Polaris Intelligence
Polaris
Intelligence
About
Ctrl K
Sign in
© Polaris Intelligence 2026
PrivacyTermsAdmin
Launch Vehicles
Vehicle family profile

Nova

Family-level launch record combining canonical variants, historical missions, public cadence forecasts, and available payload performance specs.

Stoke SpaceDevelopment
Admin
Variants
1
Canonical variants linked to this family.
Historical missions
0
Missions in the public mission table with actual launch dates.
Peak listed capacity
7,000 kg
Maximum payload capacity across listed variants and orbits.

Launch Cadence

Historical missions are grouped by actual launch year. Forecast cadence uses family-level launch-rate rows.

YearHistorical missionsForecast launches
202601
202702
202803
202904
203004
203104
203205
203305
203405
203506
203606
203706
203806
203906
204006
204106

Forecast Location Split

1 launch location represented.

Performance Specs

Payload capacity by variant and target orbit when structured capacity rows are available.

VariantOrbitCapacityAltitudeInclinationSource
Nova
LEO7,000 kgUnknownUnknownStoke Space Nova
Nova
LEO3,000 kgUnknownUnknownStoke Space Nova

Recent Missions

Latest launched missions using variants in this family.

MissionVariantLaunch

No recent missions

No launched missions are linked to variants in this family.

Forecasted Missions

Upcoming mission rows with announced launch timing.

MissionVariantAnnounced

No forecasted missions

No upcoming announced mission rows are linked to this vehicle family.

Variants

Canonical variants rolled up into this launch vehicle family.

VariantStagesMissionsStatus
Nova
Not stated0Development
YearLocationLaunchesConfidenceBasis
2026Cape Canaveral Space Force Station | SLC-14125%Conservative startup-ramp annual family throughput default: Nova is development-stage; early regulatory material supports phased low-cadence expendable operati...
2027Cape Canaveral Space Force Station | SLC-14225%Conservative startup-ramp annual family throughput default: Nova is development-stage; early regulatory material supports phased low-cadence expendable operati...
2028Cape Canaveral Space Force Station | SLC-14325%Conservative startup-ramp annual family throughput default: Nova is development-stage; early regulatory material supports phased low-cadence expendable operati...
2029Cape Canaveral Space Force Station | SLC-14420%Conservative startup-ramp annual family throughput default: Nova is development-stage; early regulatory material supports phased low-cadence expendable operati...
2030Cape Canaveral Space Force Station | SLC-14420%Conservative startup-ramp annual family throughput default: Nova is development-stage; early regulatory material supports phased low-cadence expendable operati...
2031Cape Canaveral Space Force Station | SLC-14420%Conservative startup-ramp annual family throughput default: Nova is development-stage; early regulatory material supports phased low-cadence expendable operati...
2032Cape Canaveral Space Force Station | SLC-14520%Conservative startup-ramp annual family throughput default: Nova is development-stage; early regulatory material supports phased low-cadence expendable operati...
2033Cape Canaveral Space Force Station | SLC-14520%Conservative startup-ramp annual family throughput default: Nova is development-stage; early regulatory material supports phased low-cadence expendable operati...
2034Cape Canaveral Space Force Station | SLC-14520%Conservative startup-ramp annual family throughput default: Nova is development-stage; early regulatory material supports phased low-cadence expendable operati...
2035Cape Canaveral Space Force Station | SLC-14620%Conservative startup-ramp annual family throughput default: Nova is development-stage; early regulatory material supports phased low-cadence expendable operati...
2036Cape Canaveral Space Force Station | SLC-14620%Conservative startup-ramp annual family throughput default: Nova is development-stage; early regulatory material supports phased low-cadence expendable operati...
2037Cape Canaveral Space Force Station | SLC-14620%Conservative startup-ramp annual family throughput default: Nova is development-stage; early regulatory material supports phased low-cadence expendable operati...
2038Cape Canaveral Space Force Station | SLC-14620%Conservative startup-ramp annual family throughput default: Nova is development-stage; early regulatory material supports phased low-cadence expendable operati...
2039Cape Canaveral Space Force Station | SLC-14620%Conservative startup-ramp annual family throughput default: Nova is development-stage; early regulatory material supports phased low-cadence expendable operati...
2040Cape Canaveral Space Force Station | SLC-14620%Conservative startup-ramp annual family throughput default: Nova is development-stage; early regulatory material supports phased low-cadence expendable operati...
2041Cape Canaveral Space Force Station | SLC-14620%Conservative startup-ramp annual family throughput default: Nova is development-stage; early regulatory material supports phased low-cadence expendable operati...
Cape Canaveral Space Force Station | SLC-14
2026 · 25% confidence
1

Conservative startup-ramp annual family throughput default: Nova is development-stage; early regulatory material supports phased low-cadence expendable operations before reuse. Si...

