Polaris Intelligence
Polaris
Intelligence
About
Ctrl K
Sign in
© Polaris Intelligence 2026
PrivacyTermsAdmin

Latest Information

Browse the latest facts and intelligence extracted from space industry sources.

InformationArticlePublished

Latest Information

Browse the latest facts and intelligence extracted from space industry sources.

196,556

total items

0.0-5.0
Results updated
InformationArticlePublished

OBA – Orbital Boost Aerospace is a Málaga startup focused on orbital logistics, access to high orbits, and deorbiting services.

GeneralCapabilityValue 2.3
Seis startups inician su andadura en el ESA BIC Andalucía
May 27, 2026

Hisperion is a Seville-based startup specializing in software for simulating space missions.

GeneralValue 1.5
Seis startups inician su andadura en el ESA BIC Andalucía
May 27, 2026

The Agencia Espacial Española (AEE), the Junta de Andalucía, and the Ayuntamiento de Sevilla back ESA BIC Andalucía.

RelationshipsValue 3.5
Seis startups inician su andadura en el ESA BIC Andalucía
May 27, 2026

Albor Space is a deep-tech spin-off from the University of Málaga that develops space communications solutions based on software-defined radio.

CapabilityGeneralValue 3.2
Seis startups inician su andadura en el ESA BIC Andalucía
May 27, 2026

YNSAT is a Malaga-based SaaS company that offers satellite remote-sensing tools for the mining and environmental sectors.

GeneralValue 2.0
Seis startups inician su andadura en el ESA BIC Andalucía
May 27, 2026

Hisperion’s Orbita product simulates and visualizes complex space missions with high-fidelity orbital and attitude physics.

CapabilityValue 3.5
Seis startups inician su andadura en el ESA BIC Andalucía
May 27, 2026

YNSAT’s products are designed to monitor operations, manage waste, and support regulatory compliance using Earth observation data.

CapabilityLegalGeneralValue 3.0
Seis startups inician su andadura en el ESA BIC Andalucía
May 27, 2026

The EVA includes inspection of one Kurs antenna on Progress MS-33 that failed to deploy after launch.

CapabilityPlanValue 3.6
Sergey Mikaev is now outside of the Poisk module. The EVA is expected to last for about 5 hours and 27 minutes, ending at ~22:45 Moscow Time (19:45 UTC). Looks like they will also have a look at the one Kurs antenna of Progress MS-33, that failed to deploy after launch.
May 27, 2026

Giorgia Meloni linked Italy’s industrial strategy to manufacturing, innovation, energy, strategic autonomy, and advanced technology.

LegalGeneralValue 1.2
“Sic itur ad astra”: Meloni porta l’economia dello spazio al centro della strategia industriale italiana
May 27, 2026

Meloni associated the space economy with telecommunications, Earth observation, security, data, artificial intelligence, defense, and critical infrastructure.

GeneralValue 1.2
“Sic itur ad astra”: Meloni porta l’economia dello spazio al centro della strategia industriale italiana
May 27, 2026

Giorgia Meloni identified the space economy as one of Italy’s decisive areas for competitiveness.

GeneralValue 1.2
“Sic itur ad astra”: Meloni porta l’economia dello spazio al centro della strategia industriale italiana
May 27, 2026

Giorgia Meloni intervened at the Confindustria Assembly.

GovernanceValue 1.0
“Sic itur ad astra”: Meloni porta l’economia dello spazio al centro della strategia industriale italiana
May 27, 2026

SITAEL employs about 280 people.

GrowthValue 2.3
SITAEL presenta il piano industriale fino al 2031
May 27, 2026

SITAEL presented its growth strategy at SmallSat Europe Amsterdam.

GeneralGrowthValue 1.8
SITAEL presenta il piano industriale fino al 2031
May 27, 2026

Eycore recently launched its first synthetic aperture radar satellites.

PlanCapabilityValue 3.0
SITAEL presenta il piano industriale fino al 2031
May 27, 2026

VITO and the University of Zurich will handle data processing and the scientific case for HiBiDiS.

RelationshipsCapabilityValue 3.8
SITAEL presenta il piano industriale fino al 2031
May 27, 2026

SITAEL inaugurated a Hall-effect electric propulsion production line in Pisa in July 2025.

GrowthCapabilityValue 4.0
SITAEL presenta il piano industriale fino al 2031
May 27, 2026

SITAEL signed a memorandum of understanding with Eycore, a Polish SAR services provider.

