
YearLocationLaunchesConfidenceBasis
2026Cape Canaveral Space Force Station | SLC-14125%Conservative startup-ramp annual family throughput default: Nova is development-stage; early regulatory material supports phased low-cadence expendable operati...
2027Cape Canaveral Space Force Station | SLC-14225%Conservative startup-ramp annual family throughput default: Nova is development-stage; early regulatory material supports phased low-cadence expendable operati...
2028Cape Canaveral Space Force Station | SLC-14325%Conservative startup-ramp annual family throughput default: Nova is development-stage; early regulatory material supports phased low-cadence expendable operati...
2029Cape Canaveral Space Force Station | SLC-14420%Conservative startup-ramp annual family throughput default: Nova is development-stage; early regulatory material supports phased low-cadence expendable operati...
2030Cape Canaveral Space Force Station | SLC-14420%Conservative startup-ramp annual family throughput default: Nova is development-stage; early regulatory material supports phased low-cadence expendable operati...
2031Cape Canaveral Space Force Station | SLC-14420%Conservative startup-ramp annual family throughput default: Nova is development-stage; early regulatory material supports phased low-cadence expendable operati...
2032Cape Canaveral Space Force Station | SLC-14520%Conservative startup-ramp annual family throughput default: Nova is development-stage; early regulatory material supports phased low-cadence expendable operati...
2033Cape Canaveral Space Force Station | SLC-14520%Conservative startup-ramp annual family throughput default: Nova is development-stage; early regulatory material supports phased low-cadence expendable operati...
2034Cape Canaveral Space Force Station | SLC-14520%Conservative startup-ramp annual family throughput default: Nova is development-stage; early regulatory material supports phased low-cadence expendable operati...
2035Cape Canaveral Space Force Station | SLC-14620%Conservative startup-ramp annual family throughput default: Nova is development-stage; early regulatory material supports phased low-cadence expendable operati...
2036Cape Canaveral Space Force Station | SLC-14620%Conservative startup-ramp annual family throughput default: Nova is development-stage; early regulatory material supports phased low-cadence expendable operati...
2037Cape Canaveral Space Force Station | SLC-14620%Conservative startup-ramp annual family throughput default: Nova is development-stage; early regulatory material supports phased low-cadence expendable operati...
2038Cape Canaveral Space Force Station | SLC-14620%Conservative startup-ramp annual family throughput default: Nova is development-stage; early regulatory material supports phased low-cadence expendable operati...
2039Cape Canaveral Space Force Station | SLC-14620%Conservative startup-ramp annual family throughput default: Nova is development-stage; early regulatory material supports phased low-cadence expendable operati...
2040Cape Canaveral Space Force Station | SLC-14620%Conservative startup-ramp annual family throughput default: Nova is development-stage; early regulatory material supports phased low-cadence expendable operati...
2041Cape Canaveral Space Force Station | SLC-14620%Conservative startup-ramp annual family throughput default: Nova is development-stage; early regulatory material supports phased low-cadence expendable operati...
Cape Canaveral Space Force Station | SLC-14
2026 · 25% confidence
1

Conservative startup-ramp annual family throughput default: Nova is development-stage; early regulatory material supports phased low-cadence expendable operations before reuse. Si...

Cape Canaveral Space Force Station | SLC-14
2027 · 25% confidence
2

Conservative startup-ramp annual family throughput default: Nova is development-stage; early regulatory material supports phased low-cadence expendable operations before reuse. Si...

Cape Canaveral Space Force Station | SLC-14
2028 · 25% confidence
3

Conservative startup-ramp annual family throughput default: Nova is development-stage; early regulatory material supports phased low-cadence expendable operations before reuse. Si...

Cape Canaveral Space Force Station | SLC-14
2029 · 20% confidence
4

Conservative startup-ramp annual family throughput default: Nova is development-stage; early regulatory material supports phased low-cadence expendable operations before reuse. Si...

Cape Canaveral Space Force Station | SLC-14
2030 · 20% confidence
4

Conservative startup-ramp annual family throughput default: Nova is development-stage; early regulatory material supports phased low-cadence expendable operations before reuse. Si...

Cape Canaveral Space Force Station | SLC-14
2031 · 20% confidence
4

Conservative startup-ramp annual family throughput default: Nova is development-stage; early regulatory material supports phased low-cadence expendable operations before reuse. Si...

Cape Canaveral Space Force Station | SLC-14
2032 · 20% confidence
5

Conservative startup-ramp annual family throughput default: Nova is development-stage; early regulatory material supports phased low-cadence expendable operations before reuse. Si...

Cape Canaveral Space Force Station | SLC-14
2033 · 20% confidence
5

Conservative startup-ramp annual family throughput default: Nova is development-stage; early regulatory material supports phased low-cadence expendable operations before reuse. Si...

Cape Canaveral Space Force Station | SLC-14
2034 · 20% confidence
5

Conservative startup-ramp annual family throughput default: Nova is development-stage; early regulatory material supports phased low-cadence expendable operations before reuse. Si...

Cape Canaveral Space Force Station | SLC-14
2035 · 20% confidence
6

Conservative startup-ramp annual family throughput default: Nova is development-stage; early regulatory material supports phased low-cadence expendable operations before reuse. Si...

Cape Canaveral Space Force Station | SLC-14
2036 · 20% confidence
6

Conservative startup-ramp annual family throughput default: Nova is development-stage; early regulatory material supports phased low-cadence expendable operations before reuse. Si...

Cape Canaveral Space Force Station | SLC-14
2037 · 20% confidence
6

Conservative startup-ramp annual family throughput default: Nova is development-stage; early regulatory material supports phased low-cadence expendable operations before reuse. Si...