Cape Canaveral Space Force Station | SLC-14
2027 · 25% confidence
2

Conservative startup-ramp annual family throughput default: Nova is development-stage; early regulatory material supports phased low-cadence expendable operations before reuse. Si...

Cape Canaveral Space Force Station | SLC-14
2028 · 25% confidence
3

Conservative startup-ramp annual family throughput default: Nova is development-stage; early regulatory material supports phased low-cadence expendable operations before reuse. Si...

Cape Canaveral Space Force Station | SLC-14
2029 · 20% confidence
4

Conservative startup-ramp annual family throughput default: Nova is development-stage; early regulatory material supports phased low-cadence expendable operations before reuse. Si...

Cape Canaveral Space Force Station | SLC-14
2030 · 20% confidence
4

Conservative startup-ramp annual family throughput default: Nova is development-stage; early regulatory material supports phased low-cadence expendable operations before reuse. Si...

Cape Canaveral Space Force Station | SLC-14
2031 · 20% confidence
4

Conservative startup-ramp annual family throughput default: Nova is development-stage; early regulatory material supports phased low-cadence expendable operations before reuse. Si...

Cape Canaveral Space Force Station | SLC-14
2032 · 20% confidence
5

Conservative startup-ramp annual family throughput default: Nova is development-stage; early regulatory material supports phased low-cadence expendable operations before reuse. Si...

Cape Canaveral Space Force Station | SLC-14
2033 · 20% confidence
5

Conservative startup-ramp annual family throughput default: Nova is development-stage; early regulatory material supports phased low-cadence expendable operations before reuse. Si...

Cape Canaveral Space Force Station | SLC-14
2034 · 20% confidence
5

Conservative startup-ramp annual family throughput default: Nova is development-stage; early regulatory material supports phased low-cadence expendable operations before reuse. Si...

Cape Canaveral Space Force Station | SLC-14
2035 · 20% confidence
6

Conservative startup-ramp annual family throughput default: Nova is development-stage; early regulatory material supports phased low-cadence expendable operations before reuse. Si...

Cape Canaveral Space Force Station | SLC-14
2036 · 20% confidence
6

Conservative startup-ramp annual family throughput default: Nova is development-stage; early regulatory material supports phased low-cadence expendable operations before reuse. Si...

Cape Canaveral Space Force Station | SLC-14
2037 · 20% confidence
6

Conservative startup-ramp annual family throughput default: Nova is development-stage; early regulatory material supports phased low-cadence expendable operations before reuse. Si...

Nova
GTO
2,500 kg
Unknown
Unknown
Stoke Space Nova
Nova
TLI1,250 kgUnknownUnknownStoke Space Nova
Nova
escape800 kgUnknownUnknownStoke Space Nova
Track
Mentions
406
All verified mentions of this launch vehicle family in source documents.
0.0-5.0
Actions

Spaceport Nova Scotia is planning two suborbital launches next month from a European company.

PlanGeneralValue 3.0Sep 25, 2025NordSpace postpones suborbital launch, cites fuel issue

RDX will have its own launch pad at Spaceport Nova Scotia.

Page15of21
PlanCapabilityGrowthValue 3.0Sep 25, 2025NordSpace postpones suborbital launch, cites fuel issue

The ILO-X observatory mission carried by the Intuitive Machines Nova-C lander in February 2024 experienced a landing failure, landing on its side.

PlanGeneralValue 3.5Sep 19, 2025Moon Telescope Sparks Lunar-Distance Relationship

The 33-month CTOS mission will be designed and manufactured in-house at Galaxia’s facilities in Nova Scotia.

