Polaris Intelligence
Polaris
Intelligence
About
Ctrl K
Sign in
© Polaris Intelligence 2026
PrivacyTermsAdmin

Latest Information

Browse the latest facts and intelligence extracted from space industry sources.

InformationArticlePublished

Latest Information

Browse the latest facts and intelligence extracted from space industry sources.

196,556

total items

0.0-5.0
Results updated
InformationArticlePublished

Nine satellites in the TJSW series were delivered toward geostationary space in 2025.

PlanCapabilityValue 3.5
New TJSW Communications Satellite Lofted Towards Geostationary Space [Long March 7A Y12]
May 26, 2026

Today's launch was the 15th flight of a Long March 7A vehicle, the 26th flight of the Long March 7 series, and the 645th flight of the Long March launch vehicle series.

PlanValue 1.8
New TJSW Communications Satellite Lofted Towards Geostationary Space [Long March 7A Y12]
May 26, 2026

The Long March 7A has only flown from the Wenchang Space Launch Site on Hainan's east coast.

GeneralValue 2.0
New TJSW Communications Satellite Lofted Towards Geostationary Space [Long March 7A Y12]
May 26, 2026

TJSW-24 verifies multi-band, high-throughput communications technologies for radio, television, and data transmission.

CapabilityValue 3.5
New TJSW Communications Satellite Lofted Towards Geostationary Space [Long March 7A Y12]
May 26, 2026

The Long March 7A was developed by the China Academy of Launch Vehicle Technology.

CapabilityGeneralValue 2.0
New TJSW Communications Satellite Lofted Towards Geostationary Space [Long March 7A Y12]
May 26, 2026

The China Launch Vehicle Academy plans to fly the Long March 7 series 12 times in 2026.

PlanGrowthValue 4.0
New TJSW Communications Satellite Lofted Towards Geostationary Space [Long March 7A Y12]
May 26, 2026

A Long March 7A launched from Launch Complex 201 at the Wenchang Space Launch Site at 00:16 China Standard Time on May 27, sending TJSW-24 toward geostationary space.

PlanGeneralValue 2.5
New TJSW Communications Satellite Lofted Towards Geostationary Space [Long March 7A Y12]
May 26, 2026

Construction work on the new dual-bay vehicle assembly building began at the start of 2025.

GrowthPlanValue 3.0
New TJSW Communications Satellite Lofted Towards Geostationary Space [Long March 7A Y12]
May 26, 2026

TJSW-24 is a spacecraft developed by the Shanghai Academy of Spaceflight Technology.

CapabilityGeneralValue 3.6
New TJSW Communications Satellite Lofted Towards Geostationary Space [Long March 7A Y12]
May 26, 2026

The Long March 7A is 60.13 meters tall and weighs 573,000 kilograms when fully fuelled.

CapabilityValue 4.0
New TJSW Communications Satellite Lofted Towards Geostationary Space [Long March 7A Y12]
May 26, 2026

The Long March 7A has a payload capacity of more than 8,000 kilograms to medium Earth transfer orbit, 7,000 kilograms to geostationary transfer orbit, 5,500 kilograms to a 700-kilometer sun-synchronous orbit, and 5,000 kilograms to a trans-lunar trajectory.

CapabilityValue 4.6
New TJSW Communications Satellite Lofted Towards Geostationary Space [Long March 7A Y12]
May 26, 2026

TJSW-24 was the first satellite in its series to launch in just over six months.

PlanGeneralValue 2.0
New TJSW Communications Satellite Lofted Towards Geostationary Space [Long March 7A Y12]
May 26, 2026

NASA’s move away from supporting free-flying stations toward financing a core module reflects a tempered view of future customers for low Earth orbit.

GeneralPlanValue 2.0
Op-ed: Commercial Demand in LEO is Lacking. The Government Can Help.
May 26, 2026

The UK government is working across space, health, and civil-aviation authorities to issue coordinated guidance, provide regulatory proposals, and engage the full supply chain.

LegalGeneralValue 1.6
Op-ed: Commercial Demand in LEO is Lacking. The Government Can Help.
May 26, 2026

Ellen P. Carlin previously served as senior staff for the House Committee on Homeland Security.

