Polaris Intelligence
Polaris
Intelligence
About
Ctrl K
Sign in
© Polaris Intelligence 2026
PrivacyTermsAdmin

Latest Information

Browse the latest facts and intelligence extracted from space industry sources.

InformationArticlePublished

Latest Information

Browse the latest facts and intelligence extracted from space industry sources.

198,883

total items

0.0-5.0
Results updated
InformationArticlePublished

Apex Space announced a $200 million Series C in April 2025.

FinancialGrowthRelationshipsValue 4.0
Apex Raises $200M At $2.3B Valuation
Jun 5, 2026

Apex Space hired Michael Kopet as chief financial officer.

GovernanceValue 3.5
Apex Raises $200M At $2.3B Valuation
Jun 5, 2026

Apex Space is pursuing Project Shadow separately in parallel with its Golden Dome work.

PlanValue 2.0
Apex Raises $200M At $2.3B Valuation
Jun 5, 2026

Michael Kopet was previously vice president of finance at Axon.

GovernanceValue 2.2
Apex Raises $200M At $2.3B Valuation
Jun 5, 2026

Apex Space plans to reach 100% vertical integration as it scales up and needs higher-volume parts.

GrowthCapabilityValue 3.2
Apex Raises $200M At $2.3B Valuation
Jun 5, 2026

The CZ-8A will replace the CZ-8 in the future.

PlanValue 2.5
By the way the CZ-8 (regular) has stopped of production. The 8A will replace the 8 in the future.
Jun 5, 2026

Production of the CZ-8 has stopped.

PlanGeneralValue 1.8
By the way the CZ-8 (regular) has stopped of production. The 8A will replace the 8 in the future.
Jun 5, 2026

The flatsat platform is intended to support the design, testing, and validation of secure satellite software and hardware architectures and cyber defense mechanisms.

CapabilityValue 3.6
DND launches Flatsat Prototype Challenge for space cybersecurity
Jun 5, 2026

The challenge focuses on a ground-based satellite platform that integrates critical satellite subsystems for controlled cybersecurity experimentation.

CapabilityGeneralValue 2.0
DND launches Flatsat Prototype Challenge for space cybersecurity
Jun 5, 2026

A majority of each applicant's full-time workforce and senior executives must reside in Canada.

LegalValue 3.5
DND launches Flatsat Prototype Challenge for space cybersecurity
Jun 5, 2026

Each selected project can receive up to $2 million for a maximum duration of 20 months.

FinancialPlanValue 4.0
DND launches Flatsat Prototype Challenge for space cybersecurity
Jun 5, 2026

Eligible applicants must be for-profit entities incorporated in Canada with 499 or fewer full-time equivalent employees.

LegalValue 2.0
DND launches Flatsat Prototype Challenge for space cybersecurity
Jun 5, 2026

Half or more of each applicant's wages must go to employees working in Canada.

LegalValue 2.2
DND launches Flatsat Prototype Challenge for space cybersecurity
Jun 5, 2026

Applicants must conduct their research and development activities in Canada.

LegalGeneralValue 2.0
DND launches Flatsat Prototype Challenge for space cybersecurity
Jun 5, 2026

The government expects to award two contracts under the challenge.

PlanValue 1.5
DND launches Flatsat Prototype Challenge for space cybersecurity
Jun 5, 2026

The Department of National Defence and Innovative Solutions Canada have opened a funding challenge to develop a laboratory-based flatsat platform for cybersecurity experimentation.

LegalCapabilityGeneralValue 3.2
DND launches Flatsat Prototype Challenge for space cybersecurity
Jun 5, 2026

Roscosmos will conduct a more extensive repair operation on the Zvezda transfer tunnel on Friday, June 5, 2026.

PlanGeneralValue 3.0
Image
Jun 5, 2026

One of the Zvezda transfer chamber leak sites was sealed with the two-component sealant Germetel-1.

CapabilityGeneralValue 3.0
Image
Jun 5, 2026

Roscosmos manages the Zvezda transfer tunnel crack issue through operational mitigation measures and periodic partial repairs.

CapabilityGeneralValue 3.0
Image
Jun 5, 2026

The Zvezda service module transfer tunnel, known as PrK, has had cracks and leaks for some time.

CapabilityGeneralValue 2.0
Image
Jun 5, 2026

NASA and Roscosmos have been working to determine the root cause of the cracks in the Zvezda service module transfer tunnel.

CapabilityValue 3.5
Image
Jun 5, 2026

The second Zvezda transfer chamber leak site is located on the conical portion of the transfer chamber and is being prepared for sealing.

