Family-level launch record combining canonical variants, historical missions, public cadence forecasts, and available payload performance specs.
Historical missions are grouped by actual launch year. Forecast cadence uses family-level launch-rate rows.
| Year | Historical missions | Forecast launches |
|---|---|---|
| 2026 | 0 | 1 |
| 2027 | 0 | 2 |
| 2028 | 0 | 3 |
| 2029 | 0 | 4 |
| 2030 | 0 | 4 |
| 2031 | 0 | 4 |
| 2032 | 0 | 5 |
| 2033 | 0 | 5 |
| 2034 | 0 | 5 |
| 2035 | 0 | 6 |
| 2036 | 0 | 6 |
| 2037 | 0 | 6 |
| 2038 | 0 | 6 |
| 2039 | 0 | 6 |
| 2040 | 0 | 6 |
| 2041 | 0 | 6 |
1 launch location represented.
Payload capacity by variant and target orbit when structured capacity rows are available.
| Variant | Orbit | Capacity | Altitude | Inclination | Source |
|---|---|---|---|---|---|
Nova | LEO | 7,000 kg | Unknown | Unknown | Stoke Space Nova |
Nova | LEO | 3,000 kg | Unknown | Unknown | Stoke Space Nova |
Latest launched missions using variants in this family.
| Mission | Variant | Launch |
|---|---|---|
No recent missionsNo launched missions are linked to variants in this family. | ||
Upcoming mission rows with announced launch timing.
| Mission | Variant | Announced |
|---|---|---|
No forecasted missionsNo upcoming announced mission rows are linked to this vehicle family. | ||
Canonical variants rolled up into this launch vehicle family.
| Variant | Stages | Missions | Status |
|---|---|---|---|
Nova | Not stated | 0 | Development |
| Year | Location | Launches | Confidence | Basis |
|---|---|---|---|---|
| 2026 | Cape Canaveral Space Force Station | SLC-14 | 1 | 25% | Conservative startup-ramp annual family throughput default: Nova is development-stage; early regulatory material supports phased low-cadence expendable operati... |
| 2027 | Cape Canaveral Space Force Station | SLC-14 | 2 | 25% | Conservative startup-ramp annual family throughput default: Nova is development-stage; early regulatory material supports phased low-cadence expendable operati... |
| 2028 | Cape Canaveral Space Force Station | SLC-14 | 3 | 25% | Conservative startup-ramp annual family throughput default: Nova is development-stage; early regulatory material supports phased low-cadence expendable operati... |
| 2029 | Cape Canaveral Space Force Station | SLC-14 | 4 | 20% | Conservative startup-ramp annual family throughput default: Nova is development-stage; early regulatory material supports phased low-cadence expendable operati... |
| 2030 | Cape Canaveral Space Force Station | SLC-14 | 4 | 20% | Conservative startup-ramp annual family throughput default: Nova is development-stage; early regulatory material supports phased low-cadence expendable operati... |
| 2031 | Cape Canaveral Space Force Station | SLC-14 | 4 | 20% | Conservative startup-ramp annual family throughput default: Nova is development-stage; early regulatory material supports phased low-cadence expendable operati... |
| 2032 | Cape Canaveral Space Force Station | SLC-14 | 5 | 20% | Conservative startup-ramp annual family throughput default: Nova is development-stage; early regulatory material supports phased low-cadence expendable operati... |
| 2033 | Cape Canaveral Space Force Station | SLC-14 | 5 | 20% | Conservative startup-ramp annual family throughput default: Nova is development-stage; early regulatory material supports phased low-cadence expendable operati... |
| 2034 | Cape Canaveral Space Force Station | SLC-14 | 5 | 20% | Conservative startup-ramp annual family throughput default: Nova is development-stage; early regulatory material supports phased low-cadence expendable operati... |
| 2035 | Cape Canaveral Space Force Station | SLC-14 | 6 | 20% | Conservative startup-ramp annual family throughput default: Nova is development-stage; early regulatory material supports phased low-cadence expendable operati... |
| 2036 | Cape Canaveral Space Force Station | SLC-14 | 6 | 20% | Conservative startup-ramp annual family throughput default: Nova is development-stage; early regulatory material supports phased low-cadence expendable operati... |
| 2037 | Cape Canaveral Space Force Station | SLC-14 | 6 | 20% | Conservative startup-ramp annual family throughput default: Nova is development-stage; early regulatory material supports phased low-cadence expendable operati... |
| 2038 | Cape Canaveral Space Force Station | SLC-14 | 6 | 20% | Conservative startup-ramp annual family throughput default: Nova is development-stage; early regulatory material supports phased low-cadence expendable operati... |
| 2039 | Cape Canaveral Space Force Station | SLC-14 | 6 | 20% | Conservative startup-ramp annual family throughput default: Nova is development-stage; early regulatory material supports phased low-cadence expendable operati... |
| 2040 | Cape Canaveral Space Force Station | SLC-14 | 6 | 20% | Conservative startup-ramp annual family throughput default: Nova is development-stage; early regulatory material supports phased low-cadence expendable operati... |
| 2041 | Cape Canaveral Space Force Station | SLC-14 | 6 | 20% | Conservative startup-ramp annual family throughput default: Nova is development-stage; early regulatory material supports phased low-cadence expendable operati... |
Conservative startup-ramp annual family throughput default: Nova is development-stage; early regulatory material supports phased low-cadence expendable operations before reuse. Si...