GovernanceValue 2.5
Op-ed: Commercial Demand in LEO is Lacking. The Government Can Help.
May 26, 2026

Anne Cheever served as director for technology and national security at the White House National Security Council from 2023 to 2024.

GovernanceValue 4.0
Op-ed: Commercial Demand in LEO is Lacking. The Government Can Help.
May 26, 2026

NASA’s FY27 budget request does not mention support for microgravity-based manufacturing for benefits on Earth.

FinancialLegalValue 2.5
Op-ed: Commercial Demand in LEO is Lacking. The Government Can Help.
May 26, 2026

Anne Cheever is a senior advisor at Pathway Policy Group.

GovernanceValue 3.0
Op-ed: Commercial Demand in LEO is Lacking. The Government Can Help.
May 26, 2026

In 2024, U.S. ventures secured less than half of global space venture capital funding.

FinancialGeneralValue 3.0
Op-ed: Commercial Demand in LEO is Lacking. The Government Can Help.
May 26, 2026

The Trump administration wants to build a vibrant low Earth orbit economy that would attract $50 billion in private investment.

FinancialGeneralValue 2.2
Op-ed: Commercial Demand in LEO is Lacking. The Government Can Help.
May 26, 2026

NASA is shifting from a major investor to an incremental funder in its approach to commercial space stations.

GeneralFinancialValue 2.0
Op-ed: Commercial Demand in LEO is Lacking. The Government Can Help.
May 26, 2026

The UK government has announced a cross-governmental approach to catalyze microgravity innovations and create regulatory clarity for commercialization.

LegalGeneralValue 2.0
Op-ed: Commercial Demand in LEO is Lacking. The Government Can Help.
May 26, 2026

Ellen P. Carlin is a partner at Pathway Policy Group.

GovernanceValue 1.8
Op-ed: Commercial Demand in LEO is Lacking. The Government Can Help.
May 26, 2026

Anne Cheever was a program manager at DARPA.

GovernanceValue 3.0
Op-ed: Commercial Demand in LEO is Lacking. The Government Can Help.
May 26, 2026

In 2024, Europe and China together accounted for more than 50% of global space venture capital funding.

FinancialGrowthValue 3.0
Op-ed: Commercial Demand in LEO is Lacking. The Government Can Help.
May 26, 2026

The U.S. Food and Drug Administration’s conversations with industry about space-manufactured products remain nascent.

LegalValue 1.0
Op-ed: Commercial Demand in LEO is Lacking. The Government Can Help.
May 26, 2026

Ellen P. Carlin co-founded and co-directed the Bipartisan Commission on Biodefense from 2014 to 2017.

GovernanceValue 2.0
Op-ed: Commercial Demand in LEO is Lacking. The Government Can Help.
May 26, 2026

The cold spray technology shows promise for repairing and remanufacturing existing components.

CapabilityValue 2.0
Pioneering High-Pressure Cold Spray Transforms Manufacturing of Complex Copper Rocket Nozzles
May 26, 2026

Calum Hicks is a senior technologist at the Digital Factory within the National Manufacturing Institute Scotland.

GovernanceValue 1.8
Pioneering High-Pressure Cold Spray Transforms Manufacturing of Complex Copper Rocket Nozzles
May 26, 2026

Engineers at the National Manufacturing Institute Scotland developed a new manufacturing route for copper rocket nozzles using high-pressure cold spray technology.

CapabilityGeneralValue 4.0
Pioneering High-Pressure Cold Spray Transforms Manufacturing of Complex Copper Rocket Nozzles
May 26, 2026

The cold spray approach offers a scalable manufacturing route for aerospace, energy, and shipbuilding applications.

CapabilityGrowthGeneralValue 1.8
Pioneering High-Pressure Cold Spray Transforms Manufacturing of Complex Copper Rocket Nozzles
May 26, 2026

The prototype copper rocket nozzle demonstrates that large, high-performance copper components can be produced rapidly with high-pressure cold spray.

CapabilityValue 3.6
Pioneering High-Pressure Cold Spray Transforms Manufacturing of Complex Copper Rocket Nozzles
May 26, 2026

The high-pressure cold spray process can reduce production lead times for large copper parts from several months to a few days.