RelationshipsValue 4.0
SITAEL presenta il piano industriale fino al 2031
May 27, 2026

The SITAEL-Eycore agreement is intended to explore collaborations in Earth observation, SAR applications, and advanced satellite services.

RelationshipsValue 2.8
SITAEL presenta il piano industriale fino al 2031
May 27, 2026

SITAEL plans to grow revenue from about 60 million euros to about 200 million euros by 2031.

GrowthFinancialValue 4.5
SITAEL presenta il piano industriale fino al 2031
May 27, 2026

SITAEL’s Mola di Bari site has an advanced clean room and five satellites under simultaneous construction.

CapabilityGrowthValue 4.0
SITAEL presenta il piano industriale fino al 2031
May 27, 2026

HiBiDiS makes SITAEL the prime contractor for a complete ESA mission.

RelationshipsValue 4.0
SITAEL presenta il piano industriale fino al 2031
May 27, 2026

SITAEL operates two industrial hubs in Italy, in Mola di Bari and Pisa.

CapabilityGeneralValue 3.5
SITAEL presenta il piano industriale fino al 2031
May 27, 2026

SITAEL’s backlog exceeds 150 million euros.

FinancialValue 4.0
SITAEL presenta il piano industriale fino al 2031
May 27, 2026

HiBiDiS is scheduled for launch in 2030.

PlanValue 3.5
SITAEL presenta il piano industriale fino al 2031
May 27, 2026

SITAEL has at least 10% net annual workforce growth.

GrowthValue 2.3
SITAEL presenta il piano industriale fino al 2031
May 27, 2026

SITAEL has completed 29 space missions.

GeneralValue 2.0
SITAEL presenta il piano industriale fino al 2031
May 27, 2026

SITAEL expects EBITDA to rise from 12% toward 25%.

FinancialValue 3.5
SITAEL presenta il piano industriale fino al 2031
May 27, 2026

SITAEL and ESA have started the concept of a propellantless RAM-EP thruster for very low Earth orbits.

CapabilityGeneralValue 3.5
SITAEL presenta il piano industriale fino al 2031
May 27, 2026

SITAEL is an Italian private space company within Angel Holding.

RelationshipsGeneralValue 2.2
SITAEL presenta il piano industriale fino al 2031
May 27, 2026

SITAEL’s pipeline includes nine launches between 2026/2027 and 2030.

PlanValue 4.0
SITAEL presenta il piano industriale fino al 2031
May 27, 2026

HiBiDiS is built on SITAEL’s EMPYREUM platform.

CapabilityRelationshipsValue 3.8
SITAEL presenta il piano industriale fino al 2031
May 27, 2026

The SITAEL launch pipeline includes PLATINO 1, EAGLE-1, five IRIDE satellites, PLATINO 2, and ESA’s Scout HiBiDiS mission.

PlanCapabilityGeneralValue 4.0
SITAEL presenta il piano industriale fino al 2031
May 27, 2026

SITAEL has eight satellites under construction, two platforms in development, and thrusters in qualification.

PlanCapabilityGrowthValue 4.0
SITAEL presenta il piano industriale fino al 2031
May 27, 2026

AMOS will provide the hyperspectral instrument for HiBiDiS.

CapabilityRelationshipsValue 3.8
SITAEL presenta il piano industriale fino al 2031
May 27, 2026

SITAEL’s growth plan is based on ten years of investment in satellite platforms, electric propulsion, and manufacturing infrastructure.

GrowthCapabilityValue 3.0
SITAEL presenta il piano industriale fino al 2031
May 27, 2026

SITAEL develops satellite solutions based on its NextGen and EMPYREUM platforms.

CapabilityGeneralValue 4.0
SITAEL presenta il piano industriale fino al 2031
May 27, 2026

ANGI collaborated with the offices of the European Parliament in Italy to promote a strategic dialogue on the role of artificial intelligence in future space infrastructure and services.

GeneralLegalValue 1.8
Space Economy, a Roma confronto su AI e innovazione orbitale
May 27, 2026

Carlo Corazza is the Director of the offices of the European Parliament in Italy.

GovernanceValue 3.2
Space Economy, a Roma confronto su AI e innovazione orbitale
May 27, 2026

Gabriele Ferrieri is the President of ANGI.

GovernanceValue 3.4
Space Economy, a Roma confronto su AI e innovazione orbitale
May 27, 2026

Sergey Mikaev is the flight engineer for VKD-66 and will perform the 1st EVA.

GovernancePlanValue 3.6
The EVA is scheduled to start today at 17:15 Moscow Time (14:15 UTC)
May 27, 2026

Sergey Kud-Sverchkov is the commander for VKD-66 and will perform the 2nd EVA.