CapabilityValue 3.8
Image
Jun 5, 2026

NASA directed all four SpaceX Crew-12 members and NASA astronaut Chris Williams to assume an elevated safety posture in the Dragon spacecraft during the repair.

CapabilityGeneralValue 2.8
Image
Jun 5, 2026

The Zvezda transfer chamber leaks pose no threat to the safety of the crew or the International Space Station's onboard systems.

GeneralValue 2.0
Image
Jun 5, 2026

Specialists found two air leaks in the Zvezda module of the Russian segment of the International Space Station during pressurization of the module's transfer chamber.

CapabilityValue 2.5
Image
Jun 5, 2026

Axiom Space’s new financing round exceeded its previously announced US$350 million target by US$175 million.

FinancialGrowthValue 4.7
Investor demand drives Axiom Space to close $525 million financing round
Jun 5, 2026

Axiom Space closed an oversubscribed financing round totaling more than US$525 million.

FinancialGrowthValue 4.5
Investor demand drives Axiom Space to close $525 million financing round
Jun 5, 2026

Takumi Hashizume is Managing Director and Head of the Space Innovation Office at MUFG Bank, Ltd.

GovernanceValue 3.6
Investor demand drives Axiom Space to close $525 million financing round
Jun 5, 2026

Axiom Space is working to meet milestones for its planned commercial space station and ongoing NASA contract requirements.

PlanGeneralValue 2.0
Investor demand drives Axiom Space to close $525 million financing round
Jun 5, 2026

MUFG Bank joined Axiom Space’s cap table in the new financing round.

RelationshipsFinancialValue 4.0
Investor demand drives Axiom Space to close $525 million financing round
Jun 5, 2026

Axiom Space will use the new capital for development of Axiom Station, production of the Axiom Extravehicular Mobility Unit spacesuit, and more commercial human spaceflight missions.

PlanGrowthCapabilityValue 4.0
Investor demand drives Axiom Space to close $525 million financing round
Jun 5, 2026

Andrew Newman is affiliated with Carnegie Science in Pasadena, California.

GovernanceGeneralValue 1.2
Jwst misura la massa di un buco nero nell’universo lontano
Jun 5, 2026

LandSpace’s image shows the ZQ-2E and ZQ-3 launch vehicles standing vertically at launch pads.

CapabilityGeneralValue 3.0
Land Space's post shows ZQ2E and ZQ3 vertical at the pads. Hints the coming two launches.
Jun 5, 2026

LandSpace has two upcoming launches involving ZQ-2E and ZQ-3.

PlanValue 4.0
Land Space's post shows ZQ2E and ZQ3 vertical at the pads. Hints the coming two launches.
Jun 5, 2026

Long March 8 Y9 launched SpaceSail Group-12 from Hainan at 06:34 UTC on June 5, 2026.

PlanValue 4.0
🚀 Long March 8 Y9 🕡 06:34UTC June 5 📍 Hainan 🛰️ SpaceSail Group-12
Jun 5, 2026

Long March 6A Y25 launched SpaceSail Group-11 from Taiyuan at 11:39 UTC on June 4, 2026.

PlanCapabilityValue 4.0
🚀 Long March 8 Y9 🕡 06:34UTC June 5 📍 Hainan 🛰️ SpaceSail Group-12
Jun 5, 2026

On June 5, NASA ordered five astronauts on the International Space Station to shelter in the Dragon spacecraft and prepare for a possible emergency evacuation because of an air leak in the Russian segment of the station.

GeneralPlanValue 4.0
Los astronautas de la NASA se refugian en la nave Dragon dos horas tras una fuga de aire en la ISS
Jun 5, 2026

The air leak affected the Zvezda service module of the International Space Station.

GeneralValue 3.5
Los astronautas de la NASA se refugian en la nave Dragon dos horas tras una fuga de aire en la ISS
Jun 5, 2026

Jessica Meir, Jack Hathaway, Sophie Adenot, and Andrey Fedyaev are members of SpaceX Crew-12.

GovernanceValue 4.0
Los astronautas de la NASA se refugian en la nave Dragon dos horas tras una fuga de aire en la ISS
Jun 5, 2026

Roscosmos decided to carry out a more extensive repair in the area of the cracks in the International Space Station's Russian segment.

PlanCapabilityValue 2.8
Los astronautas de la NASA se refugian en la nave Dragon dos horas tras una fuga de aire en la ISS
Jun 5, 2026

NASA later instructed the crew inside Dragon to end the safe-haven procedures and return to normal operations aboard the International Space Station.

PlanGeneralValue 3.0
Los astronautas de la NASA se refugian en la nave Dragon dos horas tras una fuga de aire en la ISS
Jun 5, 2026

Roscosmos has mitigated the Zvezda service module transfer tunnel cracks and leaks through operational measures and periodic partial repairs.

