Family-level launch record combining canonical variants, historical missions, public cadence forecasts, and available payload performance specs.
Historical missions are grouped by actual launch year. Forecast cadence uses family-level launch-rate rows.
| Year | Historical missions | Forecast launches |
|---|---|---|
| 2019 | 6 | 0 |
| 2020 | 7 | 0 |
| 2021 | 6 | 0 |
| 2022 | 9 | 0 |
| 2023 | 9 | 0 |
| 2024 | 14 | 0 |
| 2025 | 18 | 0 |
| 2026 | 8 | 22 |
| 2027 | 0 | 23 |
| 2028 | 0 | 26 |
| 2029 | 0 | 29 |
| 2030 | 0 | 30 |
| 2031 | 0 | 30 |
| 2032 | 0 | 30 |
| 2033 | 0 | 30 |
| 2034 | 0 | 30 |
| 2035 | 0 | 30 |
Payload capacity by variant and target orbit when structured capacity rows are available.
| Variant | Orbit | Capacity | Altitude | Inclination | Source |
|---|---|---|---|---|---|
Electron | LEO | 300 kg | Unknown | Unknown | Rocket Lab Electron vehicle page |
Electron | SSO | 200 kg | 500 km | Unknown | Rocket Lab Electron Payload User's Guide |
Latest launched missions using variants in this family.
| Mission | Variant | Launch |
|---|---|---|
| VICTUS HAZE Puma Mission | Electron | Jun 19, 2026 |
| Viva La StriX | Electron | May 22, 2026 |
| Kakushin Rising | Electron | Apr 23, 2026 |
| Daughter of the Stars |
Canonical variants rolled up into this launch vehicle family.
| Variant | Stages | Missions | Status |
|---|---|---|---|
Electron | Not stated | 81 | Active |
| 2036 | 0 | 30 |
| 2037 | 0 | 30 |
| 2038 | 0 | 30 |
| 2039 | 0 | 30 |
| 2040 | 0 | 30 |
| 2041 | 0 | 30 |
3 launch locations represented.
| Year | Location | Launches | Confidence | Basis |
|---|---|---|---|---|
| 2026 | Rocket Lab Launch Complex 1B, Mahia Peninsula (Rocket Lab Launch Complex 1, Onenui Station, Mahia Peninsula) | 10 | 75% | LC-1B doubles scheduling flexibility; modeled equal to LC-1A after mature operations. Base remains demand-constrained and far below published opportunity count. |
| 2026 | Wallops Flight Facility / MARS | Launch Complex 2 | 2 | 65% | NASA says LC-2 can support up to 12 launches/year, but U.S. Electron demand and range/customer processing likely keep practical base around 6/year by 2030. |
| 2026 | Rocket Lab Launch Complex 1A, Mahia Peninsula (Rocket Lab Launch Complex 1, Onenui Station, Mahia Peninsula) | 10 | 75% | LC-1A is modeled as half of Rocket Lab's practical Mahia cadence. Base is anchored by Rocket Lab's 21-launch 2025 record, not the theoretical 120 launch opport... |
| 2027 | Rocket Lab Launch Complex 1A, Mahia Peninsula (Rocket Lab Launch Complex 1, Onenui Station, Mahia Peninsula) | 10 | 75% | LC-1A is modeled as half of Rocket Lab's practical Mahia cadence. Base is anchored by Rocket Lab's 21-launch 2025 record, not the theoretical 120 launch opport... |
| 2027 | Rocket Lab Launch Complex 1B, Mahia Peninsula (Rocket Lab Launch Complex 1, Onenui Station, Mahia Peninsula) | 10 | 75% | LC-1B doubles scheduling flexibility; modeled equal to LC-1A after mature operations. Base remains demand-constrained and far below published opportunity count. |
| 2027 | Wallops Flight Facility / MARS | Launch Complex 2 | 3 | 65% | NASA says LC-2 can support up to 12 launches/year, but U.S. Electron demand and range/customer processing likely keep practical base around 6/year by 2030. |
| 2028 | Rocket Lab Launch Complex 1A, Mahia Peninsula (Rocket Lab Launch Complex 1, Onenui Station, Mahia Peninsula) | 11 | 75% | LC-1A is modeled as half of Rocket Lab's practical Mahia cadence. Base is anchored by Rocket Lab's 21-launch 2025 record, not the theoretical 120 launch opport... |
| 2028 | Rocket Lab Launch Complex 1B, Mahia Peninsula (Rocket Lab Launch Complex 1, Onenui Station, Mahia Peninsula) | 11 | 75% | LC-1B doubles scheduling flexibility; modeled equal to LC-1A after mature operations. Base remains demand-constrained and far below published opportunity count. |
| 2028 | Wallops Flight Facility / MARS | Launch Complex 2 | 4 | 65% | NASA says LC-2 can support up to 12 launches/year, but U.S. Electron demand and range/customer processing likely keep practical base around 6/year by 2030. |
