Polaris Intelligence
Polaris
Intelligence
About
Ctrl K
Sign in
© Polaris Intelligence 2026
PrivacyTermsAdmin

Latest Information

Browse the latest facts and intelligence extracted from space industry sources.

InformationArticlePublished

Latest Information

Browse the latest facts and intelligence extracted from space industry sources.

196,556

total items

0.0-5.0
Results updated
InformationArticlePublished

Over the next 18 months, Astrolab and Lunar Outpost will finalize rover designs, conduct crewed evaluations, and qualify flight units for operational readiness.

PlanValue 4.0
Lunar Rover Contract Advances NASA’s Moon Base Vision for 2028
Jun 2, 2026

Moon Base I is targeted for launch no earlier than fall 2026 and will use Blue Origin’s Blue Moon Mark 1 Endurance lander to deliver NASA scientific instruments to the Shackleton Connecting Ridge.

Plan
Capability
Value 4.5
Lunar Rover Contract Advances NASA’s Moon Base Vision for 2028
Jun 2, 2026

NASA announced updates to MoonFall, a mission targeting 2028 that will send four drones to make short hops across the lunar surface to survey potential Artemis landing sites.

PlanCapabilityGeneralValue 4.5
Lunar Rover Contract Advances NASA’s Moon Base Vision for 2028
Jun 2, 2026

When stowed on a CLPS lander, Venturi Astrolab’s Crewed Lunar Vehicle-1 measures approximately 6.6 feet long, 7.5 feet wide, and 7.2 feet tall.

CapabilityValue 4.0
Lunar Rover Contract Advances NASA’s Moon Base Vision for 2028
Jun 2, 2026

NASA awarded Venturi Astrolab a $219 million task order to develop the Crewed Lunar Vehicle-1 under Phase 1 High Achievability Mission task orders of the Lunar Terrain Vehicle Services contract.

RelationshipsFinancialPlanValue 5.0
Lunar Rover Contract Advances NASA’s Moon Base Vision for 2028
Jun 2, 2026

Lunar Outpost’s Pegasus rover is a lighter, mission-ready evolution of its Eagle rover built to meet NASA’s updated Lunar Terrain Vehicle requirements.

CapabilityLegalValue 4.0
Lunar Rover Contract Advances NASA’s Moon Base Vision for 2028
Jun 2, 2026

Venturi Astrolab’s Crewed Lunar Vehicle-1 is designed to transport astronauts and supplies and can also conduct surface operations remotely.

CapabilityValue 4.0
Lunar Rover Contract Advances NASA’s Moon Base Vision for 2028
Jun 2, 2026

The Lunar Terrain Vehicle Services indefinite-delivery/indefinite-quantity contract issued by NASA in 2024 has a potential maximum value of up to $4.6 billion over 13 years.

RelationshipsFinancialValue 4.8
Lunar Rover Contract Advances NASA’s Moon Base Vision for 2028
Jun 2, 2026

Venturi Astrolab’s Crewed Lunar Vehicle-1 weighs a maximum of about 2,094 pounds and can reach speeds of more than 6 mph on level ground.

CapabilityValue 4.0
Lunar Rover Contract Advances NASA’s Moon Base Vision for 2028
Jun 2, 2026

Moon Base III includes a Lunar Vertex investigation studying lunar swirls, with payloads from ESA and the Korea Astronomy and Space Science Institute.

RelationshipsValue 3.6
Lunar Rover Contract Advances NASA’s Moon Base Vision for 2028
Jun 2, 2026

NASA anticipates that the first lunar terrain vehicles will reach the Moon by 2028.

PlanValue 4.0
Lunar Rover Contract Advances NASA’s Moon Base Vision for 2028
Jun 2, 2026

The Space Development Agency announced a strategic pause for launching missions in March while it worked out technical issues.

PlanValue 3.5
NDAA Would Cut SDA, RCO Offices
Jun 2, 2026

The Space Rapid Capabilities Office is a roughly 200-person office tasked with getting space systems into troops’ hands quickly.