CapabilityPlanValue 3.0
Pioneering High-Pressure Cold Spray Transforms Manufacturing of Complex Copper Rocket Nozzles
May 26, 2026

The new manufacturing method still requires validation through full-scale rocket engine testing.

CapabilityPlanValue 2.0
Pioneering High-Pressure Cold Spray Transforms Manufacturing of Complex Copper Rocket Nozzles
May 26, 2026

The high-pressure cold spray process can achieve deposition rates of up to ten kilograms per hour.

CapabilityValue 4.0
Pioneering High-Pressure Cold Spray Transforms Manufacturing of Complex Copper Rocket Nozzles
May 26, 2026

Ryan Devine is a senior research and development engineer at the National Manufacturing Institute Scotland.

GovernanceValue 2.0
Pioneering High-Pressure Cold Spray Transforms Manufacturing of Complex Copper Rocket Nozzles
May 26, 2026

Voyager Technologies’ Acceleration Measurement System provides ultra-precise delta-V and acceleration measurements for the Otter mission.

CapabilityValue 4.2
Precision Measurement Hardware Headed to DARPA’s Air-Breathing Spacecraft Program
May 26, 2026

Voyager Technologies’ Acceleration Measurement System will fly aboard the DARPA Otter spacecraft.

CapabilityGeneralValue 4.2
Precision Measurement Hardware Headed to DARPA’s Air-Breathing Spacecraft Program
May 26, 2026

Voyager Technologies’ Acceleration Measurement System traces its heritage to more than a decade of uninterrupted, failure-free operations on NASA’s Space Acceleration Measurement System and Microgravity Acceleration Measurement System instruments.

CapabilityGeneralValue 3.8
Precision Measurement Hardware Headed to DARPA’s Air-Breathing Spacecraft Program
May 26, 2026

Redwire awarded Voyager Technologies a subcontract to supply a high-precision Acceleration Measurement System for the DARPA Otter spacecraft.

RelationshipsCapabilityPlanValue 4.4
Precision Measurement Hardware Headed to DARPA’s Air-Breathing Spacecraft Program
May 26, 2026

Redwire is a publicly traded space technology company with a portfolio spanning deployable structures, power systems, and advanced manufacturing.

GeneralValue 2.0
Precision Measurement Hardware Headed to DARPA’s Air-Breathing Spacecraft Program
May 26, 2026

Voyager Technologies’ precision measurement capabilities supported NASA’s Magnetospheric Multiscale constellation.

CapabilityRelationshipsValue 4.0
Precision Measurement Hardware Headed to DARPA’s Air-Breathing Spacecraft Program
May 26, 2026

DARPA Otter is developing a first-of-its-kind air-breathing spacecraft capable of sustained operations in very low Earth orbit.

CapabilityValue 4.0
Precision Measurement Hardware Headed to DARPA’s Air-Breathing Spacecraft Program
May 26, 2026

NASA’s partnership with SpaceX has helped maintain the United States’ presence in space.

RelationshipsGeneralValue 2.2
Reassessing NASA procurement strategy: A hybrid approach
May 26, 2026

The Perseverance rover cost $300 million less than Curiosity by reusing the same design and spare parts.

FinancialCapabilityValue 3.5
Reassessing NASA procurement strategy: A hybrid approach
May 26, 2026

NASA’s Office of Inspector General concluded that private industry was not mature enough to handle lunar exploration with minimal oversight and funding.

LegalValue 2.0
Reassessing NASA procurement strategy: A hybrid approach
May 26, 2026

Boeing’s Starliner failed to dock with the International Space Station on its first test flight because of an internal clock failure.

CapabilityGeneralValue 4.0
Reassessing NASA procurement strategy: A hybrid approach
May 26, 2026

NASA’s Space Launch System has reached per-vehicle production costs of $2.5 billion, excluding Orion and ground systems.

FinancialGeneralValue 4.5
Reassessing NASA procurement strategy: A hybrid approach
May 26, 2026

NASA’s low-cost Discovery-class planetary science probes have a cost cap of $500 million per mission.

FinancialValue 4.0
Reassessing NASA procurement strategy: A hybrid approach
May 26, 2026

SpaceX’s Dragon capsule has supported commercial Polaris and Axiom missions carrying private astronauts.

