Family-level launch record combining canonical variants, historical missions, public cadence forecasts, and available payload performance specs.
Historical missions are grouped by actual launch year. Forecast cadence uses family-level launch-rate rows.
| Year | Historical missions | Forecast launches |
|---|---|---|
| 2019 | 5 | 0 |
| 2020 | 2 | 0 |
| 2021 | 1 | 0 |
| 2022 | 3 | 0 |
| 2023 | 3 | 0 |
| 2024 | 3 | 0 |
| 2025 | 1 | 0 |
| 2026 | 1 | 8 |
| 2027 | 0 | 8 |
| 2028 | 0 | 8 |
| 2029 | 0 | 8 |
| 2030 | 0 | 8 |
| 2031 | 0 | 8 |
| 2032 | 0 | 8 |
| 2033 | 0 | 8 |
| 2034 | 0 | 8 |
| 2035 | 0 | 8 |
Payload capacity by variant and target orbit when structured capacity rows are available.
| Variant | Orbit | Capacity | Altitude | Inclination | Source |
|---|---|---|---|---|---|
PSLV-XL | LEO | 3,800 kg | 200 km | 30 deg | Gunter Krebs / Skyrocket PSLV-XL profile |
PSLV-DL | LEO | 3,800 kg | Unknown | Unknown | Space Launch Schedule PSLV-DL vehicle page |
Latest launched missions using variants in this family.
| Mission | Variant | Launch |
|---|---|---|
| Launch 2026-F01 | PSLV-DL | Jan 12, 2026 |
| Launch 2025-F05 | PSLV-XL | May 18, 2025 |
| SPADEX | PSLV CA | Dec 30, 2024 |
| PROBA-3 |
Canonical variants rolled up into this launch vehicle family.
| Variant | Stages | Missions | Status |
|---|---|---|---|
PSLV | Not stated | 3 | Retired |
PSLV C | Not stated | 9 | Retired |
PSLV CA | Not stated | 18 | Active |
PSLV-DL | Not stated | 5 | Active |
| 2036 | 0 | 8 |
| 2037 | 0 | 8 |
| 2038 | 0 | 8 |
| 2039 | 0 | 8 |
| 2040 | 0 | 8 |
| 2041 | 0 | 8 |
1 launch location represented.
| Year | Location | Launches | Confidence | Basis |
|---|---|---|---|---|
| 2026 | Satish Dhawan Space Centre | PSLV launch pads | 8 | 25% | Editable low-confidence annual throughput seed. |
| 2027 | Satish Dhawan Space Centre | PSLV launch pads | 8 | 25% | Editable low-confidence annual throughput seed. |
| 2028 | Satish Dhawan Space Centre | PSLV launch pads | 8 | 25% | Editable low-confidence annual throughput seed. |
| 2029 | Satish Dhawan Space Centre | PSLV launch pads | 8 | 25% | Editable low-confidence annual throughput seed. |
| 2030 | Satish Dhawan Space Centre | PSLV launch pads | 8 | 25% | Editable low-confidence annual throughput seed. |
| 2031 | Satish Dhawan Space Centre | PSLV launch pads | 8 | 25% | Editable low-confidence annual throughput seed. |
| 2032 | Satish Dhawan Space Centre | PSLV launch pads | 8 | 25% | Editable low-confidence annual throughput seed. |
| 2033 | Satish Dhawan Space Centre | PSLV launch pads | 8 | 25% | Editable low-confidence annual throughput seed. |
| 2034 | Satish Dhawan Space Centre | PSLV launch pads | 8 | 25% | Editable low-confidence annual throughput seed. |
| 2035 | Satish Dhawan Space Centre | PSLV launch pads | 8 | 25% | Editable low-confidence annual throughput seed. |
| 2036 | Satish Dhawan Space Centre | PSLV launch pads | 8 | 25% | Editable low-confidence annual throughput seed. |
| 2037 | Satish Dhawan Space Centre | PSLV launch pads | 8 | 25% | Editable low-confidence annual throughput seed. |
| 2038 | Satish Dhawan Space Centre | PSLV launch pads | 8 | 25% | Editable low-confidence annual throughput seed. |
| 2039 | Satish Dhawan Space Centre | PSLV launch pads | 8 | 25% | Editable low-confidence annual throughput seed. |
| 2040 | Satish Dhawan Space Centre | PSLV launch pads | 8 | 25% | Editable low-confidence annual throughput seed. |
| 2041 | Satish Dhawan Space Centre | PSLV launch pads | 8 | 25% | Editable low-confidence annual throughput seed. Site-year coverage backfill copied nearest prior site-rate row. |
Editable low-confidence annual throughput seed.