CapabilityValue 3.0
NASA issues order to space station astronauts to “shelter” for possible evacuation but rescinds it (updated)
Jun 5, 2026

NASA later instructed the crew members inside the Dragon spacecraft to end the safe haven procedures and return to planned operations aboard the International Space Station.

PlanGeneralValue 3.0
NASA issues order to space station astronauts to “shelter” for possible evacuation but rescinds it (updated)
Jun 5, 2026

NASA directed all four SpaceX Crew-12 members and NASA astronaut Chris Williams to move into the Dragon spacecraft under the ISS Safe Haven contingency plan.

PlanValue 4.6
NASA issues order to space station astronauts to “shelter” for possible evacuation but rescinds it (updated)
Jun 5, 2026

The Zvezda service module transfer tunnel on the International Space Station, known as PrK, has had cracks and leaks for some time.

CapabilityValue 3.0
NASA issues order to space station astronauts to “shelter” for possible evacuation but rescinds it (updated)
Jun 5, 2026

Roscosmos planned a more extensive repair operation on the Zvezda service module transfer tunnel for Friday, June 5.

PlanCapabilityValue 3.7
NASA issues order to space station astronauts to “shelter” for possible evacuation but rescinds it (updated)
Jun 5, 2026

Roscosmos paused the Friday structural repair efforts inside the Zvezda service module transfer tunnel while it assessed more measurements and data.

PlanCapabilityValue 3.0
NASA issues order to space station astronauts to “shelter” for possible evacuation but rescinds it (updated)
Jun 5, 2026

The Zvezda service module transfer tunnel on the International Space Station has had cracks and leaks for some time.

CapabilityValue 2.2
NASA issues order to space station astronauts to “shelter” for possible evacuation but rescinds it (updated)
Jun 5, 2026

Roscosmos planned a more extensive repair operation inside the Zvezda service module transfer tunnel on Friday, June 5.

PlanValue 3.5
NASA issues order to space station astronauts to “shelter” for possible evacuation but rescinds it (updated)
Jun 5, 2026

Roscosmos later paused the structural repair efforts inside the Zvezda service module transfer tunnel, and NASA instructed the crew members in Dragon to end safe haven procedures and return to planned operations aboard the International Space Station.

GeneralValue 3.8
NASA issues order to space station astronauts to “shelter” for possible evacuation but rescinds it (updated)
Jun 5, 2026

Apex Space announced a $200 million Series C in April 2025.

FinancialGrowthRelationshipsValue 4.0
Apex Raises $200M At $2.3B Valuation
Jun 5, 2026

Apex Space hired Michael Kopet as chief financial officer.

GovernanceValue 3.5
Apex Raises $200M At $2.3B Valuation
Jun 5, 2026

Apex Space is pursuing Project Shadow separately in parallel with its Golden Dome work.

PlanValue 2.0
Apex Raises $200M At $2.3B Valuation
Jun 5, 2026

Michael Kopet was previously vice president of finance at Axon.

GovernanceValue 2.2
Apex Raises $200M At $2.3B Valuation
Jun 5, 2026

Apex Space plans to reach 100% vertical integration as it scales up and needs higher-volume parts.

GrowthCapabilityValue 3.2
Apex Raises $200M At $2.3B Valuation
Jun 5, 2026

The CZ-8A will replace the CZ-8 in the future.

PlanValue 2.5
By the way the CZ-8 (regular) has stopped of production. The 8A will replace the 8 in the future.
Jun 5, 2026

Production of the CZ-8 has stopped.

PlanGeneralValue 1.8
By the way the CZ-8 (regular) has stopped of production. The 8A will replace the 8 in the future.
Jun 5, 2026

The flatsat platform is intended to support the design, testing, and validation of secure satellite software and hardware architectures and cyber defense mechanisms.

CapabilityValue 3.6
DND launches Flatsat Prototype Challenge for space cybersecurity
Jun 5, 2026

The challenge focuses on a ground-based satellite platform that integrates critical satellite subsystems for controlled cybersecurity experimentation.

CapabilityGeneralValue 2.0
DND launches Flatsat Prototype Challenge for space cybersecurity
Jun 5, 2026

A majority of each applicant's full-time workforce and senior executives must reside in Canada.

LegalValue 3.5
DND launches Flatsat Prototype Challenge for space cybersecurity
Jun 5, 2026

Each selected project can receive up to $2 million for a maximum duration of 20 months.