GovernancePlanValue 3.0
The EVA is scheduled to start today at 17:15 Moscow Time (14:15 UTC)
May 27, 2026

Extravehicular Activity VKD-66 is planned to install the Solntse-Teragerts solar radiotelescope.

PlanCapabilityValue 4.0
The EVA is scheduled to start today at 17:15 Moscow Time (14:15 UTC)
May 27, 2026

The EVA is scheduled to start at 17:15 Moscow Time on May 27, 2026.

PlanGeneralValue 2.2
The EVA is scheduled to start today at 17:15 Moscow Time (14:15 UTC)
May 27, 2026

Sergey Kud-Sverchkov is assigned to spacesuit Orlan-MKS No. 7 for VKD-66.

CapabilityGeneralValue 3.6
The EVA is scheduled to start today at 17:15 Moscow Time (14:15 UTC)
May 27, 2026

Sergey Mikaev is assigned to spacesuit Orlan-MKS No. 6 for VKD-66.

GovernanceValue 3.0
The EVA is scheduled to start today at 17:15 Moscow Time (14:15 UTC)
May 27, 2026

The Russian crew aboard the International Space Station is training for the May 27 spacewalk.

PlanValue 3.0
The EVA is scheduled to start today at 17:15 Moscow Time (14:15 UTC)
May 27, 2026

i-Space’s Hyperbola-1 launch vehicle still has a success rate of about 50%.

CapabilityValue 3.0
You know @SpaceX is doing sth right w/ Starship when Chinese private LSP i-Space (whose Hyperbola-1 still struggles w/ 50% success & methane/LOX Hyperbola-3 some ways from flying) has an article detailing Starship V3 & Flight 12 & “lessons to be learnt”…
May 27, 2026

i-Space’s methane-oxygen Hyperbola-3 launch vehicle is still some way from flying.

PlanValue 2.0
You know @SpaceX is doing sth right w/ Starship when Chinese private LSP i-Space (whose Hyperbola-1 still struggles w/ 50% success & methane/LOX Hyperbola-3 some ways from flying) has an article detailing Starship V3 & Flight 12 & “lessons to be learnt”…
May 27, 2026

European government and industry officials agreed that the draft EU Space Act was still far from ready for government approval after 11 months and two revisions.

LegalGeneralValue 2.0
11 months and 2 revisions later, EU Space Act still appears to be far from ready for government approval
May 26, 2026

OBA – Orbital Boost Aerospace is a Málaga startup focused on orbital logistics, access to high orbits, and deorbiting services.

GeneralCapabilityValue 2.3
Seis startups inician su andadura en el ESA BIC Andalucía
May 27, 2026

Hisperion is a Seville-based startup specializing in software for simulating space missions.

GeneralValue 1.5
Seis startups inician su andadura en el ESA BIC Andalucía
May 27, 2026

The Agencia Espacial Española (AEE), the Junta de Andalucía, and the Ayuntamiento de Sevilla back ESA BIC Andalucía.

RelationshipsValue 3.5
Seis startups inician su andadura en el ESA BIC Andalucía
May 27, 2026

Albor Space is a deep-tech spin-off from the University of Málaga that develops space communications solutions based on software-defined radio.

CapabilityGeneralValue 3.2
Seis startups inician su andadura en el ESA BIC Andalucía
May 27, 2026

YNSAT is a Malaga-based SaaS company that offers satellite remote-sensing tools for the mining and environmental sectors.

GeneralValue 2.0
Seis startups inician su andadura en el ESA BIC Andalucía
May 27, 2026

Hisperion’s Orbita product simulates and visualizes complex space missions with high-fidelity orbital and attitude physics.

CapabilityValue 3.5
Seis startups inician su andadura en el ESA BIC Andalucía
May 27, 2026

YNSAT’s products are designed to monitor operations, manage waste, and support regulatory compliance using Earth observation data.

CapabilityLegalGeneralValue 3.0

The EVA includes inspection of one Kurs antenna on Progress MS-33 that failed to deploy after launch.

CapabilityPlanValue 3.6
Sergey Mikaev is now outside of the Poisk module. The EVA is expected to last for about 5 hours and 27 minutes, ending at ~22:45 Moscow Time (19:45 UTC). Looks like they will also have a look at the one Kurs antenna of Progress MS-33, that failed to deploy after launch.
May 27, 2026

Giorgia Meloni linked Italy’s industrial strategy to manufacturing, innovation, energy, strategic autonomy, and advanced technology.