Conservative startup-ramp annual family throughput default: Nova is development-stage; early regulatory material supports phased low-cadence expendable operations before reuse. Si...
Conservative startup-ramp annual family throughput default: Nova is development-stage; early regulatory material supports phased low-cadence expendable operations before reuse. Si...
Conservative startup-ramp annual family throughput default: Nova is development-stage; early regulatory material supports phased low-cadence expendable operations before reuse. Si...
Conservative startup-ramp annual family throughput default: Nova is development-stage; early regulatory material supports phased low-cadence expendable operations before reuse. Si...
Conservative startup-ramp annual family throughput default: Nova is development-stage; early regulatory material supports phased low-cadence expendable operations before reuse. Si...
Conservative startup-ramp annual family throughput default: Nova is development-stage; early regulatory material supports phased low-cadence expendable operations before reuse. Si...
Conservative startup-ramp annual family throughput default: Nova is development-stage; early regulatory material supports phased low-cadence expendable operations before reuse. Si...
Conservative startup-ramp annual family throughput default: Nova is development-stage; early regulatory material supports phased low-cadence expendable operations before reuse. Si...
Conservative startup-ramp annual family throughput default: Nova is development-stage; early regulatory material supports phased low-cadence expendable operations before reuse. Si...
Conservative startup-ramp annual family throughput default: Nova is development-stage; early regulatory material supports phased low-cadence expendable operations before reuse. Si...
Conservative startup-ramp annual family throughput default: Nova is development-stage; early regulatory material supports phased low-cadence expendable operations before reuse. Si...
| GTO |
| 2,500 kg |
| Unknown |
| Unknown |
| Stoke Space Nova |
Nova | TLI | 1,250 kg | Unknown | Unknown | Stoke Space Nova |
Nova | escape | 800 kg | Unknown | Unknown | Stoke Space Nova |
Spaceport Nova Scotia plans to support up to 40 launches annually by 2029.
Isar Aerospace has signed an agreement with Maritime Launch Services to develop a dedicated launch facility at Spaceport Nova Scotia.
The first launch of an Isar Aerospace Spectrum rocket from Spaceport Nova Scotia is expected in 2028.
Isar Aerospace signed an agreement with Maritime Launch Services, the operator of the Nova Scotia spaceport, to secure access to launch infrastructure and services for future orbital missions.
The operational blueprint for Spaceport Nova Scotia projects initial orbital launches in 2028.
Maritime Launch Services will provide a licensed launch site at Spaceport Nova Scotia with a launch pad, assembly, integration and testing facilities, a launch operations center, and a payload integration facility.
Maritime Launch Services signed a US$112.5 million, 10-year contract with Isar Aerospace to build a dedicated launch complex at Spaceport Nova Scotia.
The Spaceport Nova Scotia development builds on a prior Department of National Defence contract for a dedicated pad lease intended to support civil, commercial, and national security missions.
Maritime Launch Services signed a 10-year facilities usage contract with Isar Aerospace for a dedicated launch complex for Spectrum at Spaceport Nova Scotia.
The Spaceport Nova Scotia site is near Canso, Nova Scotia, and is positioned to support high-inclination and polar launch trajectories over the Atlantic Ocean without downrange landmass restrictions.
The designated launch pad must be handed over to Isar Aerospace by 1 November 2026, and additional infrastructure at Spaceport Nova Scotia must be completed by 31 December 2027.
NASA awarded Intuitive Machines a Nova-C mission worth $148.3 million in new CLPS contracts.
Intuitive Machines is building a new version of the Nova-C lunar lander and is currently performing engine tests.
Intuitive Machines says the Nova-C program will scale manufacturing processes to support higher-volume production.
The NASA contract requires Intuitive Machines to deliver a production-line-qualified Nova-C lander to the Moon no later than 2028.
Firefly Aerospace’s Blue Ghost lunar lander and Intuitive Machines’ Nova-C lander are part of NASA’s new lunar payload contract set.
Intuitive Machines will deploy a derivative of its Nova lander line for the 2028 CLPS missions.
Sophia Space will integrate its TILE modules, or Thermal Integrated LEO Edge modules, on Apex’s Nova satellite platform.
NordSpace’s Terra Nova satellite is part of its space-systems work.