CapabilityPlanValue 4.0Sep 19, 2025Galaxia lands $2.5M DRDC contract to build tactical LEO satellite

FibreCoat raised close to €20 million in a Series B round from NewSpace Capital, Goose Capital, Nova Saint-Gobain, 212 NexT, Otto Krahn New Business, Convergent Ventures and TiE.

FinancialRelationshipsValue 4.5Dec 8, 2024FibreCoat secures million€€ from NewSpace Capital + other investors in Series B raise

Intuitive Machines successfully landed its Nova-C class lunar lander, Odysseus, on the Moon in 2024, marking the United States' return to the lunar surface since 1972.

PlanGeneralValue 4.0Dec 3, 2024Intuitive Machines + Johns Hopkins APL partner to advance safe, secure + reliable lunar infrastructure

Intuitive Machines flew its first Nova-C lander to the Moon in February on the IM-1 mission.

GeneralPlanValue 4.0Nov 25, 2024The search for a commercial lunar economy

Intuitive Machines is developing a third Nova-C lander for the IM-3 mission that is undergoing vibration testing and has a mission window through early 2026.

PlanCapabilityValue 4.0Nov 14, 2024Intuitive Machines calls for “infrastructure-first” focus for Artemis

Intuitive Machines’ Nova-C lander will deliver six payloads with a combined mass of 79 kg to the south polar region of the Moon in 2027.

PlanCapabilityValue 4.5Aug 29, 2024NASA selects Intuitive Machines for south pole lunar lander mission

More than 30 EXOpod Nova containerized deployers and CarboNIX ring-based separation systems will be utilized to support satellite deployment on Transporter-11.

PlanCapabilityValue 4.0Jun 20, 2024Exolaunch integrates 42 satellites for SpaceX’s Transporter-11 rideshare mission

Apex will use the Series B funding to accelerate production of its Aries satellite bus and to develop larger models called Nova and Comet.

FinancialCapabilityGrowthValue 4.0Jun 12, 2024Apex raises $95 million to increase satellite bus production

Apex plans to start producing Nova buses in 2025 with two Nova buses expected to be completed and launched that year.

PlanCapabilityGrowthValue 4.0Jun 12, 2024Apex raises $95 million to increase satellite bus production

Intuitive Machines is developing a third Nova-C lander, IM-3, with a planned launch in 2025.

PlanGeneralValue 4.0May 14, 2024Intuitive Machines making upgrades to second lunar lander

Intuitive Machines will upgrade communications, tracking, and landing systems on the Nova-C lander based on lessons from the IM-1 mission.

CapabilityPlanValue 4.0May 14, 2024Intuitive Machines making upgrades to second lunar lander

Parsons Corporation will supply NEBULA Operations – Vendor Architecture (NOVA) as Rocket Lab’s ground system to manage operations for its 18 SDA satellites.

RelationshipsValue 4.4May 6, 2024Rocket Lab Selects Subcontractors to Support SDA Satellite Constellation Development

Steve Altemus confirmed that only minor changes will be made to the Nova-C lander design for the IM-2 mission.

PlanCapabilityValue 3.5Mar 25, 2024Lessons from the first CLPS lunar landing missions

Intuitive Machines submitted a proposal to NASA’s Lunar Terrain Vehicle program offering a rover delivered to the moon on the company’s Nova-D lander.

RelationshipsPlanValue 4.0Mar 22, 2024Intuitive Machines on firmer footing after lunar landing

Exolaunch deployed the Transporter-10 satellites using eight EXOpod Nova deployers and 12 CarboNIX separation systems.

CapabilityGeneralValue 4.0Mar 7, 2024Exolaunch deploys 28 customer satellites onboard SpaceX’s Transporter-10 mission

The Independence payload developed by Lonestar Data Holdings was delivered on Intuitive Machines’ IM-1 Odysseus Nova-C lander mission.

RelationshipsCapabilityValue 4.0Feb 29, 2024Lonestar Makes History with Successful Test Of Data Storage Concept From Moon's Surface

EagleCam landed about four meters away from the Nova-C lander after being deployed on 2024-02-28.

PlanCapabilityValue 4.0Feb 28, 2024Intuitive Machines and NASA call IM-1 lunar lander a success as mission winds down