GeneralValue 2.0
NDAA Would Cut SDA, RCO Offices
Jun 2, 2026

The Space Development Agency was established in 2019 as an independent agency.

GeneralValue 1.8
NDAA Would Cut SDA, RCO Offices
Jun 2, 2026

The House bill would transfer the Space Development Agency director’s authorities to the Space Force portfolio acquisition executive in charge of missile warning and tracking.

LegalGovernanceValue 4.0
NDAA Would Cut SDA, RCO Offices
Jun 2, 2026

The Space Rapid Capabilities Office was established by the FY18 National Defense Authorization Act.

LegalGeneralValue 3.0
NDAA Would Cut SDA, RCO Offices
Jun 2, 2026

The Space Development Agency launched Tranche 1 of the Proliferated Warfighter Space Architecture transport layer in October.

PlanValue 4.0
NDAA Would Cut SDA, RCO Offices
Jun 2, 2026

The Space Development Agency has been working to field commercially built satellites in tranches to boost military communications, tracking, and missile-defense capabilities.

PlanCapabilityValue 3.0
NDAA Would Cut SDA, RCO Offices
Jun 2, 2026

The House FY27 National Defense Authorization Act would eliminate the Space Development Agency and the Space Rapid Capabilities Office.

LegalGovernanceValue 4.0
NDAA Would Cut SDA, RCO Offices
Jun 2, 2026

Northrop Grumman is partnering with Apex to develop space-based interceptor satellites for the U.S. Golden Dome missile-defense shield.

RelationshipsValue 4.5
Northrop Grumman Taps Apex for Golden Dome SBI Collab
Jun 2, 2026

Project Shadow is scheduled to launch net this month to validate space-based interceptor capabilities in low Earth orbit.

PlanCapabilityValue 4.0
Northrop Grumman Taps Apex for Golden Dome SBI Collab
Jun 2, 2026

Apex’s Nova satellite-bus platform will be fitted with an orbital magazine carrying two scaled-down demo interceptors for Project Shadow.

CapabilityValue 4.0
Northrop Grumman Taps Apex for Golden Dome SBI Collab
Jun 2, 2026

Project Shadow is designed to demonstrate Link-182-capable inter-satellite links, infrared missile-warning-and-tracking payloads, and solid-rocket motor interceptors.

CapabilityPlanValue 4.0
Northrop Grumman Taps Apex for Golden Dome SBI Collab
Jun 2, 2026

Raytheon partnered with Rocket Lab in May to support Golden Dome-related work.

RelationshipsValue 4.0
Northrop Grumman Taps Apex for Golden Dome SBI Collab
Jun 2, 2026

Northrop Grumman is one of 12 companies selected to build the space-based interceptor component of Golden Dome.

RelationshipsGeneralValue 4.0
Northrop Grumman Taps Apex for Golden Dome SBI Collab
Jun 2, 2026

Apex is moving ahead with Project Shadow in parallel with its work with Northrop Grumman.

PlanRelationshipsValue 2.0
Northrop Grumman Taps Apex for Golden Dome SBI Collab
Jun 2, 2026

The U.S. Department of Defense estimates that Golden Dome will cost $185 billion.

FinancialValue 4.0
Northrop Grumman Taps Apex for Golden Dome SBI Collab
Jun 2, 2026

Apex CEO Ian Cinnamon said the Northrop Grumman partnership will enable operational, constellation-scale space-based missile defense.

RelationshipsCapabilityValue 4.0
Northrop Grumman Taps Apex for Golden Dome SBI Collab
Jun 2, 2026

Apex announced a $15 million self-funded demonstration mission called Project Shadow in October.

PlanFinancialGeneralValue 4.0
Northrop Grumman Taps Apex for Golden Dome SBI Collab
Jun 2, 2026

Northrop Grumman has demonstrated key capabilities through ground tests this year and is on track to deliver on-orbit missile-defense capabilities with Apex in 2027.

PlanCapabilityValue 4.0
Northrop Grumman Taps Apex for Golden Dome SBI Collab
Jun 2, 2026

Golden Dome could consist of at least 7,000 satellites at full capacity.