Editable low-confidence annual throughput seed.
Editable low-confidence annual throughput seed.
Editable low-confidence annual throughput seed.
Editable low-confidence annual throughput seed.
Editable low-confidence annual throughput seed.
PSLV CA | LEO | 3,800 kg | Unknown | Unknown | Space Launch Now PSLV-CA vehicle page |
PSLV-DL | SSO | 1,750 kg | 600 km | Unknown | ISRO PSLV page and Space Launch Schedule PSLV-DL vehicle page |
PSLV | SSO | 1,750 kg | 600 km | Unknown | ISRO PSLV page |
PSLV-XL | SSO | 1,750 kg | 600 km | Unknown | ISRO PSLV page |
PSLV-XL | GTO | 1,425 kg | Unknown | Unknown | ISRO PSLV page |
PSLV | GTO | 1,425 kg | Unknown | Unknown | ISRO PSLV page |
PSLV-XL | GTO | 1,300 kg | Unknown | Unknown | Gunter Krebs / Skyrocket PSLV-XL profile |
PSLV-DL | GTO | 1,200 kg | Unknown | Unknown | Space Launch Schedule PSLV-DL vehicle page |
PSLV CA | GTO | 1,200 kg | Unknown | Unknown | Space Launch Now PSLV-CA vehicle page |
PSLV CA | SSO | 1,092 kg | 622 km | Unknown | Space Launch Now PSLV-CA vehicle page |
PSLV-XL |
| Dec 5, 2024 |
| XPoSAT Mission | PSLV-DL | Jan 1, 2024 |
| Aditya-L1 Mission | PSLV-XL | Sep 2, 2023 |
| DS-SAR Mission | PSLV CA | Jul 30, 2023 |
| TeLEOS-2 | PSLV CA | Apr 22, 2023 |
Upcoming mission rows with announced launch timing.
| Mission | Variant | Announced |
|---|---|---|
No forecasted missionsNo upcoming announced mission rows are linked to this vehicle family. | ||
PSLV-QL | Not stated | 2 | Retired |
PSLV-XL | Not stated | 27 | Active |
Editable low-confidence annual throughput seed.
Editable low-confidence annual throughput seed.
Editable low-confidence annual throughput seed.
Editable low-confidence annual throughput seed.
Editable low-confidence annual throughput seed.
Editable low-confidence annual throughput seed.
PSLV-C62 will carry EOS-N1 and 18 rideshare satellites.
PSLV-C62 will mark PSLV's return to flight following a failure in May.
India's PSLV-C62 mission is confirmed to launch on January 12th at 04:47 UTC.
The PSLV rocket will fly in the PSLV-DL configuration with 2 strap-on solid rocket boosters.
The PSLV-C62 Mission is scheduled to launch on 12 January 2026 at 10:17 hrs IST from the First Launch Pad (FLP) at SDSC SHAR, Sriharikota.
Proba-3 was launched on December 5, 2024 aboard a PSLV-XL rocket from India.
Integration of the four stages of the PSLV-C62 has been completed.
India's PSLV-C62 mission is preparing for launch.
India's next launch, PSLV-C62, is scheduled for January 10 at 04:15 UTC.
The PSLV-C62 launch is scheduled for January 10 at 04:15 UTC.
Integration of the four stages for PSLV-C62 has been completed.
The old hazard areas for December 25th are still in place for the PSLV-C62 launch.
The launch of PSLV-C62 with the Anvesha/EOS-N1 satellite and 18 rideshares is scheduled for December 31st.
PSLV-C62 will be the return to flight for the PSLV program following the PSLV-C61 launch failure in May 2023.
A slight manufacturing error caused the 3rd stage to fail during the PSLV-C61 launch.
The PSLV-C61 launch failure resulted in the loss of the RISAT-1B/EOS-09 satellite.
PSLV-C62 will include 18 rideshares.
PSLV-C62 is scheduled to launch EOS-N1 on December 25.
ISRO is developing its first PSLV built entirely by Indian industry.
The ISSA-J1 mission is scheduled to be launched on the Polar Satellite Launch Vehicle.