Polaris Intelligence
Polaris
Intelligence
About
Ctrl K
Sign in
© Polaris Intelligence 2026
PrivacyTermsAdmin
Launch Vehicles
Vehicle family profile

PSLV

Family-level launch record combining canonical variants, historical missions, public cadence forecasts, and available payload performance specs.

Indian Space Research Organization (ISRO)Active
Admin
Variants
6
Canonical variants linked to this family.
Historical missions
64
Missions in the public mission table with actual launch dates.
Peak listed capacity
3,800 kg
Maximum payload capacity across listed variants and orbits.

Launch Cadence

Historical missions are grouped by actual launch year. Forecast cadence uses family-level launch-rate rows.

YearHistorical missionsForecast launches
201950
202020
202110
202230
202330
202430
202510
202618
202708
202808
202908
203008
203108
203208
203308
203408
203508

Performance Specs

Payload capacity by variant and target orbit when structured capacity rows are available.

VariantOrbitCapacityAltitudeInclinationSource
PSLV-XL
LEO3,800 kg200 km30 degGunter Krebs / Skyrocket PSLV-XL profile
PSLV-DL
LEO3,800 kgUnknownUnknownSpace Launch Schedule PSLV-DL vehicle page

Recent Missions

Latest launched missions using variants in this family.

MissionVariantLaunch
Launch 2026-F01
PSLV-DL
Jan 12, 2026
Launch 2025-F05
PSLV-XL
May 18, 2025
SPADEX
PSLV CA
Dec 30, 2024
PROBA-3

Variants

Canonical variants rolled up into this launch vehicle family.

VariantStagesMissionsStatus
PSLV
Not stated3Retired
PSLV C
Not stated9Retired
PSLV CA
Not stated18Active
PSLV-DL
Not stated5Active
203608
203708
203808
203908
204008
204108

Forecast Location Split

1 launch location represented.

YearLocationLaunchesConfidenceBasis
2026Satish Dhawan Space Centre | PSLV launch pads825%Editable low-confidence annual throughput seed.
2027Satish Dhawan Space Centre | PSLV launch pads825%Editable low-confidence annual throughput seed.
2028Satish Dhawan Space Centre | PSLV launch pads825%Editable low-confidence annual throughput seed.
2029Satish Dhawan Space Centre | PSLV launch pads825%Editable low-confidence annual throughput seed.
2030Satish Dhawan Space Centre | PSLV launch pads825%Editable low-confidence annual throughput seed.
2031Satish Dhawan Space Centre | PSLV launch pads825%Editable low-confidence annual throughput seed.
2032Satish Dhawan Space Centre | PSLV launch pads825%Editable low-confidence annual throughput seed.
2033Satish Dhawan Space Centre | PSLV launch pads825%Editable low-confidence annual throughput seed.
2034Satish Dhawan Space Centre | PSLV launch pads825%Editable low-confidence annual throughput seed.
2035Satish Dhawan Space Centre | PSLV launch pads825%Editable low-confidence annual throughput seed.
2036Satish Dhawan Space Centre | PSLV launch pads825%Editable low-confidence annual throughput seed.
2037Satish Dhawan Space Centre | PSLV launch pads825%Editable low-confidence annual throughput seed.
2038Satish Dhawan Space Centre | PSLV launch pads825%Editable low-confidence annual throughput seed.
2039Satish Dhawan Space Centre | PSLV launch pads825%Editable low-confidence annual throughput seed.
2040Satish Dhawan Space Centre | PSLV launch pads825%Editable low-confidence annual throughput seed.
2041Satish Dhawan Space Centre | PSLV launch pads825%Editable low-confidence annual throughput seed. Site-year coverage backfill copied nearest prior site-rate row.
Satish Dhawan Space Centre | PSLV launch pads
2026 · 25% confidence
8

Editable low-confidence annual throughput seed.

Satish Dhawan Space Centre | PSLV launch pads
2027 · 25% confidence
8

Editable low-confidence annual throughput seed.

Satish Dhawan Space Centre | PSLV launch pads
2028 · 25% confidence
8

Editable low-confidence annual throughput seed.

Satish Dhawan Space Centre | PSLV launch pads
2029 · 25% confidence
8

Editable low-confidence annual throughput seed.

Satish Dhawan Space Centre | PSLV launch pads
2030 · 25% confidence
8

Editable low-confidence annual throughput seed.

Satish Dhawan Space Centre | PSLV launch pads
2031 · 25% confidence
8

Editable low-confidence annual throughput seed.