CapabilityGrowthValue 2.0
Northrop Grumman Taps Apex for Golden Dome SBI Collab
Jun 2, 2026

Anduril partnered with Impulse Space, Inversion Space, K2 Space, Sandia National Laboratories, and Voyager Technologies in May to support Golden Dome-related work.

RelationshipsValue 4.0
Northrop Grumman Taps Apex for Golden Dome SBI Collab
Jun 2, 2026

Apex was founded to support proliferated constellations like Golden Dome.

CapabilityGrowthValue 2.0
Northrop Grumman Taps Apex for Golden Dome SBI Collab
Jun 2, 2026

ParaZero Technologies' DefendAir system provides a kinetic, non-explosive layer of defense against hostile unmanned aerial systems.

CapabilityValue 4.0
ParaZero Secures First DefendAir Order from U.S. Tier-1 Defense Corporation
Jun 2, 2026

ParaZero Technologies integrates DefendAir Net Pods into autonomous, unmanned, and other defense platforms for physical drone interception in complex operational environments.

RelationshipsCapabilityValue 4.0
ParaZero Secures First DefendAir Order from U.S. Tier-1 Defense Corporation
Jun 2, 2026

The DefendAir product family includes autonomous vehicle-mounted configurations, airborne configurations, and man-operated portable applications for personal protection.

CapabilityValue 2.0
ParaZero Secures First DefendAir Order from U.S. Tier-1 Defense Corporation
Jun 2, 2026

ParaZero Technologies received its initial order from a major United States-based Tier-1 defense corporation for DefendAir Net Pods.

RelationshipsValue 4.0
ParaZero Secures First DefendAir Order from U.S. Tier-1 Defense Corporation
Jun 2, 2026

ParaZero Technologies' patented technology physically captures hostile attack drones without using conventional explosive countermeasures.

CapabilityValue 4.0
ParaZero Secures First DefendAir Order from U.S. Tier-1 Defense Corporation
Jun 2, 2026

Blue Origin plans to fly again before the end of 2026.

PlanGeneralValue 3.0
Rather then rebuilding LC-36 as it was, Blue Origin is planning to rebuild it to a version with vertical operations (like Starship & Atlas V) that they were already working on and does not need a Transporter-Erector. They're planning to fly again before the end of the year.
Jun 2, 2026

The oxygen, liquid hydrogen, and LNG tanks at LC-36 are in good shape.

CapabilityValue 3.0
Rather then rebuilding LC-36 as it was, Blue Origin is planning to rebuild it to a version with vertical operations (like Starship & Atlas V) that they were already working on and does not need a Transporter-Erector. They're planning to fly again before the end of the year.
Jun 2, 2026

Blue Origin will continue 7x2 rate manufacturing at pace as planned and store the stages for later use.

GrowthPlanCapabilityValue 4.0
Rather then rebuilding LC-36 as it was, Blue Origin is planning to rebuild it to a version with vertical operations (like Starship & Atlas V) that they were already working on and does not need a Transporter-Erector. They're planning to fly again before the end of the year.
Jun 2, 2026

Blue Origin’s booster Never Tell Me The Odds and three GS-2 vehicles in the integration facility appear to be in good condition.

CapabilityValue 2.8
Rather then rebuilding LC-36 as it was, Blue Origin is planning to rebuild it to a version with vertical operations (like Starship & Atlas V) that they were already working on and does not need a Transporter-Erector. They're planning to fly again before the end of the year.
Jun 2, 2026

Blue Origin will not move directly to a 9x4 configuration.

PlanCapabilityValue 3.0
Rather then rebuilding LC-36 as it was, Blue Origin is planning to rebuild it to a version with vertical operations (like Starship & Atlas V) that they were already working on and does not need a Transporter-Erector. They're planning to fly again before the end of the year.
Jun 2, 2026

The big support tower at LC-36 is damaged but can be repaired in place.

