Browse the latest facts and intelligence extracted from space industry sources.
| Information | Article | Published |
|---|---|---|
Browse the latest facts and intelligence extracted from space industry sources.
total items
| Information | Article | Published |
|---|---|---|
Lisa Campbell urged the Canadian space sector to strive for initial operating capability and then iterate it. GeneralValue 1.5 | May 27, 2026 | |
David Musson said Lunar Medical develops multi-use technologies including digital health integration and AI for austere environments. Capability |
| May 27, 2026 |
The Canadian Space Agency is shifting toward agile procurement. LegalValue 1.2 | May 27, 2026 |
Lisa Campbell is the president of the Canadian Space Agency. GovernanceValue 4.0 | May 27, 2026 |
LandSpace's new factory in Wuxi, Jiangsu province has started production. GrowthValue 4.0 | May 27, 2026 |
A new ZQ-3 rocket is being assembled at LandSpace's Wuxi factory. CapabilityGrowthValue 3.9 | May 27, 2026 |
A ZQ-3 launch vehicle is being assembled at LandSpace's new factory in Wuxi, Jiangsu province. CapabilityGrowthValue 4.0 | May 27, 2026 |
NASA plans to send Artemis astronauts on increasingly complex missions to explore more of the Moon, enable scientific discoveries and economic benefits, establish a sustained human presence on the lunar surface, and lay the groundwork for the first crewed missions to Mars. PlanGrowthGeneralValue 3.5 | May 27, 2026 |
Artemis III follows the successful crewed Artemis II test flight in April. PlanValue 2.5 | May 27, 2026 |
Artemis III will launch four astronauts from NASA’s Kennedy Space Center in Florida aboard the Orion spacecraft on the Space Launch System rocket. PlanGeneralValue 4.0 | May 27, 2026 |
Artemis III will test rendezvous and docking capabilities between Orion and commercial lunar landers needed to place astronauts on the lunar surface. PlanCapabilityValue 4.3 | May 27, 2026 |
Lunar Outpost is the prime contractor for the Lunar Dawn consortium. RelationshipsValue 4.0 | May 27, 2026 |
Astrolab's FLIP rover is part of the Moon Base 2 payload and is the largest commercial payload delivered to the Moon to date. CapabilityGeneralValue 3.5 | May 27, 2026 |
NASA intends to scale lunar cargo delivery to 60 metric tons in Phase 2 and 150 metric tons in Phase 3. PlanGrowthValue 4.0 | May 27, 2026 |
Lunar Outpost's NASA contract covers its Pegasus rover, a pared-down version of its Eagle lunar terrain vehicle. RelationshipsValue 4.5 | May 27, 2026 |
NASA has two Broad Agency Announcements open that solicit industry ideas for lunar surface testing hardware. LegalGeneralValue 2.2 | May 27, 2026 |
NASA's Phase 1 Moon Base plan aims to deliver approximately 4 metric tons of cargo to the lunar surface. PlanCapabilityValue 4.0 | May 27, 2026 |
NASA will deliver the new lunar terrain vehicles to the lunar surface using Blue Origin's Mark 1 Endurance lander. RelationshipsPlanValue 4.0 | May 27, 2026 |
The Moon Base 1 mission includes the Stereo Cameras for Lunar Plume-Surface Studies and a Laser Retroreflective Array. CapabilityGeneralValue 4.0 | May 27, 2026 |
NASA will use an Astrobotic Griffin lander to carry more than 500 kilograms of cargo on the Moon Base 2 mission. PlanCapabilityGeneralValue 4.0 | May 27, 2026 |
NASA awarded two $220 million contracts for lunar terrain vehicles to Astrolab and Lunar Outpost. RelationshipsFinancialPlanValue 4.8 | May 27, 2026 |
NASA envisions the Moon Base spanning hundreds of square kilometres with distributed assets rather than a centralized habitat. PlanGeneralValue 3.0 | May 27, 2026 |
NASA expects habitats in the Moon Base to be placed on hilltops and nuclear power systems to be positioned a kilometre or more away for radiation protection. CapabilityPlanValue 3.6 | May 27, 2026 |
Firefly Aerospace was selected to build the Elytra orbital vehicle for the Moonfall drones. RelationshipsValue 4.0 | May 27, 2026 |
The Lunar Dawn consortium includes MDA Space, Leidos, General Motors, and Goodyear. RelationshipsValue 4.0 | May 27, 2026 |
NASA already has one Moon communications constellation contract in place and plans to solicit a second network for higher bandwidth needs. PlanRelationshipsValue 4.0 | May 27, 2026 |
NASA plans to begin hardware stacking for Artemis III in summer 2026 to support a mid-2027 target launch. PlanGrowthValue 4.6 | May 27, 2026 |
NASA's Moon Base 1 and Moon Base 2 procurement awards total $220 million each, and Blue Origin is being paid $234 million per mission to deliver those rovers. RelationshipsFinancialPlanValue 4.5 | May 27, 2026 |