PSLV CA
LEO3,800 kgUnknownUnknownSpace Launch Now PSLV-CA vehicle page
PSLV-DL
SSO1,750 kg600 kmUnknownISRO PSLV page and Space Launch Schedule PSLV-DL vehicle page
PSLV
SSO1,750 kg600 kmUnknownISRO PSLV page
PSLV-XL
SSO1,750 kg600 kmUnknownISRO PSLV page
PSLV-XL
GTO1,425 kgUnknownUnknownISRO PSLV page
PSLV
GTO1,425 kgUnknownUnknownISRO PSLV page
PSLV-XL
GTO1,300 kgUnknownUnknownGunter Krebs / Skyrocket PSLV-XL profile
PSLV-DL
GTO1,200 kgUnknownUnknownSpace Launch Schedule PSLV-DL vehicle page
PSLV CA
GTO1,200 kgUnknownUnknownSpace Launch Now PSLV-CA vehicle page
PSLV CA
SSO1,092 kg622 kmUnknownSpace Launch Now PSLV-CA vehicle page
PSLV-XL
Dec 5, 2024
XPoSAT Mission
PSLV-DL
Jan 1, 2024
Aditya-L1 Mission
PSLV-XL
Sep 2, 2023
DS-SAR Mission
PSLV CA
Jul 30, 2023
TeLEOS-2
PSLV CA
Apr 22, 2023

Forecasted Missions

Upcoming mission rows with announced launch timing.

MissionVariantAnnounced

No forecasted missions

No upcoming announced mission rows are linked to this vehicle family.

PSLV-QL
Not stated2Retired
PSLV-XL
Not stated27Active
Track
Satish Dhawan Space Centre | PSLV launch pads
2032 · 25% confidence
8

Editable low-confidence annual throughput seed.

Satish Dhawan Space Centre | PSLV launch pads
2033 · 25% confidence
8

Editable low-confidence annual throughput seed.

Satish Dhawan Space Centre | PSLV launch pads
2034 · 25% confidence
8

Editable low-confidence annual throughput seed.

Satish Dhawan Space Centre | PSLV launch pads
2035 · 25% confidence
8

Editable low-confidence annual throughput seed.

Satish Dhawan Space Centre | PSLV launch pads
2036 · 25% confidence
8

Editable low-confidence annual throughput seed.

Satish Dhawan Space Centre | PSLV launch pads
2037 · 25% confidence
8

Editable low-confidence annual throughput seed.

Mentions
378
All verified mentions of this launch vehicle family in source documents.
0.0-5.0
Actions

PSLV-C62 will carry EOS-N1 and 18 rideshare satellites.

PlanGeneralValue 3.8Jan 6, 2026India's next launch, PSLV-C62 carrying EOS-N1 and 18 rideshares, is officially confirmed to launch for January 12th at 04:47 UTC. The PSLV rocket will be flying in the PSLV-DL configuration with 2 strap-on SRB's. This will PSLV's return to flight following the failure last May.
Page8of19

PSLV-C62 will mark PSLV's return to flight following a failure in May.

PlanValue 3.4Jan 6, 2026India's next launch, PSLV-C62 carrying EOS-N1 and 18 rideshares, is officially confirmed to launch for January 12th at 04:47 UTC. The PSLV rocket will be flying in the PSLV-DL configuration with 2 strap-on SRB's. This will PSLV's return to flight following the failure last May.

India's PSLV-C62 mission is confirmed to launch on January 12th at 04:47 UTC.

PlanValue 4.0Jan 6, 2026India's next launch, PSLV-C62 carrying EOS-N1 and 18 rideshares, is officially confirmed to launch for January 12th at 04:47 UTC. The PSLV rocket will be flying in the PSLV-DL configuration with 2 strap-on SRB's. This will PSLV's return to flight following the failure last May.

The PSLV rocket will fly in the PSLV-DL configuration with 2 strap-on solid rocket boosters.

CapabilityValue 4.0Jan 6, 2026India's next launch, PSLV-C62 carrying EOS-N1 and 18 rideshares, is officially confirmed to launch for January 12th at 04:47 UTC. The PSLV rocket will be flying in the PSLV-DL configuration with 2 strap-on SRB's. This will PSLV's return to flight following the failure last May.

The PSLV-C62 Mission is scheduled to launch on 12 January 2026 at 10:17 hrs IST from the First Launch Pad (FLP) at SDSC SHAR, Sriharikota.

PlanValue 4.5Jan 6, 2026RT by @Cosmic_Penguin: The Launch of PSLV-C62 Mission is scheduled on 12 January 2026 at 10:17 hrs IST from First Launch Pad (FLP), SDSC SHAR, Sriharikota. Public can witness the launch from Launch View Gallery at SDSC SHAR, Sriharikota by registering through online from the following link https://lvg.shar.gov.in/VSCREGISTRATION/index.jsp

Proba-3 was launched on December 5, 2024 aboard a PSLV-XL rocket from India.

PlanValue 4.0Jan 1, 2026ESA Confirms Proba-3 Autonomous Formation Flying Milestone

Integration of the four stages of the PSLV-C62 has been completed.

PlanCapabilityValue 2.5Dec 30, 2025Having just launched their latest mission, preparations for India's next launch, PSLV-C62, are in full swing. According to regional reports, the EOS-N1/Anvesha satellite arrived a few days ago, and integration of the 4 stages has been completed. Launch is NET Jan 10 at 04:15 UTC.