GeneralRelationshipsValue 3.8
Reassessing NASA procurement strategy: A hybrid approach
May 26, 2026

Nine satellites in the TJSW series were delivered toward geostationary space in 2025.

PlanCapabilityValue 3.5
New TJSW Communications Satellite Lofted Towards Geostationary Space [Long March 7A Y12]
May 26, 2026

Today's launch was the 15th flight of a Long March 7A vehicle, the 26th flight of the Long March 7 series, and the 645th flight of the Long March launch vehicle series.

PlanValue 1.8
New TJSW Communications Satellite Lofted Towards Geostationary Space [Long March 7A Y12]
May 26, 2026

The Long March 7A has only flown from the Wenchang Space Launch Site on Hainan's east coast.

GeneralValue 2.0
New TJSW Communications Satellite Lofted Towards Geostationary Space [Long March 7A Y12]
May 26, 2026

TJSW-24 verifies multi-band, high-throughput communications technologies for radio, television, and data transmission.

CapabilityValue 3.5
New TJSW Communications Satellite Lofted Towards Geostationary Space [Long March 7A Y12]
May 26, 2026

The Long March 7A was developed by the China Academy of Launch Vehicle Technology.

CapabilityGeneralValue 2.0
New TJSW Communications Satellite Lofted Towards Geostationary Space [Long March 7A Y12]
May 26, 2026

The China Launch Vehicle Academy plans to fly the Long March 7 series 12 times in 2026.

PlanGrowthValue 4.0
New TJSW Communications Satellite Lofted Towards Geostationary Space [Long March 7A Y12]
May 26, 2026

A Long March 7A launched from Launch Complex 201 at the Wenchang Space Launch Site at 00:16 China Standard Time on May 27, sending TJSW-24 toward geostationary space.

PlanGeneralValue 2.5
New TJSW Communications Satellite Lofted Towards Geostationary Space [Long March 7A Y12]
May 26, 2026

Construction work on the new dual-bay vehicle assembly building began at the start of 2025.

GrowthPlanValue 3.0
New TJSW Communications Satellite Lofted Towards Geostationary Space [Long March 7A Y12]
May 26, 2026

TJSW-24 is a spacecraft developed by the Shanghai Academy of Spaceflight Technology.

CapabilityGeneralValue 3.6
New TJSW Communications Satellite Lofted Towards Geostationary Space [Long March 7A Y12]
May 26, 2026

The Long March 7A is 60.13 meters tall and weighs 573,000 kilograms when fully fuelled.

CapabilityValue 4.0
New TJSW Communications Satellite Lofted Towards Geostationary Space [Long March 7A Y12]
May 26, 2026

The Long March 7A has a payload capacity of more than 8,000 kilograms to medium Earth transfer orbit, 7,000 kilograms to geostationary transfer orbit, 5,500 kilograms to a 700-kilometer sun-synchronous orbit, and 5,000 kilograms to a trans-lunar trajectory.

CapabilityValue 4.6
New TJSW Communications Satellite Lofted Towards Geostationary Space [Long March 7A Y12]
May 26, 2026

TJSW-24 was the first satellite in its series to launch in just over six months.

PlanGeneralValue 2.0
New TJSW Communications Satellite Lofted Towards Geostationary Space [Long March 7A Y12]
May 26, 2026

NASA’s move away from supporting free-flying stations toward financing a core module reflects a tempered view of future customers for low Earth orbit.

GeneralPlanValue 2.0
Op-ed: Commercial Demand in LEO is Lacking. The Government Can Help.
May 26, 2026

The UK government is working across space, health, and civil-aviation authorities to issue coordinated guidance, provide regulatory proposals, and engage the full supply chain.

LegalGeneralValue 1.6
Op-ed: Commercial Demand in LEO is Lacking. The Government Can Help.
May 26, 2026

Ellen P. Carlin previously served as senior staff for the House Committee on Homeland Security.

GovernanceValue 2.5
Op-ed: Commercial Demand in LEO is Lacking. The Government Can Help.
May 26, 2026

Anne Cheever served as director for technology and national security at the White House National Security Council from 2023 to 2024.