LegalGeneralValue 1.2
“Sic itur ad astra”: Meloni porta l’economia dello spazio al centro della strategia industriale italiana
May 27, 2026

Meloni associated the space economy with telecommunications, Earth observation, security, data, artificial intelligence, defense, and critical infrastructure.

GeneralValue 1.2
“Sic itur ad astra”: Meloni porta l’economia dello spazio al centro della strategia industriale italiana
May 27, 2026

Giorgia Meloni identified the space economy as one of Italy’s decisive areas for competitiveness.

GeneralValue 1.2
“Sic itur ad astra”: Meloni porta l’economia dello spazio al centro della strategia industriale italiana
May 27, 2026

Giorgia Meloni intervened at the Confindustria Assembly.

GovernanceValue 1.0
“Sic itur ad astra”: Meloni porta l’economia dello spazio al centro della strategia industriale italiana
May 27, 2026

SITAEL employs about 280 people.

GrowthValue 2.3
SITAEL presenta il piano industriale fino al 2031
May 27, 2026

SITAEL presented its growth strategy at SmallSat Europe Amsterdam.

GeneralGrowthValue 1.8
SITAEL presenta il piano industriale fino al 2031
May 27, 2026

Eycore recently launched its first synthetic aperture radar satellites.

PlanCapabilityValue 3.0
SITAEL presenta il piano industriale fino al 2031
May 27, 2026

VITO and the University of Zurich will handle data processing and the scientific case for HiBiDiS.

RelationshipsCapabilityValue 3.8
SITAEL presenta il piano industriale fino al 2031
May 27, 2026

SITAEL inaugurated a Hall-effect electric propulsion production line in Pisa in July 2025.

GrowthCapabilityValue 4.0
SITAEL presenta il piano industriale fino al 2031
May 27, 2026

SITAEL signed a memorandum of understanding with Eycore, a Polish SAR services provider.

RelationshipsValue 4.0
SITAEL presenta il piano industriale fino al 2031
May 27, 2026

The SITAEL-Eycore agreement is intended to explore collaborations in Earth observation, SAR applications, and advanced satellite services.

RelationshipsValue 2.8
SITAEL presenta il piano industriale fino al 2031
May 27, 2026

SITAEL plans to grow revenue from about 60 million euros to about 200 million euros by 2031.

GrowthFinancialValue 4.5
SITAEL presenta il piano industriale fino al 2031
May 27, 2026

SITAEL’s Mola di Bari site has an advanced clean room and five satellites under simultaneous construction.

CapabilityGrowthValue 4.0
SITAEL presenta il piano industriale fino al 2031
May 27, 2026

HiBiDiS makes SITAEL the prime contractor for a complete ESA mission.

RelationshipsValue 4.0
SITAEL presenta il piano industriale fino al 2031
May 27, 2026

SITAEL operates two industrial hubs in Italy, in Mola di Bari and Pisa.

CapabilityGeneralValue 3.5
SITAEL presenta il piano industriale fino al 2031
May 27, 2026

SITAEL’s backlog exceeds 150 million euros.

FinancialValue 4.0
SITAEL presenta il piano industriale fino al 2031
May 27, 2026

HiBiDiS is scheduled for launch in 2030.

PlanValue 3.5
SITAEL presenta il piano industriale fino al 2031
May 27, 2026

SITAEL has at least 10% net annual workforce growth.

GrowthValue 2.3
SITAEL presenta il piano industriale fino al 2031
May 27, 2026

SITAEL has completed 29 space missions.

GeneralValue 2.0
SITAEL presenta il piano industriale fino al 2031
May 27, 2026

SITAEL expects EBITDA to rise from 12% toward 25%.

FinancialValue 3.5
SITAEL presenta il piano industriale fino al 2031
May 27, 2026

SITAEL and ESA have started the concept of a propellantless RAM-EP thruster for very low Earth orbits.

CapabilityGeneralValue 3.5
SITAEL presenta il piano industriale fino al 2031
May 27, 2026

SITAEL is an Italian private space company within Angel Holding.

RelationshipsGeneralValue 2.2
SITAEL presenta il piano industriale fino al 2031
May 27, 2026

SITAEL’s pipeline includes nine launches between 2026/2027 and 2030.

PlanValue 4.0
SITAEL presenta il piano industriale fino al 2031
May 27, 2026

HiBiDiS is built on SITAEL’s EMPYREUM platform.

CapabilityRelationshipsValue 3.8
SITAEL presenta il piano industriale fino al 2031
May 27, 2026

The SITAEL launch pipeline includes PLATINO 1, EAGLE-1, five IRIDE satellites, PLATINO 2, and ESA’s Scout HiBiDiS mission.