| 2029 | Rocket Lab Launch Complex 1A, Mahia Peninsula (Rocket Lab Launch Complex 1, Onenui Station, Mahia Peninsula) | 12 | 75% | LC-1A is modeled as half of Rocket Lab's practical Mahia cadence. Base is anchored by Rocket Lab's 21-launch 2025 record, not the theoretical 120 launch opport... |
| 2029 | Rocket Lab Launch Complex 1B, Mahia Peninsula (Rocket Lab Launch Complex 1, Onenui Station, Mahia Peninsula) | 12 | 75% | LC-1B doubles scheduling flexibility; modeled equal to LC-1A after mature operations. Base remains demand-constrained and far below published opportunity count. |
| 2029 | Wallops Flight Facility / MARS | Launch Complex 2 | 5 | 65% | NASA says LC-2 can support up to 12 launches/year, but U.S. Electron demand and range/customer processing likely keep practical base around 6/year by 2030. |
| 2030 | Rocket Lab Launch Complex 1B, Mahia Peninsula (Rocket Lab Launch Complex 1, Onenui Station, Mahia Peninsula) | 12 | 75% | LC-1B doubles scheduling flexibility; modeled equal to LC-1A after mature operations. Base remains demand-constrained and far below published opportunity count. |
| 2030 | Rocket Lab Launch Complex 1A, Mahia Peninsula (Rocket Lab Launch Complex 1, Onenui Station, Mahia Peninsula) | 12 | 75% | LC-1A is modeled as half of Rocket Lab's practical Mahia cadence. Base is anchored by Rocket Lab's 21-launch 2025 record, not the theoretical 120 launch opport... |
| 2030 | Wallops Flight Facility / MARS | Launch Complex 2 | 6 | 65% | NASA says LC-2 can support up to 12 launches/year, but U.S. Electron demand and range/customer processing likely keep practical base around 6/year by 2030. |
| 2031 | Rocket Lab Launch Complex 1B, Mahia Peninsula (Rocket Lab Launch Complex 1, Onenui Station, Mahia Peninsula) | 12 | 75% | LC-1B doubles scheduling flexibility; modeled equal to LC-1A after mature operations. Base remains demand-constrained and far below published opportunity count. |
| 2031 | Rocket Lab Launch Complex 1A, Mahia Peninsula (Rocket Lab Launch Complex 1, Onenui Station, Mahia Peninsula) | 12 | 75% | LC-1A is modeled as half of Rocket Lab's practical Mahia cadence. Base is anchored by Rocket Lab's 21-launch 2025 record, not the theoretical 120 launch opport... |
| 2031 | Wallops Flight Facility / MARS | Launch Complex 2 | 6 | 65% | NASA says LC-2 can support up to 12 launches/year, but U.S. Electron demand and range/customer processing likely keep practical base around 6/year by 2030. |
| 2032 | Rocket Lab Launch Complex 1B, Mahia Peninsula (Rocket Lab Launch Complex 1, Onenui Station, Mahia Peninsula) | 12 | 75% | LC-1B doubles scheduling flexibility; modeled equal to LC-1A after mature operations. Base remains demand-constrained and far below published opportunity count. |
| 2032 | Rocket Lab Launch Complex 1A, Mahia Peninsula (Rocket Lab Launch Complex 1, Onenui Station, Mahia Peninsula) | 12 | 75% | LC-1A is modeled as half of Rocket Lab's practical Mahia cadence. Base is anchored by Rocket Lab's 21-launch 2025 record, not the theoretical 120 launch opport... |
| 2032 | Wallops Flight Facility / MARS | Launch Complex 2 | 6 | 65% | NASA says LC-2 can support up to 12 launches/year, but U.S. Electron demand and range/customer processing likely keep practical base around 6/year by 2030. |
| 2033 | Rocket Lab Launch Complex 1A, Mahia Peninsula (Rocket Lab Launch Complex 1, Onenui Station, Mahia Peninsula) | 12 | 75% | LC-1A is modeled as half of Rocket Lab's practical Mahia cadence. Base is anchored by Rocket Lab's 21-launch 2025 record, not the theoretical 120 launch opport... |
| 2033 | Rocket Lab Launch Complex 1B, Mahia Peninsula (Rocket Lab Launch Complex 1, Onenui Station, Mahia Peninsula) | 12 | 75% | LC-1B doubles scheduling flexibility; modeled equal to LC-1A after mature operations. Base remains demand-constrained and far below published opportunity count. |
| 2033 | Wallops Flight Facility / MARS | Launch Complex 2 | 6 | 65% | NASA says LC-2 can support up to 12 launches/year, but U.S. Electron demand and range/customer processing likely keep practical base around 6/year by 2030. |
LC-1B doubles scheduling flexibility; modeled equal to LC-1A after mature operations. Base remains demand-constrained and far below published opportunity count.