CapabilityValue 2.8
Rather then rebuilding LC-36 as it was, Blue Origin is planning to rebuild it to a version with vertical operations (like Starship & Atlas V) that they were already working on and does not need a Transporter-Erector. They're planning to fly again before the end of the year.
Jun 2, 2026

Blue Origin is planning to rebuild LC-36 to a vertical-operations configuration that does not require a transporter-erector.

PlanCapabilityValue 4.0
Rather then rebuilding LC-36 as it was, Blue Origin is planning to rebuild it to a version with vertical operations (like Starship & Atlas V) that they were already working on and does not need a Transporter-Erector. They're planning to fly again before the end of the year.
Jun 2, 2026

Blue Origin is pursuing an alternative vertical operations concept instead of building a new transporter-erector.

PlanValue 3.0
Rather then rebuilding LC-36 as it was, Blue Origin is planning to rebuild it to a version with vertical operations (like Starship & Atlas V) that they were already working on and does not need a Transporter-Erector. They're planning to fly again before the end of the year.
Jun 2, 2026

Roscosmos delivered a Soyuz-2.1b rocket to Baikonur for the launch of Progress MS-36, scheduled for November.

PlanRelationshipsValue 4.0
Roscosmos reports delivery of a Soyuz-2.1b rocket to Baikonur for the launch of Progress MS-36 spacecraft (scheduled for November) Normally, Progress spacecrafts are being launched on less capable Soyuz-2.1a rocket.
Jun 2, 2026

The Jiuquan entities aim to encourage commercial space enterprises to operate at the Jiuquan Satellite Launch Center.

GeneralValue 1.2
Spark Space Raises Nearly 100 Million Yuan, Courts Jiuquan for Launch
Jun 2, 2026

The Lieyan-2 engine burns rocket-grade kerosene and liquid oxygen to generate 10 tons of thrust.

CapabilityValue 4.0
Spark Space Raises Nearly 100 Million Yuan, Courts Jiuquan for Launch
Jun 2, 2026

Jinhua-1’s second stage will be powered by a single vacuum-optimized Lieyan-2 engine.

CapabilityValue 4.0
Spark Space Raises Nearly 100 Million Yuan, Courts Jiuquan for Launch
Jun 2, 2026

Over the next 18 months, Astrolab and Lunar Outpost will finalize rover designs, conduct crewed evaluations, and qualify flight units for operational readiness.

PlanValue 4.0
Lunar Rover Contract Advances NASA’s Moon Base Vision for 2028
Jun 2, 2026

Moon Base I is targeted for launch no earlier than fall 2026 and will use Blue Origin’s Blue Moon Mark 1 Endurance lander to deliver NASA scientific instruments to the Shackleton Connecting Ridge.

PlanCapabilityValue 4.5
Lunar Rover Contract Advances NASA’s Moon Base Vision for 2028
Jun 2, 2026

NASA announced updates to MoonFall, a mission targeting 2028 that will send four drones to make short hops across the lunar surface to survey potential Artemis landing sites.

PlanCapabilityGeneralValue 4.5

When stowed on a CLPS lander, Venturi Astrolab’s Crewed Lunar Vehicle-1 measures approximately 6.6 feet long, 7.5 feet wide, and 7.2 feet tall.

CapabilityValue 4.0
Lunar Rover Contract Advances NASA’s Moon Base Vision for 2028
Jun 2, 2026

NASA awarded Venturi Astrolab a $219 million task order to develop the Crewed Lunar Vehicle-1 under Phase 1 High Achievability Mission task orders of the Lunar Terrain Vehicle Services contract.

RelationshipsFinancialPlanValue 5.0

Lunar Outpost’s Pegasus rover is a lighter, mission-ready evolution of its Eagle rover built to meet NASA’s updated Lunar Terrain Vehicle requirements.

CapabilityLegalValue 4.0
Lunar Rover Contract Advances NASA’s Moon Base Vision for 2028
Jun 2, 2026

Venturi Astrolab’s Crewed Lunar Vehicle-1 is designed to transport astronauts and supplies and can also conduct surface operations remotely.