NASA's Phase 1 Moon Base plan runs through 2029 and relies heavily on private partners to deliver hardware to the lunar south pole. PlanRelationshipsValue 4.0 | May 27, 2026 |
NASA executed the lunar terrain vehicle delivery procurement under the Commercial Lunar Payload Services 1.0 framework. RelationshipsPlanValue 4.0 | May 27, 2026 |
Astrolab's NASA contract covers its CLV-1 FlexRover architecture. RelationshipsGeneralValue 4.0 | May 27, 2026 |
Blue Origin's Mark 1 lander will deliver equipment to the Shackleton Connecting Ridge for the Moon Base 1 mission. PlanCapabilityValue 4.0 | May 27, 2026 |
NASA detailed a newly defined Moon Base program on May 26, 2026 to establish a sustained lunar presence through an iterative, commercial-heavy approach. PlanGrowthValue 3.5 | May 27, 2026 |
NASA's next-generation CLPS 2.0 cargo lander proposals are due June 30, 2026. PlanGeneralValue 3.5 | May 27, 2026 |
NASA's Moonfall program will use a network of 3 to 4 lunar drones to scout landing sites, map the surface at centimeter-scale resolution, and prospect for water ice. CapabilityPlanValue 4.6 | May 27, 2026 |
NASA's Moon Base 3 mission will carry additional payloads from the European Space Agency and the Korean Space Agency. RelationshipsPlanValue 3.8 | May 27, 2026 |
NASA plans a cadence of 25 launches and 21 landings between 2026 and 2029 for its Phase 1 lunar delivery campaign. PlanGrowthValue 4.2 | May 27, 2026 |
NASA will keep the new lunar terrain vehicles approximately two kilometres from crewed landing sites to protect them from landing ejecta. CapabilityValue 3.7 | May 27, 2026 |
NASA confirmed a $10 billion funding injection from the Working Family Tax Cut Act, with a large portion dedicated to exploration. FinancialLegalValue 4.0 | May 27, 2026 |
MDA Space is independently engaged with the Canadian Space Agency's sovereign Lunar Utility Vehicle program. RelationshipsValue 3.0 | May 27, 2026 |
NASA expects additional CLPS 1.0 mission awards in June 2026. PlanValue 2.8 | May 27, 2026 |
NASA's new lunar terrain vehicles are designed to travel up to 200 kilometres at speeds of 10 kilometres per hour. CapabilityValue 4.0 | May 27, 2026 |
NASA awarded Blue Origin a $188 million contract with a potential $280.4 million extension for two work orders to deliver lunar payloads to the lunar south pole region. RelationshipsFinancialPlanValue 5.0 | May 27, 2026 |
Astrolab’s Crewed Lunar Vehicle CLV-1 is derived from the company’s FLEX architecture and is designed to transport astronauts, supplies, and remote operations support. CapabilityGeneralValue 4.0 | May 27, 2026 |
Moon Base III will include payloads from the European Space Agency and the Korea Astronomy and Space Science Institute. GeneralValue 2.0 | May 27, 2026 |
Lunar Outpost’s Pegasus rover is a lighter evolution of the Eagle rover and can operate for up to one year at speeds above 14 km/h. CapabilityValue 4.0 | May 27, 2026 |
NASA selected Firefly Aerospace to build the spacecraft that will carry four drones from Earth orbit to the Moon for the MoonFall mission, which is planned for 2028. RelationshipsPlanGeneralValue 4.0 | May 27, 2026 |
NASA announced new contracts for crewed lunar rovers and uncrewed cargo landers for the Moon at its headquarters in Washington, D.C. RelationshipsPlanValue 3.8 | May 27, 2026 |
Base Lunare I will carry NASA payloads including Stereo Cameras for Lunar Plume-Surface Studies and the Laser Retroreflective Array. CapabilityValue 4.0 | May 27, 2026 |
Base Lunare II is scheduled to launch later in 2026 on Astrobotic’s Griffin lander with more than 500 kg of payload, including Astrolab’s FLIP rover. PlanCapabilityGeneralValue 4.5 | May 27, 2026 |
Lisa Campbell urged the Canadian space sector to strive for initial operating capability and then iterate it.
David Musson said Lunar Medical develops multi-use technologies including digital health integration and AI for austere environments.
The Canadian Space Agency is shifting toward agile procurement.
Lisa Campbell is the president of the Canadian Space Agency.
LandSpace's new factory in Wuxi, Jiangsu province has started production.
A new ZQ-3 rocket is being assembled at LandSpace's Wuxi factory.
A ZQ-3 launch vehicle is being assembled at LandSpace's new factory in Wuxi, Jiangsu province.
NASA plans to send Artemis astronauts on increasingly complex missions to explore more of the Moon, enable scientific discoveries and economic benefits, establish a sustained human presence on the lunar surface, and lay the groundwork for the first crewed missions to Mars.