NASA says LC-2 can support up to 12 launches/year, but U.S. Electron demand and range/customer processing likely keep practical base around 6/year by 2030.
LC-1A is modeled as half of Rocket Lab's practical Mahia cadence. Base is anchored by Rocket Lab's 21-launch 2025 record, not the theoretical 120 launch opportunities.
LC-1A is modeled as half of Rocket Lab's practical Mahia cadence. Base is anchored by Rocket Lab's 21-launch 2025 record, not the theoretical 120 launch opportunities.
Electron |
| Mar 28, 2026 |
| Eight Days A Week | Electron | Mar 20, 2026 |
| Insight At Speed Is A... | Electron | Mar 5, 2026 |
| Bridging the Swarm | Electron | Jan 30, 2026 |
| Cosmos Will See You Now | Electron | Jan 22, 2026 |
Upcoming mission rows with announced launch timing.
| Mission | Variant | Announced |
|---|---|---|
No forecasted missionsNo upcoming announced mission rows are linked to this vehicle family. | ||
LC-1B doubles scheduling flexibility; modeled equal to LC-1A after mature operations. Base remains demand-constrained and far below published opportunity count.
NASA says LC-2 can support up to 12 launches/year, but U.S. Electron demand and range/customer processing likely keep practical base around 6/year by 2030.
LC-1A is modeled as half of Rocket Lab's practical Mahia cadence. Base is anchored by Rocket Lab's 21-launch 2025 record, not the theoretical 120 launch opportunities.
LC-1B doubles scheduling flexibility; modeled equal to LC-1A after mature operations. Base remains demand-constrained and far below published opportunity count.
NASA says LC-2 can support up to 12 launches/year, but U.S. Electron demand and range/customer processing likely keep practical base around 6/year by 2030.
LC-1A is modeled as half of Rocket Lab's practical Mahia cadence. Base is anchored by Rocket Lab's 21-launch 2025 record, not the theoretical 120 launch opportunities.
LC-1B doubles scheduling flexibility; modeled equal to LC-1A after mature operations. Base remains demand-constrained and far below published opportunity count.
NASA says LC-2 can support up to 12 launches/year, but U.S. Electron demand and range/customer processing likely keep practical base around 6/year by 2030.
Rocket Lab identified the root cause of the 2021-05-15 Electron launch failure on 2021-07-19 and declared the vehicle ready to return to flight.
The United States carried out 30 orbital launches in 2021, including Electron launches from New Zealand, with 29 successes and one Electron failure in May.
Rocket Lab uses the Electron rocket’s kick stage as a transfer vehicle and has modified it into the Photon satellite bus.
Issues with NASA’s certification of an autonomous flight termination system have delayed the introduction of Electron launches from Wallops, potentially slipping the first Wallops Electron launch originally scheduled for 2020 to as late as November of an unspecified year.
Rocket Lab built Launch Complex 2 adjacent to Pad 0-A at Wallops Island for its Electron rocket.
Rocket Lab spent about $100,000,000 to reach orbit with its Electron rocket.
Rocket Lab operates the Electron small rocket and plans to develop a larger Neutron vehicle to compete with SpaceX’s Falcon 9.
Rocket Lab developed the Electron small launch vehicle and the Photon satellite bus and plans to develop a medium-class launcher called Neutron.
CAPSTONE is scheduled to launch later 2021 on an Electron rocket from Wallops Island, Virginia.
Rocket Lab's Electron rocket failed to reach orbit on 2021-05-15 when the vehicle’s computer system detected a problem with the second stage engine and shut it down.
The Electron first stage splashed down under parachute after the 2021-05-15 launch and a recovery team placed it on a boat to return to Rocket Lab’s factory.
The upgraded heat shield at the base of the Electron first stage performed well on the 2021-05-15 flight and the stage's engines will undergo hot-fire testing.
Rocket Lab reported that the Electron first stage appeared to perform as expected on 2021-05-15 and did not contribute to the mission failure.
Rocket Lab planned to recover the Electron first stage on the 2021-05-15 mission to test the effectiveness of enhancements made after a 2020-11-01 launch and recovery as part of its effort to make the first stage reusable.
Rocket Lab continued to receive good telemetry from Electron following the safe second stage engine shutdown, providing engineers comprehensive data for review.
Electron’s first stage performed nominally during the 2021-05-15 mission and did not contribute to the flight issue.
Electron completed a nominal first stage engine burn, stage separation, and second stage ignition before the anomaly on 2021-05-15.
Prior to the 2021-05-15 anomaly, Rocket Lab had completed 17 successful Electron missions and deployed more than 100 satellites to orbit.
The 20th Electron mission, launched on 2021-05-15, carried payloads for BlackSky and was named "Running Out Of Toes."
The 2021-05-15 Electron was carrying two imaging satellites for geospatial intelligence company BlackSky.