India's PSLV-C62 mission is preparing for launch.

PlanValue 3.6Dec 30, 2025Having just launched their latest mission, preparations for India's next launch, PSLV-C62, are in full swing. According to regional reports, the EOS-N1/Anvesha satellite arrived a few days ago, and integration of the 4 stages has been completed. Launch is NET Jan 10 at 04:15 UTC.

India's next launch, PSLV-C62, is scheduled for January 10 at 04:15 UTC.

PlanValue 4.0Dec 30, 2025Having just launched their latest mission, preparations for India's next launch, PSLV-C62, are in full swing. According to regional reports, the EOS-N1/Anvesha satellite arrived a few days ago, and integration of the 4 stages has been completed. Launch is NET Jan 10 at 04:15 UTC.

The PSLV-C62 launch is scheduled for January 10 at 04:15 UTC.

PlanValue 4.2Dec 30, 2025Having just launched their latest mission, preparations for India's next launch, PSLV-C62, are in full swing. According to regional reports, the EOS-N1/Anvesha satellite arrived a few days ago, and integration of the 4 stages has been completed. Launch is NET Jan 10 at 04:15 UTC.

Integration of the four stages for PSLV-C62 has been completed.

PlanValue 4.0Dec 30, 2025Having just launched their latest mission, preparations for India's next launch, PSLV-C62, are in full swing. According to regional reports, the EOS-N1/Anvesha satellite arrived a few days ago, and integration of the 4 stages has been completed. Launch is NET Jan 10 at 04:15 UTC.

The old hazard areas for December 25th are still in place for the PSLV-C62 launch.

PlanValue 3.0Dec 16, 2025The launch of PSLV-C62 with the Anvesha/EOS-N1 satellite and 18 rideshares is now scheduled for NET December 31st according to local media. The old hazard area's for December 25th are still in place, but will likely be replaced soon. https://x.com/GewoonLukas_/status/1997392062803526008

The launch of PSLV-C62 with the Anvesha/EOS-N1 satellite and 18 rideshares is scheduled for December 31st.

PlanValue 4.0Dec 16, 2025The launch of PSLV-C62 with the Anvesha/EOS-N1 satellite and 18 rideshares is now scheduled for NET December 31st according to local media. The old hazard area's for December 25th are still in place, but will likely be replaced soon. https://x.com/GewoonLukas_/status/1997392062803526008

PSLV-C62 will be the return to flight for the PSLV program following the PSLV-C61 launch failure in May 2023.

PlanValue 3.0Dec 6, 2025PSLV-C62 will be the return to flight for PSLV following the PSLV-C61 launch failure in May of this year, during which the RISAT-1B/EOS-09 satellite was lost. During that launch, a "slight manufacturing error" caused the 3rd stage to fail.

A slight manufacturing error caused the 3rd stage to fail during the PSLV-C61 launch.

GeneralCapabilityPlanValue 3.2Dec 6, 2025PSLV-C62 will be the return to flight for PSLV following the PSLV-C61 launch failure in May of this year, during which the RISAT-1B/EOS-09 satellite was lost. During that launch, a "slight manufacturing error" caused the 3rd stage to fail.

The PSLV-C61 launch failure resulted in the loss of the RISAT-1B/EOS-09 satellite.

GeneralValue 4.0Dec 6, 2025PSLV-C62 will be the return to flight for PSLV following the PSLV-C61 launch failure in May of this year, during which the RISAT-1B/EOS-09 satellite was lost. During that launch, a "slight manufacturing error" caused the 3rd stage to fail.

PSLV-C62 will include 18 rideshares.

PlanCapabilityValue 3.5Dec 6, 2025With a little more then 1 week to go until India's next launch (LVM3-M6 with AST's BlueBird), hazard area's for the next have already appeared! Scheduled for NET Dec. 25 at 04:15 UTC, this will be PSLV-C62 with EOS-N1 (suspected to be Anvesha for the DRDO), and 18 rideshares.

PSLV-C62 is scheduled to launch EOS-N1 on December 25.

PlanValue 4.0Dec 6, 2025With a little more then 1 week to go until India's next launch (LVM3-M6 with AST's BlueBird), hazard area's for the next have already appeared! Scheduled for NET Dec. 25 at 04:15 UTC, this will be PSLV-C62 with EOS-N1 (suspected to be Anvesha for the DRDO), and 18 rideshares.

ISRO is developing its first PSLV built entirely by Indian industry.

PlanCapabilityValue 3.0Nov 16, 2025ISRO plans to 3x spacecraft output + Chandrayaan-4 to launch in 2028

The ISSA-J1 mission is scheduled to be launched on the Polar Satellite Launch Vehicle.

PlanGeneralValue 4.0Sep 24, 2025Satellite Debris Inspection Mission Planned for 2027