Artemis III follows the successful crewed Artemis II test flight in April.
Artemis III will launch four astronauts from NASA’s Kennedy Space Center in Florida aboard the Orion spacecraft on the Space Launch System rocket.
Artemis III will test rendezvous and docking capabilities between Orion and commercial lunar landers needed to place astronauts on the lunar surface.
Lunar Outpost is the prime contractor for the Lunar Dawn consortium.
Astrolab's FLIP rover is part of the Moon Base 2 payload and is the largest commercial payload delivered to the Moon to date.
NASA intends to scale lunar cargo delivery to 60 metric tons in Phase 2 and 150 metric tons in Phase 3.
Lunar Outpost's NASA contract covers its Pegasus rover, a pared-down version of its Eagle lunar terrain vehicle.
NASA has two Broad Agency Announcements open that solicit industry ideas for lunar surface testing hardware.
NASA's Phase 1 Moon Base plan aims to deliver approximately 4 metric tons of cargo to the lunar surface.
NASA will deliver the new lunar terrain vehicles to the lunar surface using Blue Origin's Mark 1 Endurance lander.
The Moon Base 1 mission includes the Stereo Cameras for Lunar Plume-Surface Studies and a Laser Retroreflective Array.
NASA will use an Astrobotic Griffin lander to carry more than 500 kilograms of cargo on the Moon Base 2 mission.
NASA awarded two $220 million contracts for lunar terrain vehicles to Astrolab and Lunar Outpost.
NASA envisions the Moon Base spanning hundreds of square kilometres with distributed assets rather than a centralized habitat.
NASA expects habitats in the Moon Base to be placed on hilltops and nuclear power systems to be positioned a kilometre or more away for radiation protection.
Firefly Aerospace was selected to build the Elytra orbital vehicle for the Moonfall drones.
The Lunar Dawn consortium includes MDA Space, Leidos, General Motors, and Goodyear.
NASA already has one Moon communications constellation contract in place and plans to solicit a second network for higher bandwidth needs.
NASA plans to begin hardware stacking for Artemis III in summer 2026 to support a mid-2027 target launch.
NASA's Moon Base 1 and Moon Base 2 procurement awards total $220 million each, and Blue Origin is being paid $234 million per mission to deliver those rovers.
NASA's Phase 1 Moon Base plan runs through 2029 and relies heavily on private partners to deliver hardware to the lunar south pole.
NASA executed the lunar terrain vehicle delivery procurement under the Commercial Lunar Payload Services 1.0 framework.
Astrolab's NASA contract covers its CLV-1 FlexRover architecture.
Blue Origin's Mark 1 lander will deliver equipment to the Shackleton Connecting Ridge for the Moon Base 1 mission.
NASA detailed a newly defined Moon Base program on May 26, 2026 to establish a sustained lunar presence through an iterative, commercial-heavy approach.
NASA's next-generation CLPS 2.0 cargo lander proposals are due June 30, 2026.
NASA's Moonfall program will use a network of 3 to 4 lunar drones to scout landing sites, map the surface at centimeter-scale resolution, and prospect for water ice.
NASA's Moon Base 3 mission will carry additional payloads from the European Space Agency and the Korean Space Agency.
NASA plans a cadence of 25 launches and 21 landings between 2026 and 2029 for its Phase 1 lunar delivery campaign.
NASA will keep the new lunar terrain vehicles approximately two kilometres from crewed landing sites to protect them from landing ejecta.
NASA confirmed a $10 billion funding injection from the Working Family Tax Cut Act, with a large portion dedicated to exploration.
MDA Space is independently engaged with the Canadian Space Agency's sovereign Lunar Utility Vehicle program.
NASA expects additional CLPS 1.0 mission awards in June 2026.
NASA's new lunar terrain vehicles are designed to travel up to 200 kilometres at speeds of 10 kilometres per hour.
NASA awarded Blue Origin a $188 million contract with a potential $280.4 million extension for two work orders to deliver lunar payloads to the lunar south pole region.
Astrolab’s Crewed Lunar Vehicle CLV-1 is derived from the company’s FLEX architecture and is designed to transport astronauts, supplies, and remote operations support.
Moon Base III will include payloads from the European Space Agency and the Korea Astronomy and Space Science Institute.
Lunar Outpost’s Pegasus rover is a lighter evolution of the Eagle rover and can operate for up to one year at speeds above 14 km/h.
NASA selected Firefly Aerospace to build the spacecraft that will carry four drones from Earth orbit to the Moon for the MoonFall mission, which is planned for 2028.
NASA announced new contracts for crewed lunar rovers and uncrewed cargo landers for the Moon at its headquarters in Washington, D.C.
Base Lunare I will carry NASA payloads including Stereo Cameras for Lunar Plume-Surface Studies and the Laser Retroreflective Array.