CapabilityValue 4.0
Lunar Rover Contract Advances NASA’s Moon Base Vision for 2028
Jun 2, 2026

The Lunar Terrain Vehicle Services indefinite-delivery/indefinite-quantity contract issued by NASA in 2024 has a potential maximum value of up to $4.6 billion over 13 years.

RelationshipsFinancialValue 4.8
Lunar Rover Contract Advances NASA’s Moon Base Vision for 2028
Jun 2, 2026

Venturi Astrolab’s Crewed Lunar Vehicle-1 weighs a maximum of about 2,094 pounds and can reach speeds of more than 6 mph on level ground.

CapabilityValue 4.0
Lunar Rover Contract Advances NASA’s Moon Base Vision for 2028
Jun 2, 2026

Moon Base III includes a Lunar Vertex investigation studying lunar swirls, with payloads from ESA and the Korea Astronomy and Space Science Institute.

RelationshipsValue 3.6
Lunar Rover Contract Advances NASA’s Moon Base Vision for 2028
Jun 2, 2026

NASA anticipates that the first lunar terrain vehicles will reach the Moon by 2028.

PlanValue 4.0
Lunar Rover Contract Advances NASA’s Moon Base Vision for 2028
Jun 2, 2026

The Space Development Agency announced a strategic pause for launching missions in March while it worked out technical issues.

PlanValue 3.5
NDAA Would Cut SDA, RCO Offices
Jun 2, 2026

The Space Rapid Capabilities Office is a roughly 200-person office tasked with getting space systems into troops’ hands quickly.

GeneralValue 2.0
NDAA Would Cut SDA, RCO Offices
Jun 2, 2026

The Space Development Agency was established in 2019 as an independent agency.

GeneralValue 1.8
NDAA Would Cut SDA, RCO Offices
Jun 2, 2026

The House bill would transfer the Space Development Agency director’s authorities to the Space Force portfolio acquisition executive in charge of missile warning and tracking.

LegalGovernanceValue 4.0
NDAA Would Cut SDA, RCO Offices
Jun 2, 2026

The Space Rapid Capabilities Office was established by the FY18 National Defense Authorization Act.

LegalGeneralValue 3.0
NDAA Would Cut SDA, RCO Offices
Jun 2, 2026

The Space Development Agency launched Tranche 1 of the Proliferated Warfighter Space Architecture transport layer in October.

PlanValue 4.0
NDAA Would Cut SDA, RCO Offices
Jun 2, 2026

The Space Development Agency has been working to field commercially built satellites in tranches to boost military communications, tracking, and missile-defense capabilities.

PlanCapabilityValue 3.0
NDAA Would Cut SDA, RCO Offices
Jun 2, 2026

The House FY27 National Defense Authorization Act would eliminate the Space Development Agency and the Space Rapid Capabilities Office.

LegalGovernanceValue 4.0
NDAA Would Cut SDA, RCO Offices
Jun 2, 2026

Northrop Grumman is partnering with Apex to develop space-based interceptor satellites for the U.S. Golden Dome missile-defense shield.

RelationshipsValue 4.5
Northrop Grumman Taps Apex for Golden Dome SBI Collab
Jun 2, 2026

Project Shadow is scheduled to launch net this month to validate space-based interceptor capabilities in low Earth orbit.

PlanCapabilityValue 4.0
Northrop Grumman Taps Apex for Golden Dome SBI Collab
Jun 2, 2026

Apex’s Nova satellite-bus platform will be fitted with an orbital magazine carrying two scaled-down demo interceptors for Project Shadow.

CapabilityValue 4.0
Northrop Grumman Taps Apex for Golden Dome SBI Collab
Jun 2, 2026

Project Shadow is designed to demonstrate Link-182-capable inter-satellite links, infrared missile-warning-and-tracking payloads, and solid-rocket motor interceptors.

CapabilityPlanValue 4.0
Northrop Grumman Taps Apex for Golden Dome SBI Collab
Jun 2, 2026

Raytheon partnered with Rocket Lab in May to support Golden Dome-related work.