GovernanceValue 4.0
Op-ed: Commercial Demand in LEO is Lacking. The Government Can Help.
May 26, 2026

NASA’s FY27 budget request does not mention support for microgravity-based manufacturing for benefits on Earth.

FinancialLegalValue 2.5
Op-ed: Commercial Demand in LEO is Lacking. The Government Can Help.
May 26, 2026

Anne Cheever is a senior advisor at Pathway Policy Group.

GovernanceValue 3.0
Op-ed: Commercial Demand in LEO is Lacking. The Government Can Help.
May 26, 2026

In 2024, U.S. ventures secured less than half of global space venture capital funding.

FinancialGeneralValue 3.0
Op-ed: Commercial Demand in LEO is Lacking. The Government Can Help.
May 26, 2026

The Trump administration wants to build a vibrant low Earth orbit economy that would attract $50 billion in private investment.

FinancialGeneralValue 2.2
Op-ed: Commercial Demand in LEO is Lacking. The Government Can Help.
May 26, 2026

NASA is shifting from a major investor to an incremental funder in its approach to commercial space stations.

GeneralFinancialValue 2.0
Op-ed: Commercial Demand in LEO is Lacking. The Government Can Help.
May 26, 2026

The UK government has announced a cross-governmental approach to catalyze microgravity innovations and create regulatory clarity for commercialization.

LegalGeneralValue 2.0
Op-ed: Commercial Demand in LEO is Lacking. The Government Can Help.
May 26, 2026

Ellen P. Carlin is a partner at Pathway Policy Group.

GovernanceValue 1.8
Op-ed: Commercial Demand in LEO is Lacking. The Government Can Help.
May 26, 2026

Anne Cheever was a program manager at DARPA.

GovernanceValue 3.0
Op-ed: Commercial Demand in LEO is Lacking. The Government Can Help.
May 26, 2026

In 2024, Europe and China together accounted for more than 50% of global space venture capital funding.

FinancialGrowthValue 3.0
Op-ed: Commercial Demand in LEO is Lacking. The Government Can Help.
May 26, 2026

The U.S. Food and Drug Administration’s conversations with industry about space-manufactured products remain nascent.

LegalValue 1.0
Op-ed: Commercial Demand in LEO is Lacking. The Government Can Help.
May 26, 2026

Ellen P. Carlin co-founded and co-directed the Bipartisan Commission on Biodefense from 2014 to 2017.

GovernanceValue 2.0
Op-ed: Commercial Demand in LEO is Lacking. The Government Can Help.
May 26, 2026

The cold spray technology shows promise for repairing and remanufacturing existing components.

CapabilityValue 2.0
Pioneering High-Pressure Cold Spray Transforms Manufacturing of Complex Copper Rocket Nozzles
May 26, 2026

Calum Hicks is a senior technologist at the Digital Factory within the National Manufacturing Institute Scotland.

GovernanceValue 1.8
Pioneering High-Pressure Cold Spray Transforms Manufacturing of Complex Copper Rocket Nozzles
May 26, 2026

Engineers at the National Manufacturing Institute Scotland developed a new manufacturing route for copper rocket nozzles using high-pressure cold spray technology.

CapabilityGeneralValue 4.0
Pioneering High-Pressure Cold Spray Transforms Manufacturing of Complex Copper Rocket Nozzles
May 26, 2026

The cold spray approach offers a scalable manufacturing route for aerospace, energy, and shipbuilding applications.

CapabilityGrowthGeneralValue 1.8

The prototype copper rocket nozzle demonstrates that large, high-performance copper components can be produced rapidly with high-pressure cold spray.

CapabilityValue 3.6
Pioneering High-Pressure Cold Spray Transforms Manufacturing of Complex Copper Rocket Nozzles
May 26, 2026

The high-pressure cold spray process can reduce production lead times for large copper parts from several months to a few days.

CapabilityPlanValue 3.0
Pioneering High-Pressure Cold Spray Transforms Manufacturing of Complex Copper Rocket Nozzles
May 26, 2026

The new manufacturing method still requires validation through full-scale rocket engine testing.