FinancialPlanValue 4.0
DND launches Flatsat Prototype Challenge for space cybersecurity
Jun 5, 2026

Eligible applicants must be for-profit entities incorporated in Canada with 499 or fewer full-time equivalent employees.

LegalValue 2.0
DND launches Flatsat Prototype Challenge for space cybersecurity
Jun 5, 2026

Half or more of each applicant's wages must go to employees working in Canada.

LegalValue 2.2
DND launches Flatsat Prototype Challenge for space cybersecurity
Jun 5, 2026

Applicants must conduct their research and development activities in Canada.

LegalGeneralValue 2.0
DND launches Flatsat Prototype Challenge for space cybersecurity
Jun 5, 2026

The government expects to award two contracts under the challenge.

PlanValue 1.5
DND launches Flatsat Prototype Challenge for space cybersecurity
Jun 5, 2026

The Department of National Defence and Innovative Solutions Canada have opened a funding challenge to develop a laboratory-based flatsat platform for cybersecurity experimentation.

LegalCapabilityGeneralValue 3.2

Roscosmos will conduct a more extensive repair operation on the Zvezda transfer tunnel on Friday, June 5, 2026.

PlanGeneralValue 3.0
Image
Jun 5, 2026

One of the Zvezda transfer chamber leak sites was sealed with the two-component sealant Germetel-1.

CapabilityGeneralValue 3.0
Image
Jun 5, 2026

Roscosmos manages the Zvezda transfer tunnel crack issue through operational mitigation measures and periodic partial repairs.

CapabilityGeneralValue 3.0
Image
Jun 5, 2026

The Zvezda service module transfer tunnel, known as PrK, has had cracks and leaks for some time.

CapabilityGeneralValue 2.0
Image
Jun 5, 2026

NASA and Roscosmos have been working to determine the root cause of the cracks in the Zvezda service module transfer tunnel.

CapabilityValue 3.5
Image
Jun 5, 2026

The second Zvezda transfer chamber leak site is located on the conical portion of the transfer chamber and is being prepared for sealing.

CapabilityValue 3.8
Image
Jun 5, 2026

NASA directed all four SpaceX Crew-12 members and NASA astronaut Chris Williams to assume an elevated safety posture in the Dragon spacecraft during the repair.

CapabilityGeneralValue 2.8
Image
Jun 5, 2026

The Zvezda transfer chamber leaks pose no threat to the safety of the crew or the International Space Station's onboard systems.

GeneralValue 2.0
Image
Jun 5, 2026

Specialists found two air leaks in the Zvezda module of the Russian segment of the International Space Station during pressurization of the module's transfer chamber.

CapabilityValue 2.5
Image
Jun 5, 2026

Axiom Space’s new financing round exceeded its previously announced US$350 million target by US$175 million.

FinancialGrowthValue 4.7
Investor demand drives Axiom Space to close $525 million financing round
Jun 5, 2026

Axiom Space closed an oversubscribed financing round totaling more than US$525 million.

FinancialGrowthValue 4.5
Investor demand drives Axiom Space to close $525 million financing round
Jun 5, 2026

Takumi Hashizume is Managing Director and Head of the Space Innovation Office at MUFG Bank, Ltd.

GovernanceValue 3.6
Investor demand drives Axiom Space to close $525 million financing round
Jun 5, 2026

Axiom Space is working to meet milestones for its planned commercial space station and ongoing NASA contract requirements.

PlanGeneralValue 2.0
Investor demand drives Axiom Space to close $525 million financing round
Jun 5, 2026

MUFG Bank joined Axiom Space’s cap table in the new financing round.

RelationshipsFinancialValue 4.0
Investor demand drives Axiom Space to close $525 million financing round
Jun 5, 2026

Axiom Space will use the new capital for development of Axiom Station, production of the Axiom Extravehicular Mobility Unit spacesuit, and more commercial human spaceflight missions.

PlanGrowthCapabilityValue 4.0

Andrew Newman is affiliated with Carnegie Science in Pasadena, California.

GovernanceGeneralValue 1.2
Jwst misura la massa di un buco nero nell’universo lontano
Jun 5, 2026

LandSpace’s image shows the ZQ-2E and ZQ-3 launch vehicles standing vertically at launch pads.

CapabilityGeneralValue 3.0
Land Space's post shows ZQ2E and ZQ3 vertical at the pads. Hints the coming two launches.
Jun 5, 2026

LandSpace has two upcoming launches involving ZQ-2E and ZQ-3.

PlanValue 4.0
Land Space's post shows ZQ2E and ZQ3 vertical at the pads. Hints the coming two launches.
Jun 5, 2026

Long March 8 Y9 launched SpaceSail Group-12 from Hainan at 06:34 UTC on June 5, 2026.