RelationshipsValue 4.0
Northrop Grumman Taps Apex for Golden Dome SBI Collab
Jun 2, 2026

Northrop Grumman is one of 12 companies selected to build the space-based interceptor component of Golden Dome.

RelationshipsGeneralValue 4.0
Northrop Grumman Taps Apex for Golden Dome SBI Collab
Jun 2, 2026

Apex is moving ahead with Project Shadow in parallel with its work with Northrop Grumman.

PlanRelationshipsValue 2.0
Northrop Grumman Taps Apex for Golden Dome SBI Collab
Jun 2, 2026

The U.S. Department of Defense estimates that Golden Dome will cost $185 billion.

FinancialValue 4.0
Northrop Grumman Taps Apex for Golden Dome SBI Collab
Jun 2, 2026

Apex CEO Ian Cinnamon said the Northrop Grumman partnership will enable operational, constellation-scale space-based missile defense.

RelationshipsCapabilityValue 4.0
Northrop Grumman Taps Apex for Golden Dome SBI Collab
Jun 2, 2026

Apex announced a $15 million self-funded demonstration mission called Project Shadow in October.

PlanFinancialGeneralValue 4.0

Northrop Grumman has demonstrated key capabilities through ground tests this year and is on track to deliver on-orbit missile-defense capabilities with Apex in 2027.

PlanCapabilityValue 4.0
Northrop Grumman Taps Apex for Golden Dome SBI Collab
Jun 2, 2026

Golden Dome could consist of at least 7,000 satellites at full capacity.

CapabilityGrowthValue 2.0
Northrop Grumman Taps Apex for Golden Dome SBI Collab
Jun 2, 2026

Anduril partnered with Impulse Space, Inversion Space, K2 Space, Sandia National Laboratories, and Voyager Technologies in May to support Golden Dome-related work.

RelationshipsValue 4.0
Northrop Grumman Taps Apex for Golden Dome SBI Collab
Jun 2, 2026

Apex was founded to support proliferated constellations like Golden Dome.

CapabilityGrowthValue 2.0
Northrop Grumman Taps Apex for Golden Dome SBI Collab
Jun 2, 2026

ParaZero Technologies' DefendAir system provides a kinetic, non-explosive layer of defense against hostile unmanned aerial systems.

CapabilityValue 4.0
ParaZero Secures First DefendAir Order from U.S. Tier-1 Defense Corporation
Jun 2, 2026

ParaZero Technologies integrates DefendAir Net Pods into autonomous, unmanned, and other defense platforms for physical drone interception in complex operational environments.

RelationshipsCapabilityValue 4.0
ParaZero Secures First DefendAir Order from U.S. Tier-1 Defense Corporation
Jun 2, 2026

The DefendAir product family includes autonomous vehicle-mounted configurations, airborne configurations, and man-operated portable applications for personal protection.

CapabilityValue 2.0
ParaZero Secures First DefendAir Order from U.S. Tier-1 Defense Corporation
Jun 2, 2026

ParaZero Technologies received its initial order from a major United States-based Tier-1 defense corporation for DefendAir Net Pods.

RelationshipsValue 4.0
ParaZero Secures First DefendAir Order from U.S. Tier-1 Defense Corporation
Jun 2, 2026

ParaZero Technologies' patented technology physically captures hostile attack drones without using conventional explosive countermeasures.

CapabilityValue 4.0
ParaZero Secures First DefendAir Order from U.S. Tier-1 Defense Corporation
Jun 2, 2026

Blue Origin plans to fly again before the end of 2026.

PlanGeneralValue 3.0
Rather then rebuilding LC-36 as it was, Blue Origin is planning to rebuild it to a version with vertical operations (like Starship & Atlas V) that they were already working on and does not need a Transporter-Erector. They're planning to fly again before the end of the year.
Jun 2, 2026

The oxygen, liquid hydrogen, and LNG tanks at LC-36 are in good shape.