PlanCapabilityGeneralValue 4.0

SITAEL has eight satellites under construction, two platforms in development, and thrusters in qualification.

PlanCapabilityGrowthValue 4.0

AMOS will provide the hyperspectral instrument for HiBiDiS.

CapabilityRelationshipsValue 3.8
SITAEL presenta il piano industriale fino al 2031
May 27, 2026

SITAEL’s growth plan is based on ten years of investment in satellite platforms, electric propulsion, and manufacturing infrastructure.

GrowthCapabilityValue 3.0
SITAEL presenta il piano industriale fino al 2031
May 27, 2026

SITAEL develops satellite solutions based on its NextGen and EMPYREUM platforms.

CapabilityGeneralValue 4.0
SITAEL presenta il piano industriale fino al 2031
May 27, 2026

ANGI collaborated with the offices of the European Parliament in Italy to promote a strategic dialogue on the role of artificial intelligence in future space infrastructure and services.

GeneralLegalValue 1.8
Space Economy, a Roma confronto su AI e innovazione orbitale
May 27, 2026

Carlo Corazza is the Director of the offices of the European Parliament in Italy.

GovernanceValue 3.2
Space Economy, a Roma confronto su AI e innovazione orbitale
May 27, 2026

Gabriele Ferrieri is the President of ANGI.

GovernanceValue 3.4
Space Economy, a Roma confronto su AI e innovazione orbitale
May 27, 2026

Sergey Mikaev is the flight engineer for VKD-66 and will perform the 1st EVA.

GovernancePlanValue 3.6
The EVA is scheduled to start today at 17:15 Moscow Time (14:15 UTC)
May 27, 2026

Sergey Kud-Sverchkov is the commander for VKD-66 and will perform the 2nd EVA.

GovernancePlanValue 3.0
The EVA is scheduled to start today at 17:15 Moscow Time (14:15 UTC)
May 27, 2026

Extravehicular Activity VKD-66 is planned to install the Solntse-Teragerts solar radiotelescope.

PlanCapabilityValue 4.0
The EVA is scheduled to start today at 17:15 Moscow Time (14:15 UTC)
May 27, 2026

The EVA is scheduled to start at 17:15 Moscow Time on May 27, 2026.

PlanGeneralValue 2.2
The EVA is scheduled to start today at 17:15 Moscow Time (14:15 UTC)
May 27, 2026

Sergey Kud-Sverchkov is assigned to spacesuit Orlan-MKS No. 7 for VKD-66.

CapabilityGeneralValue 3.6
The EVA is scheduled to start today at 17:15 Moscow Time (14:15 UTC)
May 27, 2026

Sergey Mikaev is assigned to spacesuit Orlan-MKS No. 6 for VKD-66.

GovernanceValue 3.0
The EVA is scheduled to start today at 17:15 Moscow Time (14:15 UTC)
May 27, 2026

The Russian crew aboard the International Space Station is training for the May 27 spacewalk.

PlanValue 3.0
The EVA is scheduled to start today at 17:15 Moscow Time (14:15 UTC)
May 27, 2026

i-Space’s Hyperbola-1 launch vehicle still has a success rate of about 50%.

CapabilityValue 3.0
You know @SpaceX is doing sth right w/ Starship when Chinese private LSP i-Space (whose Hyperbola-1 still struggles w/ 50% success & methane/LOX Hyperbola-3 some ways from flying) has an article detailing Starship V3 & Flight 12 & “lessons to be learnt”…
May 27, 2026

i-Space’s methane-oxygen Hyperbola-3 launch vehicle is still some way from flying.

PlanValue 2.0
You know @SpaceX is doing sth right w/ Starship when Chinese private LSP i-Space (whose Hyperbola-1 still struggles w/ 50% success & methane/LOX Hyperbola-3 some ways from flying) has an article detailing Starship V3 & Flight 12 & “lessons to be learnt”…
May 27, 2026

European government and industry officials agreed that the draft EU Space Act was still far from ready for government approval after 11 months and two revisions.

LegalGeneralValue 2.0
11 months and 2 revisions later, EU Space Act still appears to be far from ready for government approval
May 26, 2026
Previous
Page373of3932
Next
Seis startups inician su andadura en el ESA BIC Andalucía
May 27, 2026
SITAEL presenta il piano industriale fino al 2031
May 27, 2026
SITAEL presenta il piano industriale fino al 2031
May 27, 2026