CapabilityPlanValue 2.0
Pioneering High-Pressure Cold Spray Transforms Manufacturing of Complex Copper Rocket Nozzles
May 26, 2026

The high-pressure cold spray process can achieve deposition rates of up to ten kilograms per hour.

CapabilityValue 4.0
Pioneering High-Pressure Cold Spray Transforms Manufacturing of Complex Copper Rocket Nozzles
May 26, 2026

Ryan Devine is a senior research and development engineer at the National Manufacturing Institute Scotland.

GovernanceValue 2.0
Pioneering High-Pressure Cold Spray Transforms Manufacturing of Complex Copper Rocket Nozzles
May 26, 2026

Voyager Technologies’ Acceleration Measurement System provides ultra-precise delta-V and acceleration measurements for the Otter mission.

CapabilityValue 4.2
Precision Measurement Hardware Headed to DARPA’s Air-Breathing Spacecraft Program
May 26, 2026

Voyager Technologies’ Acceleration Measurement System will fly aboard the DARPA Otter spacecraft.

CapabilityGeneralValue 4.2
Precision Measurement Hardware Headed to DARPA’s Air-Breathing Spacecraft Program
May 26, 2026

Voyager Technologies’ Acceleration Measurement System traces its heritage to more than a decade of uninterrupted, failure-free operations on NASA’s Space Acceleration Measurement System and Microgravity Acceleration Measurement System instruments.

CapabilityGeneralValue 3.8
Precision Measurement Hardware Headed to DARPA’s Air-Breathing Spacecraft Program
May 26, 2026

Redwire awarded Voyager Technologies a subcontract to supply a high-precision Acceleration Measurement System for the DARPA Otter spacecraft.

RelationshipsCapabilityPlanValue 4.4

Redwire is a publicly traded space technology company with a portfolio spanning deployable structures, power systems, and advanced manufacturing.

GeneralValue 2.0
Precision Measurement Hardware Headed to DARPA’s Air-Breathing Spacecraft Program
May 26, 2026

Voyager Technologies’ precision measurement capabilities supported NASA’s Magnetospheric Multiscale constellation.

CapabilityRelationshipsValue 4.0
Precision Measurement Hardware Headed to DARPA’s Air-Breathing Spacecraft Program
May 26, 2026

DARPA Otter is developing a first-of-its-kind air-breathing spacecraft capable of sustained operations in very low Earth orbit.

CapabilityValue 4.0
Precision Measurement Hardware Headed to DARPA’s Air-Breathing Spacecraft Program
May 26, 2026

NASA’s partnership with SpaceX has helped maintain the United States’ presence in space.

RelationshipsGeneralValue 2.2
Reassessing NASA procurement strategy: A hybrid approach
May 26, 2026

The Perseverance rover cost $300 million less than Curiosity by reusing the same design and spare parts.

FinancialCapabilityValue 3.5
Reassessing NASA procurement strategy: A hybrid approach
May 26, 2026

NASA’s Office of Inspector General concluded that private industry was not mature enough to handle lunar exploration with minimal oversight and funding.

LegalValue 2.0
Reassessing NASA procurement strategy: A hybrid approach
May 26, 2026

Boeing’s Starliner failed to dock with the International Space Station on its first test flight because of an internal clock failure.

CapabilityGeneralValue 4.0
Reassessing NASA procurement strategy: A hybrid approach
May 26, 2026

NASA’s Space Launch System has reached per-vehicle production costs of $2.5 billion, excluding Orion and ground systems.

FinancialGeneralValue 4.5
Reassessing NASA procurement strategy: A hybrid approach
May 26, 2026

NASA’s low-cost Discovery-class planetary science probes have a cost cap of $500 million per mission.

FinancialValue 4.0
Reassessing NASA procurement strategy: A hybrid approach
May 26, 2026

SpaceX’s Dragon capsule has supported commercial Polaris and Axiom missions carrying private astronauts.

GeneralRelationshipsValue 3.8
Reassessing NASA procurement strategy: A hybrid approach
May 26, 2026
Previous
Page377of3932
Next
Pioneering High-Pressure Cold Spray Transforms Manufacturing of Complex Copper Rocket Nozzles
May 26, 2026
Precision Measurement Hardware Headed to DARPA’s Air-Breathing Spacecraft Program
May 26, 2026