Nova
GTO
2,500 kg
Unknown
Unknown
Stoke Space Nova
Nova
TLI1,250 kgUnknownUnknownStoke Space Nova
Nova
escape800 kgUnknownUnknownStoke Space Nova
Track
Mentions
406
All verified mentions of this launch vehicle family in source documents.
0.0-5.0
Actions

Exolaunch will use EXOpod NOVA deployers to release eight spacecraft into sun-synchronous orbit on the Kakushin Rising mission.

PlanCapabilityValue 4.5Apr 6, 2026Satellite Deployers to be Used on JAXA Small Satellite Mission by Exolaunch
Page8of21

Exolaunch used CarboNIX microsatellite separation rings for satellites up to 1,000 kg and EXOpod Nova deployers for standard and larger cubesats on Transporter-16.

CapabilityRelationshipsPlanValue 4.0Mar 30, 2026Latest News

The Spaceport Nova Scotia launch facility is intended to reduce the Canadian military’s reliance on foreign providers to reach orbit.

CapabilityLegalPlanValue 3.0Mar 27, 2026DND’s $51.7 billion plan for 2026-27 includes a new Space Rocketry Challenge

A $200 million agreement will establish a dedicated space launch facility at Spaceport Nova Scotia for the Department of National Defence’s use.

RelationshipsFinancialPlanCapabilityValue 4.4Mar 27, 2026DND’s $51.7 billion plan for 2026-27 includes a new Space Rocketry Challenge

Canada is opening the permanent North American Regional Office for the Defence Innovation Accelerator for the North Atlantic in Halifax, Nova Scotia.

GrowthGeneralValue 2.0Mar 27, 2026DND’s $51.7 billion plan for 2026-27 includes a new Space Rocketry Challenge

The Spaceport Nova Scotia launch facility includes initial funding to three companies to develop a small launch vehicle by 2028.

PlanGrowthFinancialValue 4.0Mar 27, 2026DND’s $51.7 billion plan for 2026-27 includes a new Space Rocketry Challenge

The CLPS award is the first Intuitive Machines task order to require a larger cargo class Nova-D lunar lander.

RelationshipsCapabilityValue 4.0Mar 25, 2026NASA CLPS Award Expands Lunar Operations

The Nova-D lunar lander will deliver science and technology payloads and return data while autonomously operating on the lunar surface.

CapabilityValue 3.8Mar 25, 2026NASA CLPS Award Expands Lunar Operations

The NASA CLPS award is the first Intuitive Machines task order to require a larger cargo-class Nova-D lunar lander.

RelationshipsPlanCapabilityValue 4.0Mar 24, 2026RT by @GewoonLukas_: NASA has awarded Intuitive Machines a $180.4 million dollar contract to deliver seven payloads to the Lunar #SouthPole region. 🌕 This marks our fifth CLPS task order and the first to require a larger cargo class Nova-D lunar lander. Among the payloads are a lunar rover from… pic.

Ninety percent of the Spaceport Nova Scotia agreement funds will be spent in Canada to support domestic industry.

FinancialRelationshipsValue 3.0Mar 23, 2026In Defence of Canada Briefing (Issue 2)

The Spaceport Nova Scotia launch pad gives the Department of National Defence and the Canadian Armed Forces a sovereign launch site for sending satellites into orbit without foreign third parties.

CapabilityGeneralValue 3.0Mar 23, 2026In Defence of Canada Briefing (Issue 2)

Defence Minister David McGuinty signed a 10-year, $200 million agreement with Maritime Launch Services on March 16 to lease a dedicated launch pad at Spaceport Nova Scotia.

RelationshipsFinancialPlanValue 5.0Mar 23, 2026In Defence of Canada Briefing (Issue 2)

The spaceport in Canso, Nova Scotia, is being built and operated by Maritime Launch Services Inc.

RelationshipsCapabilityValue 3.5Mar 21, 2026Canadá realiza una inversión histórica de 126 millones de euros para impulsar el puerto espacial de Nueva Escocia

The Atlantic Canada Opportunities Agency is providing 200 million Canadian dollars to build a multi-user spaceport in Nova Scotia.

PlanFinancialGeneralValue 4.5Mar 21, 2026Canadá realiza una inversión histórica de 126 millones de euros para impulsar el puerto espacial de Nueva Escocia

The dedicated launch pad at Spaceport Nova Scotia is expected to reach initial operational readiness by the end of 2026.

PlanGrowthValue 4.0Mar 20, 2026Canada Selects Dedicated Sovereign Launch Site for National Defense

Spaceport Nova Scotia will support Canada’s sovereign launch capability from Canadian soil.

CapabilityGeneralValue 2.2Mar 20, 2026Canada Selects Dedicated Sovereign Launch Site for National Defense

Maritime Launch Services is responsible for maintaining the facilities at Spaceport Nova Scotia and continuing the spaceport buildout.

GrowthCapabilityValue 3.0Mar 20, 2026Canada Selects Dedicated Sovereign Launch Site for National Defense

The Canadian Department of National Defense has become a tenant at Spaceport Nova Scotia.

RelationshipsValue 3.0Mar 20, 2026Canada Selects Dedicated Sovereign Launch Site for National Defense

Spaceport Nova Scotia is located on Canada’s Atlantic coast.

GeneralValue 1.5Mar 20, 2026Canada Selects Dedicated Sovereign Launch Site for National Defense

Spaceport Nova Scotia provides safe over-ocean launch corridors and access to sought-after orbital inclinations.

CapabilityValue 1.8Mar 20, 2026Canada Selects Dedicated Sovereign Launch Site for National Defense