PlanValue 4.0
🚀 Long March 8 Y9 🕡 06:34UTC June 5 📍 Hainan 🛰️ SpaceSail Group-12
Jun 5, 2026

Long March 6A Y25 launched SpaceSail Group-11 from Taiyuan at 11:39 UTC on June 4, 2026.

PlanCapabilityValue 4.0
🚀 Long March 8 Y9 🕡 06:34UTC June 5 📍 Hainan 🛰️ SpaceSail Group-12
Jun 5, 2026

On June 5, NASA ordered five astronauts on the International Space Station to shelter in the Dragon spacecraft and prepare for a possible emergency evacuation because of an air leak in the Russian segment of the station.

GeneralPlanValue 4.0
Los astronautas de la NASA se refugian en la nave Dragon dos horas tras una fuga de aire en la ISS
Jun 5, 2026

The air leak affected the Zvezda service module of the International Space Station.

GeneralValue 3.5
Los astronautas de la NASA se refugian en la nave Dragon dos horas tras una fuga de aire en la ISS
Jun 5, 2026

Jessica Meir, Jack Hathaway, Sophie Adenot, and Andrey Fedyaev are members of SpaceX Crew-12.

GovernanceValue 4.0
Los astronautas de la NASA se refugian en la nave Dragon dos horas tras una fuga de aire en la ISS
Jun 5, 2026

Roscosmos decided to carry out a more extensive repair in the area of the cracks in the International Space Station's Russian segment.

PlanCapabilityValue 2.8
Los astronautas de la NASA se refugian en la nave Dragon dos horas tras una fuga de aire en la ISS
Jun 5, 2026

NASA later instructed the crew inside Dragon to end the safe-haven procedures and return to normal operations aboard the International Space Station.

PlanGeneralValue 3.0
Los astronautas de la NASA se refugian en la nave Dragon dos horas tras una fuga de aire en la ISS
Jun 5, 2026

Roscosmos has mitigated the Zvezda service module transfer tunnel cracks and leaks through operational measures and periodic partial repairs.

CapabilityValue 3.0
NASA issues order to space station astronauts to “shelter” for possible evacuation but rescinds it (updated)
Jun 5, 2026

NASA later instructed the crew members inside the Dragon spacecraft to end the safe haven procedures and return to planned operations aboard the International Space Station.

PlanGeneralValue 3.0
NASA issues order to space station astronauts to “shelter” for possible evacuation but rescinds it (updated)
Jun 5, 2026

NASA directed all four SpaceX Crew-12 members and NASA astronaut Chris Williams to move into the Dragon spacecraft under the ISS Safe Haven contingency plan.

PlanValue 4.6
NASA issues order to space station astronauts to “shelter” for possible evacuation but rescinds it (updated)
Jun 5, 2026

The Zvezda service module transfer tunnel on the International Space Station, known as PrK, has had cracks and leaks for some time.

CapabilityValue 3.0
NASA issues order to space station astronauts to “shelter” for possible evacuation but rescinds it (updated)
Jun 5, 2026

Roscosmos planned a more extensive repair operation on the Zvezda service module transfer tunnel for Friday, June 5.

PlanCapabilityValue 3.7
NASA issues order to space station astronauts to “shelter” for possible evacuation but rescinds it (updated)
Jun 5, 2026

Roscosmos paused the Friday structural repair efforts inside the Zvezda service module transfer tunnel while it assessed more measurements and data.

PlanCapabilityValue 3.0
NASA issues order to space station astronauts to “shelter” for possible evacuation but rescinds it (updated)
Jun 5, 2026

The Zvezda service module transfer tunnel on the International Space Station has had cracks and leaks for some time.

CapabilityValue 2.2
NASA issues order to space station astronauts to “shelter” for possible evacuation but rescinds it (updated)
Jun 5, 2026

Roscosmos planned a more extensive repair operation inside the Zvezda service module transfer tunnel on Friday, June 5.

PlanValue 3.5
NASA issues order to space station astronauts to “shelter” for possible evacuation but rescinds it (updated)
Jun 5, 2026

Roscosmos later paused the structural repair efforts inside the Zvezda service module transfer tunnel, and NASA instructed the crew members in Dragon to end safe haven procedures and return to planned operations aboard the International Space Station.

GeneralValue 3.8
NASA issues order to space station astronauts to “shelter” for possible evacuation but rescinds it (updated)
Jun 5, 2026
Previous
Page315of3978
Next
DND launches Flatsat Prototype Challenge for space cybersecurity
Jun 5, 2026
Investor demand drives Axiom Space to close $525 million financing round
Jun 5, 2026