CapabilityValue 3.0
Rather then rebuilding LC-36 as it was, Blue Origin is planning to rebuild it to a version with vertical operations (like Starship & Atlas V) that they were already working on and does not need a Transporter-Erector. They're planning to fly again before the end of the year.
Jun 2, 2026

Blue Origin will continue 7x2 rate manufacturing at pace as planned and store the stages for later use.

GrowthPlanCapabilityValue 4.0

Blue Origin’s booster Never Tell Me The Odds and three GS-2 vehicles in the integration facility appear to be in good condition.

CapabilityValue 2.8
Rather then rebuilding LC-36 as it was, Blue Origin is planning to rebuild it to a version with vertical operations (like Starship & Atlas V) that they were already working on and does not need a Transporter-Erector. They're planning to fly again before the end of the year.
Jun 2, 2026

Blue Origin will not move directly to a 9x4 configuration.

PlanCapabilityValue 3.0
Rather then rebuilding LC-36 as it was, Blue Origin is planning to rebuild it to a version with vertical operations (like Starship & Atlas V) that they were already working on and does not need a Transporter-Erector. They're planning to fly again before the end of the year.
Jun 2, 2026

The big support tower at LC-36 is damaged but can be repaired in place.

CapabilityValue 2.8
Rather then rebuilding LC-36 as it was, Blue Origin is planning to rebuild it to a version with vertical operations (like Starship & Atlas V) that they were already working on and does not need a Transporter-Erector. They're planning to fly again before the end of the year.
Jun 2, 2026

Blue Origin is planning to rebuild LC-36 to a vertical-operations configuration that does not require a transporter-erector.

PlanCapabilityValue 4.0
Rather then rebuilding LC-36 as it was, Blue Origin is planning to rebuild it to a version with vertical operations (like Starship & Atlas V) that they were already working on and does not need a Transporter-Erector. They're planning to fly again before the end of the year.
Jun 2, 2026

Blue Origin is pursuing an alternative vertical operations concept instead of building a new transporter-erector.

PlanValue 3.0
Rather then rebuilding LC-36 as it was, Blue Origin is planning to rebuild it to a version with vertical operations (like Starship & Atlas V) that they were already working on and does not need a Transporter-Erector. They're planning to fly again before the end of the year.
Jun 2, 2026

Roscosmos delivered a Soyuz-2.1b rocket to Baikonur for the launch of Progress MS-36, scheduled for November.

PlanRelationshipsValue 4.0
Roscosmos reports delivery of a Soyuz-2.1b rocket to Baikonur for the launch of Progress MS-36 spacecraft (scheduled for November) Normally, Progress spacecrafts are being launched on less capable Soyuz-2.1a rocket.
Jun 2, 2026

The Jiuquan entities aim to encourage commercial space enterprises to operate at the Jiuquan Satellite Launch Center.

GeneralValue 1.2
Spark Space Raises Nearly 100 Million Yuan, Courts Jiuquan for Launch
Jun 2, 2026

The Lieyan-2 engine burns rocket-grade kerosene and liquid oxygen to generate 10 tons of thrust.

CapabilityValue 4.0
Spark Space Raises Nearly 100 Million Yuan, Courts Jiuquan for Launch
Jun 2, 2026

Jinhua-1’s second stage will be powered by a single vacuum-optimized Lieyan-2 engine.

CapabilityValue 4.0
Spark Space Raises Nearly 100 Million Yuan, Courts Jiuquan for Launch
Jun 2, 2026
Previous
Page341of3932
Next
Lunar Rover Contract Advances NASA’s Moon Base Vision for 2028
Jun 2, 2026
Lunar Rover Contract Advances NASA’s Moon Base Vision for 2028
Jun 2, 2026
Northrop Grumman Taps Apex for Golden Dome SBI Collab
Jun 2, 2026
Rather then rebuilding LC-36 as it was, Blue Origin is planning to rebuild it to a version with vertical operations (like Starship & Atlas V) that they were already working on and does not need a Transporter-Erector. They're planning to fly again before the end of the year.
Jun 2, 2026